Project design and implementation

Slides:



Advertisements
Similar presentations
Sustainable Rangelands Roundtable Development and Evolution of the Criteria and Indicators.
Advertisements

LOWER SALMON RIVER Tributary Protection and Enhancement.
West Virginia Conservation Agency. Section 319 Non Point Source Program WVCA is the primary entity responsible for the implementation of the: Agriculture.
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Agua Hedionda Watershed Management Plan Copyright © 2005 Kenneth & Gabrielle Adelman. All rights reserved.
Cost-Share Funding Opportunities – How the Lower Souris Watershed Committee Can Help You? Karmen Kyle Group Plan Advisor, Lower Souris Watershed Committee.
Bill Orme, Senior Environmental Scientist, State Water Board Liz Haven, Asst. Deputy Director, Surface Water Regulatory Branch, State Water Board Dyan.
What is an In Lieu Fee Program ? Clean Water Act - Section 404 : “no overall net loss” of wetland acreage and functions. One mechanism for providing Compensatory.
Wetland Assessment Methods FHWA Needs. Laws and Regulations National Environmental Policy Act Section 404 CWA Regulatory Program Executive Order 11990,
Ramsar Convention on Wetlands ( Ramsar Convention on Wetlands ( Convention on Wetlands “The conservation and wise use of.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Bay Area IRWMP Public Workshop #1 July 23, OBJECTIVES I BAIRWMP-Goals and Objectives II. DWR Guidance- “Measures” III Process IV. Proposed.
Harnessing the Power of Environmental Data for Decision-Making IABIN Phase II.
Ballona Wetlands Restoration Sean Bergquist - Restoration Program Manager photo provided courtesy Jonathan Coffin.
Jan 2005 Kissimmee Basin Projects Jan Kissimmee Basin Projects Kissimmee River Restoration Project (KRR) Kissimmee Chain of Lakes Long Term Management.
The Targeting Outcomes of Programs (TOP) framework.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Schools Property Planning Competition 2013 “Waitara”
Marin Coastal Watersheds Permit Coordination Program Marin Resource Conservation District U.S.D.A. Natural Resources Conservation Service Sustainable Conservation.
U.S. Army Corps of Engineers Decision Authority l All permit decisions, scope of analysis, 404(b)(1), mitigation, alternatives, jurisdiction -- Corps.
City of Bellingham Habitat Restoration Master Plan TAG Meeting December 5, 2012 ESA | VEDA Environmental | Northwest Ecological Services.
Solano Habitat Conservation Plan 580,000 Acres 36 Covered Species; 4 Natural Communities 17,500 acres of Urban Development; 1,280 acres of other New Facilities.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Urban Water Research Todd Rasmussen Associate Professor of Hydrology The University of Georgia, Athens and Pending Director, Urban Water Research Institute.
Phase II National Storm Water Regulations What’s in it for you?
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
Michigan’s Nonpoint Source Program Pass Through Grant Funding Past, Present, and Future Outlook Bob Sweet Past Aquatic Biologist, Present Administrative.
Implementation of critical studies necessary to promote better planning and efficient management of hydropower projects in an Int’l River Basin context.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Natural Channel Design Based Restoration & Enhancement Final BMP for Urban and Suburban Streams.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
STRATEGIES FOR FRESHWATER. CONTEXT FOR STRATEGIES.
Rebuilding the System Reducing the Risk California Water Plan Plenary Session October 22-23, 2007.
Pennsylvania’s newest tool… Stormwater Management Authorities.
picture Renee Purdy, Environmental Program Manager Los Angeles Regional Water Quality Control Board Renee Purdy, Environmental Program Manager Los Angeles.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
MRERP Missouri River Ecosystem Restoration Plan and Environmental Impact Statement One River ▪ One Vision A Component of the Missouri River Recovery Program.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Pollution Control: For Field Office Construction Sites.
Origin  On October 18, 1997 – 25 th Anniversary of Clean Water Act – Federal agencies were asked to rededicate their efforts to cleaning up the Nations.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
GIS M ETHODOLOGY Swearing Creek Watershed Restoration Plan 8/26/2015 Piedmont Triad Regional Council.
Overview of Everything You Need to Know About Mitigation.
Watershed Inventory: Data Collection with a Purpose Jane Frankenberger.
Overview of USDA - PL-566 Small Watershed Program - EWP Program Mahoning County FRM Informational Meeting August 16, 2016 Natural Resources Conservation.
Options and Starting Points for Developing for Multi-Species ESA Conservation Programs Specifically for Threats Resulting in Habitat Loss Sean Kyle WAFWA.
Restoration and Regulation Discussion
Where critical areas & agriculture meet
Restoration and Regulation Discussion
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
Integrating Wetlands and Watershed Management: Lessons from the U.S.
PENNSYLVANIA STORMWATER BEST MANAGEMENT PRACTICES MANUAL
NATIONAL REDD+ SECRETARIAT
The Urban Forest Management Plan
WIP Regional Meetings Jason Keppler
Planning and BMPs for Large LUPs
Henrico County Stream Assessment / Watershed Management Program
The watershed management process
Strategies Achieving our Goals
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
Good riparian management Financial benefits for the public
ERIE Summer Workshop Series: Watershed restoration
City of Maple Ridge Green Infrastructure Discussion Opportunities and Challenges Dec. 15, 2016 Thanks, rod…
Monitoring, evaluation, adaptive management
Common Stream Habitat Problems
When and how to best consider the provision of the Habitats directive
The City of Los Angeles and The Los Angeles River
Restoration and Regulation Discussion
Presentation transcript:

Project design and implementation

Watershed management Phase 1 getting organized Phase 2 problem & opportunity identification Phase 3 developing goals, objectives, & restoration alternatives** Phase 4 implementing**, monitoring, evaluating, & adapting FISRWG, 1998

Restoration alternative selection & design Phase 3 developing goals, objectives, & restoration alternatives Define the desired future condition for everyone on the team Identify scale considerations Identify restoration constraints and issues Define goals and objectives Restoration alternative selection & design Point of this step is to develop & analyze alternatives and come to a consensus on a game plan Define the desired future condition for EVERYONE on the team Identify scale considerations Landscape scale regional economic & natural resource management considerations; land use considerations; biodiversity considerations Stream corridor scale may take into consideration both the stream and upland areas; guidelines focus on ecological function & structure, but riparian buffers, for example, are as important for bank erosion as they are as habitat Reach scale plans must take into consideration the larger scales and consider up- and downstream impacts, for example 3. Identify restoration constraints and issues a. Consider technical constraints (e.g., lack of data, restoration technologies); QA/QC; nontechnical constraints (e.g., political, legal, economic, social, cultural) 4. Define goals and objectives a. Goals establish a desired future condition that reflects social, political, and economic values b. Objectives give direction to the general approach, design, and implementation of the restoration effort 5. Alternative selection & design a. managing causes & treating symptoms 6. Landscape/Watershed vs. Corridor/Reach a. connectivity and scale issues 7. Supporting analyses for selecting restoration alternatives a. cost-effectiveness and incremental cost analysis must consider: funds available, return on funds invested, time & other non-financial resources, ability to get action done b. evaluation of benefits c. risk assessment d. environmental impact analysis FISRWG, 1998

Restoration alternative selection & design Managing causes and treating symptoms Using all the previous information, what can be done?

Restoration alternative selection & design Managing causes and treating symptoms These questions must be addressed: What have been the implications of past disturbances and/or management activities in the stream corridor? What are the realistic opportunities for eliminating, modifying, mitigating, or managing these activities? What would be the response of impaired conditions in the corridor if these activities could be eliminated, modified, mitigated, or managed? Critical to determining whether a passive, nonstructural alternative is appropriate or whether a more active restoration alternative is needed FISRWG, 1998

Restoration alternative selection & design Managing causes and treating symptoms Three scenarios: The cause can be eliminated The cause cannot be eliminated, but it can be managed, modified, mitigated What are those options? How will the options impact the system? It’s not possible to manage the cause, so how can symptoms be managed mitigated? 1. If the causes of the impairment can realistically be eliminated, then complete ecosystem restoration to a natural or unaltered condition might be feasible and the objectives will be clear. 2. If the causes of the impairment cannot realistically be eliminated, then you must identify to available options to manage either the causes or symptoms of altered conditions AND the effect, if any, of those management options might have on the subject conditions 3. If it’s not possible to manage the causes of the impaired conditions, then mitigating the impacts of the disturbances (i.e., the symptoms) is an alternative method of implementing sustainable stream corridor restoration FISRWG, 1998

Restoration alternative selection & design Managing causes and treating symptoms Consider this at the watershed scale—connectivity Reach to stream scale Stream to corridor scale Corridor to watershed scale Watershed to region scale

Restoration alternative selection & design Supporting analyses for selecting restoration alternatives Cost-effectiveness analysis must consider: Funds available, return on funds invested, time & other non-financial resources, ability to get action done Risk assessment addresses uncertainty What are the sources of uncertainty in stream restoration? Environmental impact analysis Considers potential sort- and long-term direct, indirect, and cumulative impacts return on funds invested back to ethics and values—this is hard to measure/quantify! FISRWG, 1998

Restoration alternative selection & design Project design—how do you do it? In-stream approaches analogy method; hydraulic geometry; analytical method; empirical relationships for meander wavelengths, width., etc.; model bank stability using BSTEM (Bank-Stability and Toe-Erosion Model); Stability Threshold Analysis (STA) Stream corridor or watershed approaches land use/zoning impacts on development; wetland preservation/construction; BMPs in agricultural land use areas (conservation buffers, fencing, crop nutrient management, conservation tillage; grazing management); stormwater BMPs (detention basins, pervious concrete, green infrastructure)

Restoration alternative selection & design Project design Green infrastructure—Buffalo Niagara RIVERKEEPER addresses sewer overflow with Green Infrastructure Solutions Plan Green Infrastructure Sewer Solutions Plan prepared by Buffalo Niagara RIVERKEEPER outlines how this solution would eliminate stormwater flow into the combined sewer system, thereby effectively preventing contaminated urban stormwater runoff from flowing directly into Scajaquada Creek while also reducing Buffalo Sewer Authority project costs. Moreover, by including green infrastructure measures, the project would also provide the benefit of adding desirable complete street components that include bike and pedestrian enhancements, neighborhood beautification and traffic calming benefits. http://bnriverkeeper.org/programs/sewers/

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration measures Monitoring Evaluation Adaptive management FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration measures Securing funding—managing $$ from multiple sources Identifying tools to facilitate implementation Getting technical assistance, using tax advantages, cost-shares to individuals Dividing implementation responsibilities—divide and conquer Managing technical teams, government agencies, contractors, volunteers Establish The Advisory Board usually manages this 1. Securing funding 2. Identifying tools to facilitate implementation a. e.g., technical assistance, tax advantages, cost-sharing, cross-compliance among existing programs 3. Dividing implementation responsibilities—divide and conquer! Responsibilities divided among participants, so the players (people and/or institutions/groups) must be identified and responsibilities must be assigned; this is usually done by the advisory board 4. Installing restoration measures Determining the schedule—timing can be crucial Obtaining necessary permits—state and federal permits needed depending on type and location (e.g., in-channel, riparian zone, upland areas)of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-sire owner and neighbors that may be impacted Securing site access—various types of easements Locating existing utilities Confirming sources & ensuring material standards—e.g., fill, rock, vegetation Successful implementation characteristics central responsibility in one person (PM), thorough understanding of planning & materials, familiarity with the reach, knowledge of laws & regulations, understanding of environmental control plans, communication among all parties involved in the action 5. Monitoring 6. Evaluation 7. Adaptive management Player (person and/or group) responsibility assigned FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration Determining the schedule Obtaining necessary permits State and/or federal permits may be needed depending on type and location (e.g., in-channel, riparian zone, upland areas) of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) measures 1. Securing funding 2. Identifying tools to facilitate implementation a. e.g., technical assistance, tax advantages, cost-sharing, cross-compliance among existing programs 3. Dividing implementation responsibilities—divide and conquer! Responsibilities divided among participants, so the players (people and/or institutions/groups) must be identified and responsibilities must be assigned; this is usually done by the advisory board 4. Installing restoration measures Determining the schedule—timing can be crucial Obtaining necessary permits—state and federal permits needed depending on type and location (e.g., in-channel, riparian zone, upland areas)of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-site owner and neighbors that may be impacted Securing site access—various types of easements Locating existing utilities Confirming sources & ensuring material standards—e.g., fill, rock, vegetation Successful implementation characteristics central responsibility in one person (PM), thorough understanding of planning & materials, familiarity with the reach, knowledge of laws & regulations, understanding of environmental control plans, communication among all parties involved in the action 5. Monitoring 6. Evaluation 7. Adaptive management Montana example FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration measures Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-site owner and neighbors that may be impacted 1. Securing funding 2. Identifying tools to facilitate implementation a. e.g., technical assistance, tax advantages, cost-sharing, cross-compliance among existing programs 3. Dividing implementation responsibilities—divide and conquer! Responsibilities divided among participants, so the players (people and/or institutions/groups) must be identified and responsibilities must be assigned; this is usually done by the advisory board 4. Installing restoration measures Determining the schedule—timing can be crucial Obtaining necessary permits—state and federal permits needed depending on type and location (e.g., in-channel, riparian zone, upland areas)of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-site owner and neighbors that may be impacted Securing site access—various types of easements Locating existing utilities Confirming sources & ensuring material standards—e.g., fill, rock, vegetation Successful implementation characteristics central responsibility in one person (PM), thorough understanding of planning & materials, familiarity with the reach, knowledge of laws & regulations, understanding of environmental control plans, communication among all parties involved in the action 5. Monitoring 6. Evaluation 7. Adaptive management FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration measures Securing site access—various easements are available 1. Securing funding 2. Identifying tools to facilitate implementation a. e.g., technical assistance, tax advantages, cost-sharing, cross-compliance among existing programs 3. Dividing implementation responsibilities—divide and conquer! Responsibilities divided among participants, so the players (people and/or institutions/groups) must be identified and responsibilities must be assigned; this is usually done by the advisory board 4. Installing restoration measures Determining the schedule—timing can be crucial Obtaining necessary permits—state and federal permits needed depending on type and location (e.g., in-channel, riparian zone, upland areas)of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-site owner and neighbors that may be impacted Securing site access—various types of easements Locating existing utilities Confirming sources & ensuring material standards—e.g., fill, rock, vegetation Successful implementation characteristics central responsibility in one person (PM), thorough understanding of planning & materials, familiarity with the reach, knowledge of laws & regulations, understanding of environmental control plans, communication among all parties involved in the action 5. Monitoring 6. Evaluation 7. Adaptive management FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting Installing restoration measures Locating existing utilities Confirming sources & ensuring material standards 1. Securing funding 2. Identifying tools to facilitate implementation a. e.g., technical assistance, tax advantages, cost-sharing, cross-compliance among existing programs 3. Dividing implementation responsibilities—divide and conquer! Responsibilities divided among participants, so the players (people and/or institutions/groups) must be identified and responsibilities must be assigned; this is usually done by the advisory board 4. Installing restoration measures Determining the schedule—timing can be crucial Obtaining necessary permits—state and federal permits needed depending on type and location (e.g., in-channel, riparian zone, upland areas)of work e.g., section 404 of the clean water act (USACE permits needed), endangered species act (USFWS permits needed) Holding preinstallation conferences—on-site meeting with project manger/supervisor, crew foreman, contractors Involving property owners—on-site owner and neighbors that may be impacted Securing site access—various types of easements Locating existing utilities Confirming sources & ensuring material standards—e.g., fill, rock, vegetation Successful implementation characteristics central responsibility in one person (PM), thorough understanding of planning & materials, familiarity with the reach, knowledge of laws & regulations, understanding of environmental control plans, communication among all parties involved in the action 5. Monitoring 6. Evaluation 7. Adaptive management FISRWG, 1998

Implementing: installing restoration measures Phase 4 implementing, monitoring, evaluating, & adapting A group effort coordinated by one person, a project manager with these skills: Leadership Scheduling Budgeting Technical skills Communicating Negotiating Customer relations Understanding environmental control plans minimizing environmental degradation FISRWG, 1998