Weekly meeting Cascina 9 Jan 2007

Slides:



Advertisements
Similar presentations
MSC recent activities virgoweek Cascina 4 Dec 2006.
Advertisements

Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Locking improvements after the end of VSR1 Gabriele Vajente for the Locking Group 14 th ILIAS WG1 meeting Cascina – March 6 th 2008.
Payload design methods versus modeling E. Majorana.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
EM-MSC MSC Columbus’ eggs VW EM-MSC outline EQG  SFR Note Actuation Noise: still under study, a framework of actions is being.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
Takanori Sekiguchi External Review Alignment control servo for type-B/type-Bp (OpLev/WFS) 1 T. Sekiguchi.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
EM-MSC MSC staus & plans Commissioning meeting
GWDAW11, Postdam 18th-21th December 2006 E. Cuoco, on behalf of Virgo collaboration 1 “Data quality studies for burst analysis of Virgo data acquired during.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
ILIAS Geneva 29 March 2007 Virgo suspension control progress E. Majorana INFN Mirror Suspension Control workgroup.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
LIGO-G D 1 Status of Detector Commissioning LSC Meeting, March 2001 Nergis Mavalvala California Institute of Technology.
MSC latest weeks activities V. Dattilo, A. Gennai, D. Huet, E. Majorana, F. Paoletti, D. Passuello, P. Ruggi.
Mirror Suspension Control commissioning learning
1 Commissioning meeting, Cascina, LA electronics noise budget ● Sources of electronic noise ● C7 electronic noise ● Electronic noise for optimized.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Gabriele Vajente ILIAS WG1 meeting - Frascati Noise Analysis Tools at Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
MSC recent activities COMM Cascina 5 Feb EM-MSC Commissioning-oriented running activity Operation and interface updates Hardware checkup.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
1 ILIAS WG1 meeting, Hannover The 2 nd modulation frequency project.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
Yoichi Aso Columbia University, New York, NY, USA University of Tokyo, Tokyo, Japan July 14th th Edoardo Amaldi Conference on Gravitational Waves.
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
20/09/2006 EM MSC September /09/2006 EM MSC “activities” (from the web page, by Giovanni) are: - Inertial damping - Local control - Tide control.
ALIGO QUAD "Level 2" Damping Loop Design (Supplemental to LLO aLOG 6949)LLO aLOG 6949 J. Kissel G v21.
Type-A SAS Local Control Simulation (Current Status)
VIRGO–KAGRA Meeting about bottom filter damping
Present Superattenuator performance vs. ET Requirements S
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Control of the KAGRA Cryogenic Vibration Isolation System
Superattenuator for LF and HF interferometers
MSC report September weekly meeting EM-MSC
SUSPENSION CONTROL: a joint Virgo/LSC workshop
Improving LIGO’s stability and sensitivity: commissioning examples
5/10/2019 MSC briefing Cascina 11-Dec 2006 wwwwwww.
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

Weekly meeting Cascina 9 Jan 2007 MSC recent activities Weekly meeting Cascina 9 Jan 2007

MSC activities during last month have been focused on 12/6/2018 MSC activities during last month have been focused on Test of new strategies to face the winter (seism,mseism) tests of improved vertical control Improved DSP card logic to use “hybrid” filters (seism-mseism) Development and implementation of new operation interface Development of automated suspension re-centring EM-MSC-090107 wwwwwww

Winter issues: STD scheme and blending used until Dec 2006 ACC LVDT + HP LP cross IP fcrossover = 50 mHz Compromise between: 30 mHz (wind disturbance through ACC) and 70 mHz (mseism disturbance through LVDT) Note: since 2005 we have much larger margin on number of digital filter coefficients in the DSP and speed. EM-MSC-090107

Winter issues: hybrid filters (W2S tuning with no download) mix =1 (mseism) : similar to STD @ 40 mHz + notch improvement + improvement above 50 mHz ACC LVDT + HPm LPm IP HPw LPw mix cross mix =0.5 : similar to the STD @ 50 mHz + notch improvement mix =0 (wind): featured to follow @ 50 mHz + notch improvement + improvement below 50 mHz effect of HPLP featuring EM-MSC-090107

Experience overview (from STD + to anti mseism) mix = 0.5 (close to old STD ID) to mix =1 (sea) majorana - 15:17, Thursday 04 January 2007 EM-MSC-090107

Experience overview (Dec 4th - Jan 4th) mix = 1 versus STD 50 mHz similar mseism (sea) conditions Overall reduction of mseism re-injection Overall improvement shown on zCorr (i.e. smaller longitudinal motion of the mirrors) EM-MSC-090107

Other tests: this week… Comparison between an improved anti-wind (G.Losurdo and the running one), it will be tested. Target: release a hybrid configuration for the run EM-MSC-090107

(Paolo Giovanni Ettore) Development of flexible design and operation Many parallel efforts GIPC (Paolo Giovanni Ettore) Development of flexible design and operation (Paolo Giovanni Ettore) Filter re-design (Matt) No path has been abandoned ! EM-MSC-090107

mseism VS tilt EM-MSC-090107

cavities locked independently mseism (300-600) mHz: relevant LVDTs seismic component in ID, blending must be accurate; => better lowering Acc/Pos cross-over frequency. cavities locked independently (correction signals) As expected Next slide Note: mseism produces excitation of payload pitch and yaw (qx,qz ). Notches implemented to reduce it. 30 mHz crossover N-arm 70 mHz crossover W-arm EM-MSC-090107

wind speed || LVDT_rms increase (observation); Tilt (f< 100 mHz): wind speed || LVDT_rms increase (observation); tilt causes fake acceleration (Losurdo, Passuello, Ruggi); => ID causes LVDT_rms increase through in-loop accel. signal. wind speed susp displacement X crossover f = 30 mHz; Z crossover f = 50 mHz EM-MSC-090107

mandatory: reduction of rms displacement of IP at low frequency. GIPC mandatory: reduction of rms displacement of IP at low frequency. main benefits: wind disturbance rejection, lock acquisition, duty-cycle. Once the ITF is locked, the mirror position, provided by the Global control, can be used instead of Local LVDT. GC (reconstructed z) Tested at step 4 WI,NI fx=30 mHz WE,NE,BS,PR fx= 70 mHz WI,NI Tower frames (LVDT vs ground) EM-MSC-090107 pruggi

BS,PR,NE under GIPC, fx =70 mHz all EM-MSC-090107

EM-MSC-090107

EM-MSC-090107

EM-MSC-090107

Performance weakness of some features 12/6/2018 MSC “open” issues Development of better operation interfaces to facilitate more flexible tests of strategies and new implementations Performance weakness of some features - visual interface including F7 and V damping (this week design session) x and tz local control damping (this week one shift on this topic) “soft download” facility to allow quiet and repeatable swap between DSP implementations to cope with extreme environmental situations EM-MSC-090107 wwwwwww

Performance weakness of some features 12/6/2018 MSC “open” issues Development of better operation interfaces to facilitate more flexible tests of strategies and new implementations Performance weakness of some features - visual interface including F7 and V damping (this week design session) x and tz local control damping (this week one shift on this topic) “soft download” facility to allow quiet and repeatable swap between DSP implementations to cope with extreme environmental situations EM-MSC-090107 wwwwwww

WSR6 DECISIONS TAKEN BEFORE THE RUN 12/6/2018 DECISIONS TAKEN BEFORE THE RUN Spikes related to V-damp at WE occurred the Thursday night IB V-damp was implemented on Friday morning 50 mHz-peaked seismic bump was present in the afternoon V-damp long susp not tested under all mseismic conditions Operator-level switch for V-damp was not designed yet Signals flags to decide about V-damp ON/OFF not studied yet V-damp OFF for the run EM-MSC-090107 wwwwwww

IB: V-damp Implementation of V-damp for IB suspention EM-MSC-090107 12/6/2018 Implementation of V-damp for IB suspention EM-MSC-090107 wwwwwww

IB: V-damp 12/6/2018 Just before WSR6… EM-MSC-090107 wwwwwww

WE: V-damp Problem of WE V-damp before WSR6 Under investigation 12/6/2018 WE: V-damp Problem of WE V-damp before WSR6 Under investigation EM-MSC-090107 wwwwwww

V-damp to be completed and interfaced with the operation 12/6/2018 Conclusions V-damp to be completed and interfaced with the operation Fight against wind and mseism going on (3 shifs/week rquested): measurements, modeling, tests. Software interfaces to facilitate operator and shifter actions under development Performance checkups and maintenance going on EM-MSC-090107 wwwwwww

F7 F7 damping ty implemented in 6 towers LC and AA filters can with 12/6/2018 F7 damping ty implemented in 6 towers LC and AA filters can with no compensation @ 16 mHz. handle to improve damping performance VS payload motion. other degrees of freedom ? EM-MSC-090107 wwwwwww

Vdamp vertical damping (y) implemented in 6 towers basically the same filter used for horizontal ID (@ 70 mHz). only top sensor used (F0) mseism rms reduction (NS-NS Horizon > 0 last stormy weather..). gain optimization under study short towers ? (this week) EM-MSC-090107

Vdamp vertical damping (y) implemented in 6 towers basically the same filter used for horizontal ID (@ 70 mHz). only top sensor used (F0) mseism rms budget reduction in critical weather conditions (lock during last night storm) short towers ? (next step, probably, urgent) EM-MSC-090107

GIPC Tested using all GC signals (PR,BS,NE,WE) at steps 1, 4, 12 yesterday night data under study > Mandatory issue: reduction of seismic (sea) re-injection > A shift is following EM-MSC-090107

step 11 V-damp ON/OFF: 6 suspensions EM-MSC-090107

step 11 V-damp ON/OFF one-by-one and OFF/ON All No crucial Improvement O-B-O OFF ALL OFF ALL ON No crucial Improvement during OBO Test. Clear Improvement All OFF/ON Relationship with Angular fluctuations EM-MSC-090107

step 11 V-damp ON/OFF one-by-one and OFF/ON All EM-MSC-090107

storm+GIPC step 12 Next improvements and studies A major effort necessary at LF during stormy weather! Note: preliminary version of GIPC And gain mistake Of IP reallocation @ WE. EM-MSC-090107

mseism VS tilt EM-MSC-090107

cavities locked independently mseism (300-600) mHz: relevant LVDTs seismic component in ID, blending must be accurate; => better lowering Acc/Pos cross-over frequency. cavities locked independently (correction signals) As expected Next slide Note: mseism produces excitation of payload pitch and yaw (qx,qz ). Notches implemented to reduce it. 30 mHz crossover N-arm 70 mHz crossover W-arm EM-MSC-090107

wind speed || LVDT_rms increase (observation); Tilt (f< 100 mHz): wind speed || LVDT_rms increase (observation); tilt causes fake acceleration (Losurdo, Passuello, Ruggi); => ID causes LVDT_rms increase through in-loop accel. signal. wind speed susp displacement X crossover f = 30 mHz; Z crossover f = 50 mHz EM-MSC-090107

mandatory: reduction of rms displacement of IP at low frequency. GIPC mandatory: reduction of rms displacement of IP at low frequency. main benefits: wind disturbance rejection, lock acquisition, duty-cycle. Once the ITF is locked, the mirror position, provided by the Global control, can be used instead of Local LVDT. GC (reconstructed z) Tested at step 4 WI,NI fx=30 mHz WE,NE,BS,PR fx= 70 mHz WI,NI Tower frames (LVDT vs ground) EM-MSC-090107

BS,PR,NI under GIPC, fx =70 mHz all EM-MSC-090107