EVLA MONITOR & CONTROL CDR

Slides:



Advertisements
Similar presentations
How to install “bubble” fonts These fonts are used to create the Formative Assessment sheets.
Advertisements

Montreal AeroPlus Proprietary Information 15 Jan Page 1 Supplied in confidence to Frontier Flying Service Inc. as part of contract specified in.
Author George Peck EVLA Hardware Monitor and Control PDR March 13, APPLICATIONS AND DEVICE INTERFACE ISSUES.
EVLA SAMPLERS " High speed wide band 3-bit for most bands " Lower speed narrower band 8-bit for bands with RFI. 1.
Bob Hayward Receiver Engineer Feed & Front End PDR Feb Feed & Front End PDR Monitor & Control and Cryogenics.
SJDLO/IF/FO - May 19-20, Production & Maintenance Steven J. Durand Thursday - May 20, 2004.
James Robnett EVLA M&C Hardware PDR March EVLA Monitor and Control M&C Network.
Chuck KutzEVLA Front-End CDR – Low Frequency Receivers April 24, EVLA Front-End CDR EVLA Low Frequency Receiver Capability.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
Author Wayne M. Koski EVLA Monitor & Control Software PDR May 14 & 15, EVLA Monitor and Control Module Interface Board (MIB) Design.
Unit 5: ICT Tools Thursday, October 01, Unit Overview Made up of the following sections: –Equipment –Selecting Resources –Value for Money –Free.
2015 Innovative Industrial Solutions Remote Monitoring Technology and Custom Shielding Benchmark Meeting 2015 Innovative Industrial Solutions Remote Monitoring.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Paul HardenEVLA LO-IF CDR May 17, IF Subsystem Specs & Measured Test Data.
` $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Wayne M. KoskiEVLA Front-End CDR – EVLA Receiver Monitor & Control April 24, EVLA Front-End CDR EVLA Receiver Monitor & Control F317 and F320 Modules.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Module Interface Board (MIB) Design.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
SJDAdvisory Committee Dec Production & Maintenance Steven J. Durand December, 2004.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
James Robnett EVLA M&C Hardware CDR October 20, EVLA Monitor and Control M&C Network.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, MIB FUNCTIONALITY.
Author EVLA Feed & FE PDR 12/13 Feb, EVLA Receivers PDR RFI Issues Daniel (Mert) Mertely.
Paul Harden VLA Veteran EVLA LO-IF PDR 22 January EVLA IF/LO EVLA “LOW BAND” CONVERTERS For 4/P/L/S/C and Ku Bands.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Slot – ID.
Brent WilloughbyEVLA Front-End CDR – WVR Option 24 April EVLA Front-End CDR Water Vapor Radiometer Option.
Bill SahrNSF Review May , EVLA Monitor & Control.
` $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
EVLA M&C CDR EVLA Monitor Data Archive System John Benson, Chunai Cai NRAO Dec 6, 2006.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
Double Star meeting ESTEC 25/26 March Hardware Status Engineering breadboard fabricated to validate the FPGA concept – Using an ACTEL A1280 – Tested.
Future LBO Developments
continued on next slide
Production & Maintenance
EVLA Advisory Committee Meeting System Status
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
EVLA MIB Software Critical Design Review
LO/IF System Requirements
EVLA LO/IF Racks/Bin/Modules
Hooking up a Promethean ActivBoard to a Laptop Model # PRM-AB387-03
זכויות סוציאליות.
Welcome Introduction of Panel members Charge to Panel
EVLA MONITOR & CONTROL CDR
PLC Hardware Components.
DAQ Racks, Bins and Modules Internal Design Review
EVLA Front-End CDR – Solar Mode
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
Energy Customer Collaboration Documentum:
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
Terry Cotter LO/IF Group Leader
ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.
II //II // \ Others Q.
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
EVLA Advisory Panel Mtg. System Overview
75 previous answer What is of 37.5? ? go to.
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
continued on next slide
Sequences Example Continue the following sequences for the next two terms 1, 2, 3, 4, 5, ……… 2, 4, 6, 8, 10, ………… 1, 3, 5, 7, 9, ………….. 4, 8, 12, 16, ………….
75 previous answer What is of 60? ? go to.
continued on next slide
Presentation transcript:

EVLA MONITOR & CONTROL CDR RFI TEST RESULTS EVLA Monitor & Control Hardware CDR October 20, 2004

EVLA Monitor & Control Hardware CDR MIB Board Test Results EVLA Monitor & Control Hardware CDR October 20, 2004

EVLA Monitor & Control Hardware CDR MIB Board Test Results MIB Is 25 dB Below FCC Part 15-B RFI Limit MIB is 48 dB Below Commercial VCMA9 Board EVLA Monitor & Control Hardware CDR October 20, 2004

Shielding Function Applied To MIB RFI MIB Is Below EVLA Harmful Levels When Shielding Function Is Applied To Type II (Double Wide) Module EVLA Monitor & Control Hardware CDR October 20, 2004

Shielding Function Applied To MIB RFI EVLA Monitor & Control Hardware CDR October 20, 2004

Explanation Of Previous Slide EVLA Monitor & Control Hardware CDR October 20, 2004

Commercial Board Test Results EVLA Monitor & Control Hardware CDR October 20, 2004

EVLA Monitor & Control Hardware CDR Cost Savings Less Shielding Needed Wires Attached To MIB And Leading Out Of RFI Enclosure Must Be Shielded EVLA Monitor & Control Hardware CDR October 20, 2004