Sites Indoor (37 Swisscom sites + 17 CERN sites) LHC: Transfer lines :

Slides:



Advertisements
Similar presentations
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

SPL Integration Layout Impact on cryo and vacuum sectorisation ◊ Underground obstacles, constraints on slope and length of the SPL ◊ Continuous cryostat.
LHeC J.Osborne / A.Kosmicki CERN/GS 60Gev Energy Recovery Linac.
CERN Mobile network migration
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
CERN Mobile network migration Rodrigo Sierra Communication Systems group, IT Department, CERN.
TELECOM Tuesday 12 November 2002Group meeting - IT/CS/TEL/L.G : losing or keeping time ? Topics Topics Radio Radio Video Video.
Evolution of mobile telephony and data at CERN
INFRASTRUCTURE SYSTEMS & RADIATION EFFECTS J.P. Saraiva (CERN R2E Project) October 14, 2014 R2E & Availability Workshop.
2 Stefano Agosta CERN IT/Communication Systems High-Speed Mobile Communications in Hostile Environments CHEP 2015 Okinawa 14/04/2015 High-Speed Mobile.
Everything you always wanted to know about… …CERN’s new mobile operator Peter JURCSO BE-CO-IN.
The new MEF Group S. Baird 12 th December The new MEF Group Mandate for the MEF Group MEF structure Support for LHC experiments Formal meetings/committees.
TETRA (CERN’s Safety Radio Communication Network)
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
LHC Fire & Gas Detection Rui Nunes ST/AA/AS. Rui Nunes ST/AA/AS - STTC 21 Feb 2000 Project Goals Install in LHC –Fire Detection –Flammable Gas Detection.
Geo-localisation in CERN’s underground facilities CERN has recently deployed a digital radio network, based on TETRA technology, to be used by the Fire.
CERN IT Department CH-1211 Genève 23 Switzerland t Communication Services Projects & Services During LS2 F. Chapron IT/CS 29 th and 30 th.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Louis Hammouti. AGENDA 1. Introduction 2.Access authorizations more restrictive in the experiments 3.Access request managed by EDH 4.Access rules 5.Authorization.
ATC/ABOC Days, 22 January 2007 The safety electrical networks at CERN Anne Funken, TS-EL.
ACCU meeting Dec. 5, LHC 2008 Communication Events to celebrate the LHC Start Up in 2008.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
V f λ.
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Linac 4 SPL tunnel Material access and services shaft Personnel and material access shaft Klystron gallery Emergency exit shaft Transfert line to PS2 Personnel.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
CERN IT Department CH-1211 Genève 23 Switzerland t Communication Services Projects & Services During YETS 20015/16 F. Chapron IT/CS.
YETS & LS2 Works EN-EL / Power distribution
European Organization for Nuclear Research
TETRA (CERN’s Safety Radio Communication Network)
Situation of the Static Var Compensators at CERN.
CERN Mobile network migration
Framework Schedule from EYETS 2016 to LS2
EYETS Works EN-EL [ FC excluded ]
YETS & LS2 Works EN-El on LHC / Power distribution
LHCOPN update Brookhaven, 4th of April 2017
Un anno al CERN ITP Academy 2017 – Benvenuti! 6/1/2018
F. Audinet, C. Martel : Cern GS-SE-HE
The open loop gain of this op-amp is 105 and the bandwidth is 10 Hz
85th ACCU Meeting of 9 September 2009
Consolidation and development of the CERN radiating cable infrastructure in PS and TT2 F. Chapron IT/CS.
VDSL & Wi-Fi inside the LHC tunnel Mobile service 3G/4G in LHC tunnel
the high-voltage network of CERN ToMORROW
Special LS1 day on 12 June 2012, EDMS:
Use Cases - Cryo Services Speaker: Klaus Barth on behalf of TE/CRG
Underground mobile communications at CERN
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
YETS & LS2 Works EN-EL / Power distribution
V f λ.
CONSOLIDATION CPS-BL SYSTEM
Computational Fluid Dynamic at CERN
Power cut 18kV cable for EMD404/E9 is heating
Yesterday Issue of injection kicker not pulsing:
Revival of the cern ps neutrino beam
Elias Métral for the BLRWG ( min, 21 slides)
CSP Meeting CERN CERN Accelerators in th November 2010
,. . ' ;; '.. I I tI I t : /..: /.. ' : ····t I 'h I.;.; '..'.. I ' :".:".
Present and Future test facilities for High-intensity Targetry CERN
Safety memo PPE - What I must remember
EN Safety Talks Motivation and Concept
TE-EPC PIQUET BAD MANIPULATION
10k 20k Vin Vout H3 What is the gain?
ABP/RTL Main RTL Activities for 2007/8:-


Presentation transcript:

Sites Indoor (37 Swisscom sites + 17 CERN sites) LHC: Transfer lines : 9 sites on the surface covering the lifts and caverns 16 CERN sites in the REs covering the tunnel SCX5 Transfer lines : 1 sites covering TI2 and 1 CERN site covering TI8 SPS (8 sites) Meyrin: PS, AD, LINAC3, LINAC 4, N_TOF, CFT3, ISR, DIRAC, ISOLDE Buildings 358, 2013, 839 Prevessin: North area, building 911 SM18 (1 site) Transmission: Buildings 58, 513, 874

Frequencies (MHz) TETRA 415&425 LTE 791-862 2G/3G 880-960 All underground facilities (with leaky feeder) ATLAS, ALICE, CMS & LCHb Bandwidth: TETRA: 25 KHz 2G: 200 KHz 3G: 5MHz LTE (4G): 20MHz TETRA 415&425 LTE 791-862 2G/3G 880-960 TETRA 415&425 LTE 791-862 2G/3G 880-960 LTE-A 1710-1880 12/6/2018 Document reference