HMA Follow On Activities

Slides:



Advertisements
Similar presentations
Special Ed Director Meeting December 17, Agenda SSEM Statistics/Facts October Follow Up Forms Release SSEM 5.1 Release Current Issues/Questions.
Advertisements

3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Agenda Start up admin: roll call, approve agenda, appoint minute takers, approve last meeting minutes Review and approve latest draft of spec Issue discussion:
OGC Update WGISS-19 - March 2005 Allan Doyle, GSDI/EOGEO
ESA UNCLASSIFIED – For Official Use INSPIRE Orthoimagery TWG Status Report Antonio Romeo ESRIN 15/02/2012.
HMA Sep 2009 – Slide 1 Daniele Marchionni Elsag Datamat HMA Follow On – Task 4 - Workplan.
05 October 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Teleconference, 22 October 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Progress Meeting 26 Nov 2008, by.
3 November 2009 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Page 1 Arnaud Cauchy, EADS Astrium 6th of November 2013 ESA HMA AWG HMA-S WP6100 WPS2.0 Specification Session 4: State of the art technology and standards,
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
HMA-FO ODA, January 2011 HMA Follow-On Task 3 Online Data Access in the frame of ESA's Heterogeneous Missions Accessibility (HMA) initiative Acceptance.
SysML Modelica Integration Working Group Report (SE DSIG Meeting, San Antonio, TX, 9/15/2009) Chris Paredis Georgia Tech 1.
® Sponsored by Architecture DWG 98th OGC Technical Committee Washington, DC USA Carl Reed, Joan Maso 10 March 2016 Copyright © 2016 Open Geospatial Consortium.
5 July 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) MTR 5 July.
HMA-T Phase 2 KO, 2-3 July 2008 Slide 1 HMA-Testbed Phase 2 Negotiation and KO Meeting 2-3 July 2008, Frascati Yves Coene, SPACEBEL.
HMA AWG, 6 November 2013 Slide 1 HMA for Science - Status HMA AWG Meeting 6 November 2013, ESRIN Frascati Yves Coene, Spacebel s.a. Claudio Gizzi, Astrium.
Page 1 Arnaud Cauchy, Airbus Defence & Space 11th of June 2014 ESA HMA-S Project DDR Meeting WP6100 – WPS2.0 Specification HMA-S Final Presentation – WP6100.
Spacebel - Hoeilaart, February 2009 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 Acceptance Review 1 18.
HMA Slide 1 Heterogeneous Missions Accessibility Follow On Pier Giorgio Marchetti - European Space Agency
19 Feb 2009, Spacebel (Hoeilaart) OGC and activities HMA-T Phase 2 AR Meeting 19 Feb 2009, Spacebel (Hoeilaart) Frédéric Houbie, ERDAS.
19 January 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
Frascati, 2-3 July 2008 SPS Mandatory I/F Development Slide 1 HMA SPS Mandatory I/F Development HMA-T Phase 2 KO Meeting 2-3 July 2008, Frascati Ricardo.
HMA Follow On Activities
HMA AWG Configuration Management Status 1 December 2008
Technical Meeting ESA/ESRIN,
HMA Follow On Activities
Task 2.6 Eric Delory PLOCAN
Implementation Review Team Meeting
ISO/TC 204 WG 3-Database Technologies
CEOS OpenSearch Project II
HMA Follow On Activities
Oct 22 Group Leaders Planning meeting
Ordering Services for EO Products SWG ATS / ETS
Space Communication Cross Support Architecture WG
HMA-S Final Presentation OGC DSEO Protocol
HMA Follow On Activities
PROGRAM CONSULTATIVE FORUM Meeting pack
HMA SPS Mandatory I/F Development
Ordering Services for EO Products SWG ATS / ETS
CEOS OpenSearch Project II
HMA Follow On Activities
Request for Proposal (RFP)
HMA Follow On Activities
Overview of Progress HMA Standardisation Work
CEOS Work planning Steven Hosford, ESA/CNES, CEO
HMA-FO Task 1 Workplan HMA AWG 30th of September 2009 Darmstadt OGC TC
HMA-Testbed Phase 2 AR-2 Meeting July 2009, Frascati
HMA Follow On Activities
CEOS OpenSearch Project II
Standardisation Status Update
March 2009 Closing Report for TGmb
CITE tests for and HMA-T Phase 2 Progress Meeting
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
Ordering Services for EO Products Abstract Test Suite (ATS)
CEOS OpenSearch Conformance Test Document
HMA Follow-on Kickoff Meeting
OGC and activities HMA-T Phase 2 KO Meeting
<month year> doc.: IEEE ptc November 2012
Status OpenSearch Standardisation Activities - HMA-S Project
HMA Follow On Task 4 - Order Final Presentation 21 June 2011
<month year> doc.: IEEE ptc May 2013
SWE 2.0 – Current Status of Standards
LAMAS Working Group 6-7 December 2017
Task Group AY May 2016 Closing Report
Final Version (after MS revision)
EO profile for WMS progress report
Presentation transcript:

HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly Progress Meeting 3 November 2009 Reuben Wright, Deimos Space Johannes Echterhoff, iGSI Philippe Merigot, Spot Image

Schedule Deliverables Work in Progress SPS 2.0 (OGC09-000) sweCommon (OGC 08-094) SPS for EO Application profile (OGC 07-018) SFRE Requirements Baseline Document

Schedule 1/2

Schedule 2/2

Proposal Information: List of Documentation Deliverables

Proposal Information: List of Software Deliverables

Work in Progress: SPS 2.0 (OGC09-000) Status of specification Key dates: Nov 19th 2009: three-week rule for OGC meeting in December SPS / SWES specifications ready only minor changes before OGC meeting Dec 7th – 11th 2009: OGC meeting in USA presentation of specification in SPS SWG SWG vote for release into RFC (request for comment phase) After TC: 30 day comment period review of comments at TC in March 2010 final version of SPS 2.0 at least three weeks prior to TC meeting June, 2010 TC in June 2010: SWG vote to release for adoption TC/PC vote to release for adoption 60 day IPR review and eVote

Work in Progress: SPS 2.0 (OGC09-000) Outstanding issues finalization of SWE Common Service Model (OGC 09-001) – foreseen for Nov 19th 2009 migration to OWS Common 1.2 OWS Common 1.2 is currently in eVote for adoption (ends Nov. 20th, 2009) we have some comments on the spec decision tbd. during RFC phase writing of specification according to “The Specification Model” (OGC 08-131r3) Abstract Test Suite ready for review on Nov 19th 2009 possibility to revise / enhance the test suite according to comments from HMA and others

Work in Progress: sweCommon (OGC 08-094) Status of specification Finalization foreseen for Nov 19th – out for comments and edits Reorganized to match requirements of the new OGC specification model (OGC 08-131r3). UML models, XML schemas and the latest specification available for comments on the attachment section of the specification page: http://portal.opengeospatial.org/twiki/bin/view/SWECommonswg/SpecificationDocument SWG discussion on email list and teleconferences managed by Alexandre Robin Outstanding issues Technical points from Nov 2 teleconference agenda are: Do we need to keep choiceValue in DataChoice? Do we need to make “definition” mandatory? How do we model conditional value? Can we define “ObservableProperty” in SensorML?

Work in Progress: SPS for EO Application profile (OGC 07-018) Status of specification Finalization foreseen for Nov 19th Development alongside SPS 2.0 High-level ESA requirements believed to be collected Outstanding issues Produce a summary of the understanding of requirements for 13 November so that it can be checked.

Work in Progress: SFRE Requirements Baseline Document Status of document First draft on 19/10/09 Undergoing review Document needs to be issued before PR, but expected to be finalised before then Outstanding issues The description of the high level requirements of SFRE linked to the objectives of the SPS EO specification work Granularity of requirements (noting that a full SRD will be created later) What activities the Client is to allow the user to perform, and how it displays results to them. Not directly related to HMA specification testing, but desire to demonstrate their use.