Development of guidelines

Slides:



Advertisements
Similar presentations
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
Advertisements

WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Jorge RODRIGUEZ ROMERO 1 EU Water Framework Directive Improving the communication of the intercalibration exercise WG A ECOSTAT meeting Ispra, March.
ECOSTAT 1-2 October 2008 Intercalibration – status of ongoing work – Coastal/Transitional Presented by Wouter van de Bund Joint Research Centre Institute.
WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.
Updating the intercalibration process guidance Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Tanzania JAS: Proposed work program for Joint Analysis /Programming
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
SPI activity ( ) – Final phase (Avril to June 2012)
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
DG Environment, Unit D.2 Marine Environment and Water Industry
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Draft Article 8 MSFD assessment guidance
CIS guidance document on E-Flows
WG 2A Ecological Status Drafting group: Guidance on the process of the intercalibration excercise 2nd meeting WG2A, 15-17/10/03.
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Improving assessment of GES Draft conclusions and Way forward
Intercalibration Report on State - of - play and way forward Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute for Environment.
River GIGs: Future intercalibration needs/plans Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
CIS General progress report WD meeting 16 June 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European Commission.
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
River GIGs: Checking and completing the Decision Annex Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
on Priority Substances Strategic Coordination Group
Harmonisation Activity Progress report
Discussion agenda Summary & proposals (30 min)
Common Implementation Strategy for the
Francesca M. SOMMA - EC - DG JRC MSCG Meeting – Brussels,
Timetable Phase Date Collect feedback from MS on options 1, 2 and 3 presented by the EC (reporting 1b WFD-related measures for MSFD). 21 February Separate.
"Financing Natura 2000 Guidance and Workshops”
NATURA 2000 and Water Framework Directive (CIS )
Working Group A ECOSTAT Update on intercalibration Prepared by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Priority substances Water Directors meeting Paris November 2008
Draft Mandate and Proposed Approach for the Drafting Group on
Steering Committee, Eurostat, Luxembourg, 4 February 2011
WFD – CIS Working group A ECOSTAT
WFD and Hydro-morphology
Progress CIS Activity on CC&Water 20 May 2009 Marieke van Nood, Unit D
Activities of WG A Ecological Status
ETS WG, 30 January-1 February 2006 Agenda Item
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
WG E on Priority Substances
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
River groups with extension
WG A ECOSTAT Intercalibration guidance : Annexes III, V, VI
Status of the Nutrient Best Practice Guide
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
Standardisation/Harmonisation
Strategic Co-ordination Group May 2009
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
Invasive Alien Species
EU Water Framework Directive
Common Implementation Strategy for the
Planning to develop the CIS Work Programme
EU Water Framework Directive
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
Fish intercalibration – rivers Progress and expected outcome
EU Water Framework Directive
WG A Ecological Status Progress report October 2010 – May 2011
Baltic Sea GIG Status Ecostat 23 April 2013
Presentation to the GNI Committee
Next steps for "Monitoring concept"
Questionnaire on Elaboration of the MSFD Initial Assessment
Presentation transcript:

Development of guidelines Drafting group: WG Lead - Wouter Van de Bund (JRC), Peter Pollard (UK), Ulrich Irmer (DE) DG ENV – Jorge Rodriguez Romero BE – Wim Gabriels DK – Jens Brogger Jensen ES – María Jesús De La Fuente FR – Jean Gabriel Wasson

Development of guidelines Timetable Written comments from ECOSTAT by 20 April JRC will compile the ECOSTAT comments and send them to the drafting group by 24 April Drafting group will work to have a compiled draft by 4 May Written comments from drafting group by 10 May Distribute the draft to Committee (for information) and ECOSTAT (for consultation) by 11 May Written comments from ECOSTAT by 28 May Drafting group to prepare final draft and distribute it to ECOSTAT by 20 June

Development of guidelines Who does what Translation of the results into national systems: General drafting: UK (to be confirmed) Contribution on translating results from IC types to national types: ES Reference conditions: General drafting and inclusion of reference criteria table: FR Contribution to development of reference conditions in case there are no reference sites: BE General coordination, compilation of contributions: JRC Review of the compiled draft: DG ENV