Time Value of Money – Part I Economic basis to evaluate engineering projects.

Slides:



Advertisements
Similar presentations
Chapter 5 Mathematics of Finance.
Advertisements

MER439- Design of Thermal Fluid Systems Engineering Economics Lecture 2- Using Factors Professor Anderson Spring 2012.
Financial Management Series Number 3 Using Net Present Value To Evaluate The Value of Money Over Time Alan Probst Local Government Specialist Local Government.
Lecture-1 Financial Decision Making and the Law of one Price
Present Value Comparison Construction Engineering 221 Economic Analysis.
Decision-Making Steps
 The Effective Annual Rate (EAR) ◦ Indicates the total amount of interest that will be earned at the end of one year ◦ The EAR considers the effect of.
© Mcgraw-Hill Companies, 2008 Farm Management Chapter 17 Investment Analysis.
APPLICATIONS OF MONEY-TIME RELATIONSHIPS
Engineering Economics I
INTEREST AND CASH FLOW DIAGRAM
Chapter 4,5 Time Value of Money.
Chapter 6: Accounting and the Time Value of Money
Chapter 17 Investment Analysis
Chapter 2 Applying Time Value Concepts Copyright © 2012 Pearson Canada Inc. Edited by Laura Lamb, Department of Economics, TRU 1.
Learning Objectives Explain the mechanics of compounding, and bringing the value of money back to the present. Understand annuities. Determine the future.
TOPIC TWO: Chapter 3: Financial Mathematics By Diana Beal and Michelle Goyen.
TIME VALUE OF MONEY Chapter 5. The Role of Time Value in Finance Copyright © 2006 Pearson Addison-Wesley. All rights reserved. 4-2 Most financial decisions.
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Appendix 4A The Time Value of Money.
Lecture No.3.  Interest: The Cost of Money  Economic Equivalence  Interest Formulas – Single Cash Flows  Equal-Payment Series  Dealing with Gradient.
Slide to accompany Blank and Tarquin Basics of Engineering Economy, 2008 © 2008 by McGraw-Hill All Rights Reserved Basics of Engineering Economy.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
NPV and IRR - Using the BAII Plus Professional Calculator NPV and IRR - Using the BAII Plus Professional Calculator Managerial Accounting Prepared by Diane.
Present Worth I Economic basis to evaluate engineering projects.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 4 Time Value of Money.
State University of New York WARNING All rights reserved. No part of the course materials used in the instruction of this course may be reproduced in any.
Chapter 3-- Measuring Wealth: Time Value of Money u Why must future dollars be put on a common basis before adding? u Cash is a limited and controlled.
Part Two Fundamentals of Financial Markets. Chapter 3 What Do Interest Rates Mean and What is Their Role in Valuation?
1 What is Engineering Economics?. 2  Subset of General Economics  Different from general economics situations - project driven  Analysis performed.
Chapter 3 - Interest and Equivalence Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation.
Reporting and Interpreting Liabilities
Time Value of Money P.V. Viswanath. 2 Key Concepts  Be able to compute the future value of an investment made today  Be able to compute the present.
© The McGraw-Hill Companies, Inc., 2001 Irwin/McGraw-Hill Chapter 9 Reporting and Interpreting Liabilities.
Time Value of Money – Part II
EGR Interest and Interest Rate Interest, I ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth.
ENGR 112 Economic Analysis. Engineering Economic Analysis Evaluates the monetary aspects of the products, projects, and processes that engineers design.
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Making Capital Investment Decisions Chapter 6 (10)
1 Microeconomics Lecture 11 Capital market Institute of Economic Theories - University of Miskolc Mónika Orloczki Assistant lecturer Andrea Gubik Safrany,
ACCTG101 Revision MODULES 10 & 11 TIME VALUE OF MONEY & CAPITAL INVESTMENT.
Applying Time Value Concepts
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Rate of Return Analysis Lecture No.
© 2003 McGraw-Hill Ryerson Limited 9 9 Chapter The Time Value of Money-Part 1 McGraw-Hill Ryerson©2003 McGraw-Hill Ryerson Limited Based on: Terry Fegarty.
Contemporary Engineering Economics
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Equivalence Calculations with Effective.
Engineering Economic Analysis Canadian Edition
Interest and Interest Rate Interest ($) = amount owed now – original amount A)$1000 placed in bank account one year ago is now worth $1025. Interest earned.
ENGINEERING ECONOMICS Lecture # 2 Time value of money Interest Present and Future Value Cash Flow Cash Flow Diagrams.
TIME VALUE OF MONEY A dollar on hand today is worth more than a dollar to be received in the future because the dollar on hand today can be invested to.
The Time Value of Money Lecture 3 and 4 Corporate Finance Ronald F. Singer Fall, 2010.
Engineering Orientation
Opportunity Cost of Capital and Capital Budgeting Chapter Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Copyright © 2009 Pearson Prentice Hall. All rights reserved. Chapter 4 Time Value of Money.
Agribusiness Library LESSON L060013: THE TIME VALUE OF MONEY.
MER Design of Thermal Fluid Systems INTRODUCTION TO ENGINEERING ECONOMICS Professor Bruno Winter Term 2005.
Chapter 3 Interest and Equivalence Copyright Oxford University Press 2009.
1 Engineering Economics.  Money has a time value because it can earn more money over time (earning power).  Money has a time value because its purchasing.
Economic Equivalence Lecture No.3 Chapter 2 Fundamentals of Engineering Economics Copyright © 2008.
(c) 2002 Contemporary Engineering Economics 1. Engineers must work within the realm of economics and justification of engineering projectsEngineers must.
Chapter 5 Time Value of Money. Basic Definitions Present Value – earlier money on a time line Future Value – later money on a time line Interest rate.
Faculty of Applied Engineering and Urban Planning Civil Engineering Department Engineering Economy Lecture 1 Week 1 2 nd Semester 20015/2016 Chapter 3.
1. 2 Engineering Economics (2+0) Fundamentals of Engineering Economics-2 And Time value of Money Instructor: Prof. Dr. Attaullah Shah Lecture # 2 Department.
Chapter 5 The Time Value of Money— The Basics. Copyright ©2014 Pearson Education, Inc. All rights reserved.5-2 Slide Contents Learning Objectives Principles.
1 Engineering Economics Engineering Economy It deals with the concepts and techniques of analysis useful in evaluating the worth of systems,
Time Value of Money Chapter 5  Future Value  Present Value  Annuities  Rates of Return  Amortization.
Equivalence Calculations with Continuous Payments
Equivalence Calculations with Continuous Payments
Chapter 4: The Time Value of Money
Interest and Interest Rate
Presentation transcript:

Time Value of Money – Part I Economic basis to evaluate engineering projects

Time Management The expected time to deliver this module is 50 minutes. 20 minutes are reserved for team practices and exercises and 30 minutes for lecture.

Learning Objective After this class the students should be able to: Define the interest rate for calculating the time value of money. Contrast simple and compound interest. Draw a cash flow diagram.

Warm-up (Question 1) If you had the possibility to receive $ 10,00.00 now or another amount one year from now, how much would you like to receive one year from now? Each team is invited to answer this question and list the reasons that justify their respective answers.(5 minutes)

Warm-up (Question 2) The engineering group of Baker Designs must decide whether to spend $90K (K for thousands) on a new project. This project will cost $5K per year for operations, and it will increase revenues by $20K annually. Both the costs and the revenues will continue for 10 years. Should the project be done? Each team is invited to answer this question and list the reasons that justify their respective answers.(5 minutes)

Interest rate Each person has a different answer for these questions, but the interaction among people in the financial market, under the same condition, offer us only one answer, which can be determined through the interest rate.

Warm-up A dollar today, a dollar a year from now, and a dollar 10 years from now differ in value. These dollars that occur at different times must be combined to evaluate engineering projects. How is the difference in value due to the time value of money accounted for?

Key Words and Concepts Interest: The return on capital. Capital Invested money and resources Cash How diagram: The pictorial description of when dollars are received and spent. Equivalence Occurs when different cash flows at different times are equal in economic value at a given interest rate. Present worth A time 0 cash flow that is equivalent to one or more later cash flows. Nominal interest rate The rate per year without adjusting for the number of compounding periods. Effective interest rate The rate per year after adjusting for the number of compounding periods

What is Interest? Interest is a rental fee for money; that is, a fee paid or a fee earned for the use of money. Engineering economy generalizes this definition. Interest is the return on capital - Interest is the return on Capital. Capital, in turn, is invested money and resources..

Interest rate Interest rate equals the ratio of the interest amount and the capital amount. If the interest rate is 5 %, $5 of interest is paid when $ 100 is borrowed for a year or a month (a given period of time).

Interest and the time value of money Interest is used to calculate the time value of money, and it is crucial to the practice of engineering.

Interest Rates Vary Homework: complete this table Table 1

Interest rate and Risk. Drilling an oil well, developing a new computer chip, and building a new municipal transit system are relatively risky. Opening a new gas station, redesigning a production line, and building a new municipal water reservoir are less risky. Riskier projects are required to generate a higher rate of return.

Cash Flow diagram The pictorial description of when and how much money is spent or received is a cash flow diagram. Cash flow diagrams depict the timing and amount of expenses and revenues for engineering projects. Positive cash flows are receipts (those arrows point up), and negative cash flows are expenses (those arrows point down). This course follows the normal practice of engineering economy by assuming end of period cash flows for most cash flows. Figure 2

Cash flow diagrams: Depositor and Bank Figure 3

Reference Engineering Economic: Appling Theory to Practice Ted G. Eschenbach Oxford University Press 2002 Part I, chapter 1