Justin Pennycoff AE Senior Thesis 2008 Construction Management

Slides:



Advertisements
Similar presentations
Residence Inn by Marriott Stamford, Connecticut David Walenga -Structural Option AE Senior Thesis – April 14, 2004.
Advertisements

Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
OVERLOOK TOWERS AT DULLES CORNER HERNDON, VIRGINIA Anthony Perrotta AE Senior Thesis – Structural Option.
Jonathan E. Aberts Spring 2009
Frank Burke Structural Option Sallie Mae HQ Reston, VA.
3711 Market Street 3711 Market Street Philadelphia, PA Zachary Yarnall l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Professor.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
The Warrenton Aquatics and Recreation Facility Warrenton, Virginia Derek DiPiazza Construction Management.
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
601 New Jersey Avenue Alternative Materials Amber House Structural 601 New Jersey Avenue Washington, D.C. Alternative Construction Materials Amber L. House.
George Read Hall The University of Delaware
UNC Imaging Research Building UNC Imaging Research Building Chapel Hill, NC Daniel R. Hesington, LEED AP l Structural Option AE Senior Thesis l Spring.
Hershey Research Park Building One Jonathan Krepps Structural Option Senior Thesis 2013 Faculty Advisor: Dr. Hanagan.
Kenneth G. Langone Athletic and Recreation Center Kyle Oberdorf Structural Option Thesis April 2007.
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
Introduction Connected to existing Benton Hall via skywalk Size: 103,154 SF above grade on 4 levels 82,661 SF below grade parking on 3 levels Cost: $23,651,159.
The Office Building Washington, D.C. Penn State Architectural Engineering Senior Capstone Project Brett Miller | Construction Option Advisor: Dr. Ed Gannon.
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
Kennedy Krieger Institute Outpatient Medical Center Baltimore, Marylan d Katie Sennett Construction Management Dr. Messner Spring 2008.
Council Rock High School South Seth Glinski Construction Management Spring 2003 Thesis.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
Caitlin Ferrell Structural Option Senior Thesis Presentation Spring 2006 The Erie Convention Center and Sheraton Hotel Erie, Pennsylvania Architectural.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
New Middle School Geneva, Il Greg Kemerer AE Senior Thesis 2006 – CM Option.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
APPELL LIFE SCIENCES York College of Pennsylvania Joshua Martz | Dr. Srebric | April 11, 2011 Image Courtesy of RLPS, Ltd.
Andrew Diehl The Pennsylvania State University Architectural Engineering Department Structural Option 5 th Year Senior Thesis Project “The Comparison of.
Brad Oliver – Structural Option Advisor – Professor Memari.
Oklahoma University Children’s Medical Office Building Oklahoma City, Oklahoma AE Senior Thesis Final Report April 14, 2014 Jonathan Ebersole Structural.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
Justin Purcell Structural Option Advisor: Dr. Hanagan.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
The Mary J. Drexel Home Assisted Living Addition Bala Cynwyd, PA Penn State AE Senior Capstone Project Gjon Tomaj – Construction Management Option Advisor:
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
James C. Renick School of Education PSU AE Senior Thesis 2006 Mick Leso - Structural North Carolina A&T State University - Greensboro.
Brandon mckee ae senior thesis 2007 construction management penn state university ambridge area high school Ambridge Area High School ambridge, pennsylvania.
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Arlington Gateway Hotel 801 North Glebe Road Arlington, Virginia Michael Gray Penn State University AE Senior Thesis Presentation 2005.
ANTONIO DESANTIS VERNE STRUCTURAL OPTION ADVISOR: PROF. PARFITT APRIL 14, 2008 BRIDGESIDE POINT II PITTSBURGH, PA “BUILDING SYSTEM OPTIMIZATION” THE DEPARTMENT.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Tom yost BAE/MAE - structural option granby tower norfolk, virginia senior thesis presentation 14 april 2008.
CBD Chemical Production Building Virginia, USA Christina DiPaolo │ Structural Option.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Mountain State Blue Cross Blue Shield Headquarters
Pearl Condominiums Philadelphia, PA
Advisor: Professor M. Kevin Parfitt
Redifer Commons Addition & Renovation Project
Introduction James W. & Frances G. McGlothlin Medical Education Center
Council Rock High School South
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Acterna Headquarters John M Sekel Germantown, Maryland
FDA CDRH Laboratory Timothy Mueller Senior Thesis, Spring 2006
JAKE POLLACK NEW YORK POLICE ACADEMY STRUCTURAL OPTION
Mississippi Riverbank Project (Final Presentation) May 14, 1999
TOWERS CRESCENT BUILDING B Mike Synnott Structural.
Wellington Condominiums Project
North Shore at Canton The Pennsylvania State University
The Calvert Hall High School College Project
RiverView Condominiums II Chicago, IL
Presentation transcript:

Justin Pennycoff AE Senior Thesis 2008 Construction Management Granby Tower Norfolk, Virginia Justin Pennycoff AE Senior Thesis 2008 Construction Management

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Presentation Outline Project Overview Structural Breadth – Structural System Analysis CM Depth – Site Evaluation Mechanical Breadth – Mechanical System Analysis Research – Workforce Development Conclusions Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Project Overview Location Norfolk, Virginia Total Cost $180 million Building Size 717,233 sq. ft. Construction Dates July 2, 2007 – November 2009 Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Project Overview Project Team Owner – Granby Tower LLC General Contractor – Turner Construction Architect – Humphrey’s and Associates Structural Engineer – Abiousness, Cross, and Bradshaw MEP Engineer – Jordan and Scala Engineers Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Project Overview Featured Systems Structural – CIP Concrete Mechanical – Four Pipe System Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Problem Aspects of multiple structural systems Multiple formwork sizes Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Goals Develop alternate structural system Allow for larger spans and higher floor to floor height Eliminate number of structural elements Reduce schedule Reduce cost Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Analysis Structural Loads Total Live load – 80 psf Total Dead Load – 66.25 psf Total Load – 146.25 psf Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Chart to determine beam spacing Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Cost Comparison Existing System - $5,100,744 New System - $6,241,850 Item Cost Metal Deck $87,728 Welded Wire Fabric $8,534 Fireproofing $68,366 Concrete Floor $991,489 Steel $5,085,733 Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Schedule Impact Lose 3 weeks in schedule Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Structural System Analysis Conclusion The cost of the steel system appears to be higher The schedule for the steel system appears to be longer Recommend existing system Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Analysis Problem Site is very congested due to its location Certain regulations that must be followed Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Analysis Solution Develop site plan for proposed steel structural system with lay down area Address other issues related to the site Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Main Site Issues Project is located in downtown area DOT weight regulations on deliveries Noise emittance levels Necessity to close streets for delivery purposes Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Problems that arise due to site issues Limited access to the site DOT regulations regulate when deliveries can be made Noise emittance levels regulate when deliveries can be made Street closure process could take a month or longer Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Site Plan – Concrete Superstructure floors 1-7 Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Site Plan – Concrete Superstructure floors 7-34 Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Site Plan – Steel Superstructure Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Site Plan – Alternate Steel Structure Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Site Evaluation Conclusion Regulations have an effect on how effective a site plan can be Recommend using concrete crane location and picking steel off of truck and place directly from truck A site plan can effect the schedule of the project Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Mechanical System Analysis Two Pipe vs. Four Pipe Why choose four pipe? Why choose two pipe? Recommendation Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Mechanical System Analysis Four Pipe Hot and cold all year long Two Pipe Cost less Less construction time Less construction space Recommend two pipe system Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Research – Workforce Development Problem People are either leaving the construction workforce or not entering it at all Solution Address the issues why this is occurring and develop a solution as to how to improve the industry Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Research – Workforce Development Issues Hard work and long hours Safety Attitude of people you work with Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Research – Workforce Development Suggested Improvements Integrate safety programs Team building exercises Improve emotional intelligence Show appreciation Exercise Company activities Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Conclusion Structural Analysis Higher cost, longer schedule Site Analysis Site use can have an impact on schedule Mechanical Analysis Lower cost, shorter schedule, less on site congestion Research There are thing that can be done to improve people’s perception of the construction industry and the people in it Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Acknowledgements Dave Wysong – Turner Construction Dr. Riley – PSU AE Professor Holland – PSU AE Professor Parfitt – PSU AE Craig Dubler – PSU AE Grad. Student Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Questions? Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A

Granby Tower Norfolk, Virginia Justin Pennycoff Construction Management Spring 2008 Project Overview Structural System Analysis Site Evaluation Mechanical System Analysis Research Conclusions/Q & A