Air-Cooled Chillers (ACCL) and Water-Cooled Chillers (WCCL) Certification Program Update 2018.

Slides:



Advertisements
Similar presentations
Integrify 5.0 Tutorial : Creating a New Process
Advertisements

Auto-Graphics Update Mary E. Jackson Product Manager, Resource Sharing October 20, 2010.
Calibration Stand Update
JNACT Update Patty Leyva
1 Addendum Preparation Process ESC-OE Caltrans. 2 Introduction An addendum is a change in contract requirements for an advertised project for which bids.
Product Ratings and Performance Certifications Presented by: Tom Gustafson, Hartzell Fan, Inc. AMCA International Technical Seminar 2009.
Primacy Revision Application The Arsenic Rule. Major Points Components of Primacy Revision Application Attorney General’s Statement Special Primacy Requirements.
PRR 568 – Settlement Timeline PRR 638 – Invoice Timeline PRR 599 – Mismatch Notification COPS January 2006 Updates.
Underwriters Laboratories Inc. Underwriters Laboratories UL Information Technology and Communications Equipment Harmonized Standards for Safety UL 1950,
Advanced Meter Settlement Background and NPRR. Overview PUC Rule (wholesale settlement) Project – Wholesale Settlement Project Filed Deployment.
Company Confidential Registration Management Committee (RMC) Other Party Management Team (OPMT) Resolutions San Diego, CA January 19, 2012 Stanley Faust.
Company Confidential Registration Management Committee (RMC) AS9104/2A Presentation San Diego, CA January 17, 2013 Tim Lee The Boeing Company 1 Other Party.
DEPARTMENT OF HEALTH CARE SERVICES
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
Making every vote count. United States Election Assistance Commission EAC Voting System Certification TGDC Meeting December 9-10, 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
MOA-Track Updates Certified Professional Training October 27, 2015.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
Water is the Natural Choice Water: The Natural Choice For Efficiency – Unit efficiency versus Building System efficiency – Equipment Ratings EER and COP.
AHRI Online Directory A step-by-step guide. Using the AHRI Directory What it is: Finds Certified Performance Rated Matched systems / A.R.I. # - these.
Report January 18, 2016 doc.: /0132r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 18 January 2016 Authors:
Report December 14, 2015 doc.: /0055r0 Jeorge Hurtarte, TeradyneSlide 1 IEEE activities related to NGMN Date: 14 December 2015 Authors:
ENERGY STAR Products Database Kathleen Vokes, US EPA November 20, 2014.
Avena genetic resources for quality in human consumption (AVEQ) Startup Meeting, Clermont Ferrand 2007 Federal Centre of Breeding Research on Cultivated.
OPT Optional Practical Training
Miscellaneous Property Insurance
How to get a paper published in IEEE
E-rate Form 486 Filing Guide FY 2016
TAC Report to the ERCOT Board
GRIDMAN Task Group - Session #103
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
Teacher Evaluation Timeline
Eligibility updates We will begin eligibility updates with Direct Certification. Actually there are no updates but I do want to review a few items that.
and Loudoun County School
Status of the Planning Working Group’s (PWG) Efforts
September Protocol Transition Plan
Updated Sections of the ACCL and WCCL OMs (2016)
SRRTTF TTWG Meeting Dave Dilks July 6, 2016
Design a Relational Database Identify Database Purpose
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
SLED Certification of 3rd Party NCIC Application Software
The Greater Miami Valley EMS Council
Audit Documentation and Administration
CDRL E003 CFAT REPORT TEMPLATE
© Alfa Laval.
Addition of Analytical Methods to California’s Accreditation Program
North Carolina’s Transition to CMDP
Development of Amendment # 2 to UN GTR No. 16 on Tyres
Summer Programs 2016 Class Maintenance
Purchase Order for Services
To the ETS – Encumbrance Online Training Course
Procedural review of initial WG ballot on P802.1CF
Safety Management System Implementation
The Educator Development Solution
Bylaws Revision of Academic Senate Standing Committee Membership
Exit Capacity Substitution and Revision
2nd Grade Highlights & Important Dates
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
Overall Project RAG Status
Higher Ed Training September 2018
Organizing a project kickoff
2018 Bison Fastpitch In-House Schedule
Comments on IMT-Advanced Review Process
LTSEC Auction Timetable
To the ETS – Encumbrance Online Training Course
Preparing for a Stack Test
IEEE IMT-Advanced Review Process
Purchase Order for Services
Money Bills Amendment Procedure and Related Matters Act
Project Kick-off <Customer Name> <Project Name>
Presentation transcript:

Air-Cooled Chillers (ACCL) and Water-Cooled Chillers (WCCL) Certification Program Update 2018

Updated Sections of the ACCL and WCCL OMs (2018) Effective January 1, 2018 Removal of Unit Listing Types (Packaged and Configurable) Scope Revision: Addition of EN Standards 14511 and 14825 Testing Revision: Allow participants in the laboratory during in-house testing. Testing Timeline: Set specific milestones for testing. coordination. 2nd Sample Requirement: Similar published performance (+/- 10% capacity and 0 to 5% improved full-load efficiency and IPLV) Test Stand Directory: Public list of all approved test stands with and a six year maximum Test Stand capacity check. New Product Introduction Directory: Defined fields

Removal of Unit Listing Types (Packaged and Configurable) Why: Removed complexity in scope determination. What: Deleted Section 1.2.5 and updated Note a of Table 1 to read Effective July 1, 2018: Updates to requirements for Primary Catalog / Selection Rating Application Output Reports, including scope determination based on Table 1, Note a. One Participant has re-rated the same BMG for two consecutive years.

Scope Revision: Addition of EN Standards 14511 and 14825 Why: Allow AHRI Certification to EN Standards What: Included optional Certification to EN Standards 14511 and 14825. No additional testing: Test to one standard, certify to all. All units certified to EN Standards shall also be certified to AHRI Standards. EN Certification Statement (Section 3.7.6.4) required for all units certified to EN Standards. AHRI Directory Field added showing certification to EN Standards. 2nd Sample tests use the same standard as the 1st Sample. One Participant has re-rated the same BMG for two consecutive years.

Testing Revision: Allow participants in the laboratory during in-house testing. Why: Harmonize requirements for in-house and witness testing What: Participants may operate their unit in the 3rd party lab. Prior to testing Participants are required to provide sufficient information to operate the selected unit at each test condition. One Participant has re-rated the same BMG for two consecutive years.

Testing Timeline: Specific milestones for testing coordination Why: Allow all testing to be completed each year. What: Set Specific milestones for each test (Section 3.6). 90 days or before Scheduled Test Date AHRI sends Participant notification for Scheduled Test Date and BMG list 45 days or before Scheduled Test Date Participant sends AHRI Production Availability 30 days or before Scheduled Test Date AHRI sends Participant selection letter 7 days after selection letter Participant sends AHRI a completed DS-2 Form and matching performance output sheet Before Scheduled Test Date Participant begins testing of unit at testing location One Participant has re-rated the same BMG for two consecutive years.

2nd Sample Requirement Why: Align 2nd Sample Requirements with other AHRI Programs What: 2nd Sample is required to be Similar published performance (+/- 10% capacity and 0 to 5% improved full-load efficiency and IPLV.IP/IPLV.SI or NPLV.IP/NPLV.SI) Within the same BMG as the 1st Sample. One Participant has re-rated the same BMG for two consecutive years.

Test Stand Directory Why: Removed complexity in scope determination. What: Public list of all approved test stands. Maximum Test Stand capacity is checked every 6 years. One Participant has re-rated the same BMG for two consecutive years.

New Product Introduction Directory: Defined fields One Participant has re-rated the same BMG for two consecutive years.