RAISING PERFORMANCE. TOGETHERTM

Slides:



Advertisements
Similar presentations
NFPA 70E Update for ASTM F18 ASTM F18 Representatives for the NFPA 70E TC Allen Bingham, Primary Member Tom Rege, Alternate Member Tom Neal, 2nd Alternate/Proxie.
Advertisements

SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
SC 18 – SC 11 Report – Field Operating Equipment Chair: Darrell Copsey, John Crane Vice Chair: TBD Secretary: Norman W. Hein, Jr., CONSOL Energy – CNX.
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
API 6AV1 and API 6A Comparison
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Product Lifecycle Management
Tim Haeberle API SC Winter Meeting
Task: Terminate To see this in PennWorks...click herehere Task Definition: Terminate an employee record. Steps – From the Task drop-down list: Select Terminate.
API SC18 Liaison report Mike Briggs SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHER TM.
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Cover graphic should fill and not exceed the defined grey box. API SC 18 – Quality Product Life Cycle TG7.
January 23, 2014 Kim Wiita. Activities Completed Task Group has met 3 times since the Summer 2013 meeting: August 26, 2013 October 8, 2013 November 11,
API Monogram Program Monogram Program Staff – SC Liaison Report
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
SC18 TG5 Development of a Guidance Document for the implementation of API Specification Q2 Objective Create a guidance document for users of the API Specification.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC-18 Liaison Report TG-3: Definition of.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
SC 19 report to SC 18 June 2015 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas-Lift, Barrier Valves, Completion.
San Francisco, CA. SC8 Liaison Report
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience Product Lifecycle Management.
API Subcommittee 6 Winter meeting 2015 – TG1 Pipeline and Valves Standards Report Rick Faircloth January 4 th, 2014.
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
The Teaching Cycle The Gradual Release of Responsibility Model.
API Spec 6A: ASME Section V And Section IX Reference Editions Tim Haeberle API SC Summer Meeting.
Subcommittee 20 Supply Chain Management Report for Subcommittee 18 June 2015.
API SPEC Q2 FOR AUDITING API MONOGRAM PROGRAM BOARD UPDATE TO SC16 Stacey W. Hagen ExxonMobil Development Company API Monogram Program Board Liaison to.
Supply Chain Management Report for SC 18 January 2013.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
API 19 CI Chemical Injection Devices for Downhole Applications
TG Chair: Darren Bane (BHI)
SAB Sponsor Progress Report
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
DRAFT JOINT VISION FOR ALIGNED REVISIONS OF ISO AND ISO 9001
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
API 14L Specification for Lock Mandrels and Landing Nipples
Task Group API 19SS Sand Screens
TG Chair: Darrin Willauer Baker Hughes
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
Specification on float equipment
To see this in PennWorks...click here
IEC Maintenance Committee Report
API SC-16 task group for Specification 16D
TGac Ad-hoc lifecycle model
WG Technical Editor’s Report
API Summer Standardization Conference
Korea FPD Metrology Committee
Proposed Review Cycle to
API Standard 53 Update June 2017
API Publication Types From “API Document Format and Style Manual” and “Procedures for Standards Development” the following are “standards” 1. Bulletin.
API 10 F.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
SC 18 Liaison Report Winter 2012
Float Equipment API Spec 10F
Emulsion Task Force (ETF) Meeting
CSOEM Materials Advisory Resource Group
Steering Committee (SC) Mtg.
API 16RCD January 2019 Specification for Rotating Control Devices
Presentation transcript:

RAISING PERFORMANCE. TOGETHERTM API SC18 Liaison report SURFACE SYSTEMS RAISING PERFORMANCE. TOGETHERTM

Task Group Activities TG2 Revision of API Q1 9th Edition of Q1 has been released Effective date June 1, 2014 Mandates definition of critical components, products and services (should be considered in next revision of 6A) TG3 Task Group on Improvements to the Monogram Program TG has addressed the following specifications 2B, 2C, 4F, 5 Series Specifications, Spec 6A, 6D, 600 Series, Spec 7 Series: 7-1, 7-2, 7F, 7K, 7NRV, API 11Series Specifications, API 12B, 12D, 12F, 12K, 12P Series Specifications, 14A, 14L Series Specifications, 16A, 16C, 16D, 16F, 16R, 16RCD Series

Task Group Activities (cont’d) TG5 Specification Q2 Q2 has been issued and therefor the taskgroup charge has been completed and the TG will be disbanded A new TG has been formed to develop a Users guide for Q2. This task group is currently being currently being chaired by Stacey Hagen due to resignation of previous chair Kim Witta with BP is chairing this TG. TG6 Welding requirements in API product specifications Task group has completed assessment of current requirements and the results have been submitted to the SC for approval. Once the results have been reviewed by SC18 they will be circulated to the product SC for information. TG7 Product Life Cycle document Work continues on this document but the TG does not currently have an estimate of when the document will be ready for ballot

Task Group Activities (cont’d) TG8 User guide for API 6A Kim Witta with BP is chairing this TG.