W. T. Weng Brookhaven National Laboratory

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Ion Accelerator Complex for MEIC January 28, 2010.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
17 Dec. 2008M. Dracos, EUROnu-WP21 Collector and the SPL Super-Beam Project Marcos Dracos IPHC-IN2P3/CNRS Strasbourg.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Front End Technologies Harold Kirk Brookhaven National Laboratory February 19, 2014.
FFAG Fixed Field Alternating Gradient synchrotrons, FFAGs, combine some of the main advantages of both cyclotrons and synchrotrons:  Fixed magnetic field.
Future Accelerators at the energy frontier Peter Hansen february 2010 University of Copenhagen.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
F Project X Overview Dave McGinnis October 12, 2007.
Front-End Design Overview Diktys Stratakis Brookhaven National Laboratory February 19, 2014 D. Stratakis | DOE Review of MAP (FNAL, February 19-20, 2014)1.
Secondary Particle Production and Capture for Muon Accelerator Applications S.J. Brooks, RAL, Oxfordshire, UK Abstract Intense pulsed.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
Initiative in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon, OX11 0QX, UK.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
J. Pasternak First Ideas on the Design of the Beam Transport and the Final Focus for the NF Target J. Pasternak, Imperial College London / RAL STFC ,
Highlights of Tuesday’s session Machine aspects Copyright © Dale Carnegie & Associates, Inc.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
STATUS OF BNL SUPER NEUTRINO BEAM PRORAM W. T. Weng Brookhaven National Laboratory NBI2003, KEK November 7-11, 2003.
The High Intensity Frontier Franco Cervelli INFN-Pisa 7 Nov, 2005.
Proton FFAG Accelerator R&D at BNL Alessandro G. Ruggiero Brookhaven National Laboratory Alessandro G. Ruggiero Brookhaven National Laboratory.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
Alain Blondel -- After the ISS -- What did ISS achieve? 1. Established a « baseline » for the accelerator study 2. Rejuvenated simulation and study of.
DESIGN OF THE BNL SUPER NEUTRINO BEAM FACILITY W. T. Weng Brookhaven National Laboratory Neutrino Super Beam, Detectors and Proton Decay BNL/UCLA/APS Workshop.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
THE DESIGN OF THE AGS-BASED PROTON DRIVER FOR NEUTRINO FACTORY W.T. WENG, BNL FFAG WORKSHOP JULY 7-11, 2003 KEK, JAPAN.
General remarks: I am impressed with the quantity and quality of the work presented here and the functioning of the organization. I thank ILC and FNAL.
EUROnu Costing Workshop May 2011 Beta-Beam Costing Exercise Elena Wildner, CERN 25/05/11 1 EUROnu Costing Workshop, CERN May 2011.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
Project X: Accelerators Sergei Nagaitsev September 2, 2011.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
MCS meeting 20/11/2015 S. Guiducci. Introduction Yesterday meeting has shown an interest in a large physics community to incremental development of muon.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Fermilab-India Agreements and Collaboration Shekhar Mishra Project-X, International Collaboration Coodinator Fermi National Accelerator Laboratory Batavia,
LHC Injectors Upgrade Project 11/11/2010 R. Garoby.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Challenges and Progress on the SB Horn Design
The Accelerator Complex from the International Design Study
Jeffrey Eldred, Sasha Valishev AAC Workshop 2016
Plans for a Superconducting Proton Linac at CERN
Second SPL Collaboration Meeting, Vancouver May 2009
MOMENT Overview Jingyu Tang Institute of High Energy Physics, CAS
Status of the beta-beam study
Summary of session 5: Innovative Ideas and New R&D
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
Superbeams with SPL at CERN
Meson Production Efficiencies
Progress towards Pulsed Multi-MW CERN Proton Drivers
A High Intensity Neutrino Oscillation Facility in Europe
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
Accelerators for Future Neutrino Facilities: Strengths and Challenges
General Issues for a Multi-MW driver
SNS-PPU upgrades the existing accelerator structure
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

W. T. Weng Brookhaven National Laboratory ACCELERATOR ASPECTS W. T. Weng Brookhaven National Laboratory Physics with a Multi-MW Proton Source May 25-27, 2004, CERN W.T. Weng W.T. Weng

Thanks I would like to thank the organizer and CERN for the well-organized workshop on the important physics to be done at MW proton accelerators, with potential of fundamental discoveries, also for the hospitality given to us. W.T. Weng

Outline Summary of Talks on Accelerator Design Design of the Proton Driver Target/Horn and Neutrino Beam Beam Losses and Shielding RAMI R&D and Upgrade Paths Conclusions W.T. Weng

Talks in Accelerator Session R. Garoby, SPL at CERN C. Prior, RSC Options H. Haseroth, Target/Horn & NuFact M. Apollonio, HARP A. Mueller, Nuclear Phys/EURISOL M. Lindroos, Beta-Beam W.T. Weng

Design of the Proton Driver SPL block diagram (CDR 1) Design of the Proton Driver Linac 4: up-to-date design Superconducting linac: CDR 1 W.T. Weng

W.T. Weng

Targetry Many difficulties: enormous power density lifetime problemspion capture Replace target between bunches: Liquid mercury jet or rotating solid target Stationary target: Proposed rotating tantalum target ring Densham Sievers W.T. Weng

Comments on Accelerator Design The choice between SPL and RCS has to be decided on the basis of physics goal, but from technical point of view, the SPL is a convincing alternative with great potential to better satisfy most of the needs presented in this workshop. The choice of bulk Nb cavity can provide higher gradient, hence higher energy, or shorter physical length. There are existence proof of high power linac; such as: LAMPF and SNS to assure the feasibility of SPL. W.T. Weng

Accelerator design,--- continued The current SPL design is capable of realizing its goal and is flexible enough for many future programs. The realization of linac4 is a very valuable first step that can also benefit LHC and proton physics at CERN in general. The challenge of the SPL is in its careful confirmation of emittance growth, beam loss, radiation shielding, reliability, and cost reduction. W.T. Weng

Target / Horn and Neutrino Beam As has been shown that 1 MW target/horn system is feasible; however, the 4 MW one needs active R&D for realization. Current international collaborations include, 1. Material testing at BNL 2. Proposed Hg jet testing at CERN The target/horn system is integrally connected to the proton driver and physics requirements, hence, close communication among those groups are essential. W.T. Weng

Beam Losses and Shielding Develop realistic analysis of beam losses, collimation, and shielding requirements. Remote handling should be provided to reduce human exposure and equipment damage. W.T. Weng

RAMI For a MW facility, the provisions for reliability, availability, and maintenability has to be designed in in the beginning. The radiation shielding, spares, and the maintenance and repair procedure are part of the design thinking W.T. Weng

R&D and Upgrade Paths The suggested R&D items include, ion source, chopper, SRF cavity, target/horn which should be supported with vigor to meet the schedule requirement. Anticipate possible different operation modes and upgrade paths now to minimize cost and interference later. W.T. Weng

Summary and Conclusions The choice of an SPL for the CERN proton driver is realistic and competitive which has no show-stoppers in its current design. The emittance preservation in the SPL needs further analysis with correction provisions. Realistic target/horn has to be developed. CERN should play important role, if not the leading role, in the international collaboration of R&D efforts and encourage participation from its staff, as long as CERN’s core mission is not compromised. W.T. Weng

Conclusions,--- continued Current conceived applications are too varied for an effective project. Intensive discussion among accelerator experts and physicists has to take place to identify realistic phase-I experiments to select proper accelerator configuration (SCL vs RCS), intensity, energy, pulse length, and target/horn design for optimal secondary beam spectrum. Then, other applications and further upgrades can be contemplated. W.T. Weng