Vladimír Smotlacha, CESNET Accurate Time Transfer over Optical Network 6 th CEF Networks Workshop Prague 13 September 2010.

Slides:



Advertisements
Similar presentations
1 Institut für Grundlagen der Elektrotechnik und Messtechnik Sven Fisahn Cost 286 Workshop onEMC Aspects of Wireless Communications in Transport Systems.
Advertisements

Radio over fiber.
Networking: Computer Connections Chapter 7 Data Communications Send and receive information over communications lines.
Computers Are Your Future © 2005 Prentice-Hall, Inc.
High Speed Digital Access
Scintillator Tile Hadronic Calorimeter Prototype (analog or semidigital) M.Danilov ITEP(Moscow) CALICE Collaboration LCWS04, Paris.
Pforzheim University of Applied Sciences Opto & Measurements Lab Prof. Dr. Mohr FiberGyroEnvSens PF Page 1 Error signal buildup in fiber gyroscopes.
Chapter 7 Transmission Media
Telecommunications System Components
Transmission Media T.Najah Al-Subaie Kingdom of Saudi Arabia
The scale of IC design Small-scale integrated, SSI: gate number usually less than 10 in a IC. Medium-scale integrated, MSI: gate number ~10-100, can operate.
Progress in the Link Calibration for UTC Time Transfer -- attainable uncertainty of the METODE (MEasurement of the TOtal DElay) Abstract The dominant part.
World with Out GPS Sep GPS – Global Position System The GPS System Sends Data via Satellites : – 1PPS Clock Based on Atomic, at 10^ -12 Accuracy.
One-way Delay Measurement Vladimir Smotlacha TF-NGN, October 2002.
Time in Distributed Systems
National Research Council Canada Conseil national de recherches Canada Activities in Frequency and Time at the National Research Council of Canada Research.
CESNET Research Department CEF Networks lighting: search for equipment Stanislav Sima November 23th, 2004.
Summary of Research on Time-to-Digital Converters Summer Exchange Program 2008 Istituto Nazionale di Fisica Nucleare Rome, Italy Creative Studies Honors.
Distance observations
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
Chapter 4 Transmission Media
Department of Electronic Engineering City University of Hong Kong EE3900 Computer Networks Transmission Media Slide 1 Overview Guided - wire Unguided -
1 Fall 2005 Extending LANs Qutaibah Malluhi CSE Department Qatar University Repeaters, Hubs, Bridges, Fiber Modems, and Switches.
William Stallings Data and Computer Communications 7 th Edition Chapter 4 Transmission Media.
Progress in sub-picosecond event timing Ivan Prochazka*, Petr Panek presented at 16 th International Workshop on Laser Ranging Poznan, Poland, October.
Chapter 8 COMMUNICATION AND COMPUTER NETWORK
Additional RF system issues: Amplifier linearization Reference Phase distribution Master Clock Anders J Johansson Lund University.
15 Sep 2006 IVS VLBI2010 Haystack0 It’s About Time !!!!!
1 Physical Clocks need for time in distributed systems physical clocks and their problems synchronizing physical clocks u coordinated universal time (UTC)
Timing calibration using WR P.Kooijman. Fibre network Had a PRR of the network Comments reasonably positive Complicated system Build a full testbench.
TRANSMISSION MEDIA’S BY KULA.
1 Business Telecommunications Data and Computer Communications Chapter 4 Transmission Media.
TELECOMMUNICATIONS Dr. Hugh Blanton ENTC 4307/ENTC 5307.
Open transmission systems in CESNET2 and CBFs Lada Altmannová CESNET Praha, September 13th, 2010.
High Precision Mid-Infrared Spectroscopy of 12 C 16 O 2 : Progress Report Speaker: Wei-Jo Ting Department of Physics National Tsing Hua University
Josef Vojtěch, Stanislav Šíma, Lada Altmannová, Miloslav Hůla, Jan Radil, Pavel Škoda Sharing of Fibers by Transmission Systems Open Photonic.
Research of long distance clock distribution system Université Libre de Bruxelles (IIHE) Yifan Yang, Kael Hanson, Aongus Ó Murchadha, Thomas Meures, Michael.
Distributing UTC(NIST) to Industrial Time and Frequency Users Michael Lombardi NIST Time and Frequency Division Distributing UTC(NIST) to Industrial Time.
1/21 Chapter 4 – Transmission Media. 2/21 Overview  guided – copper twisted pair, coaxial cable optical fiber  unguided – wireless; through air, vacuum,
National Time Service Center. CAS Time Standard and Ensemble Pulsar Time Scale Ding Chen, George & Bill, Dick, PPTA team 2011 年 5 月 9 日, Beijing.
Review of Positioning in ANTARES Dr. Lee F. Thompson Department of Physics and Astronomy University of Sheffield Special thanks to Vincent Bertin, CPPM.
Calibration of geodetic (dual frequency) GPS receivers Implications for TAI and for the IGS G. Petit.
Vladimír Smotlacha CESNET High-speed Programmable Monitoring Adapter.
Tanenbaum & Van Steen, Distributed Systems: Principles and Paradigms, 2e, (c) 2007 Prentice-Hall, Inc. All rights reserved DISTRIBUTED SYSTEMS.
Research Department CzechLight testbed Lada Altmanová Jan Radil Stanislav Šíma Josef Vojtěch GN2 APM meeting, Prague February 24th, 2005.
Roshene McCool1 Phase Transfer & WANs 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Local Oscillator distribution over fibre Roshene McCool SPDO – Signal.
Josef Vojtěch, Miroslav Karásek, Jan Radil Field and lab experiences with deployment of optical amplifiers and FBGs.
Roshene McCool SKADS Workshop 2007 DS3 – T1 Network Infrastructure and Data Transmission Roshene McCool Simon Garrington University of Manchester.
Electromagnetic Spectrum. -is the range of all possible frequencies of electromagnetic radiation. The "electromagnetic spectrum" of an object is the characteristic.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
ELT delays absolute calibration Ivan Procházka (1), Josef Blazej (1), Anja Schlicht (2) Prepared for ESA Webex meeting(s) March 2015 (1) Czech Technical.
PeterJ Slide 1 Oct 14, 2008 Transfer exact timing using a coded data communication channel.
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
Jeroen Koelemeij LaserLaB VU University PartnersFunding Putting optical-fiber frequency links to work.
I.Prochazka,et al, KOM ESOC, Darmstadt, April 2016 SPACE SITUATIONAL AWARENESS PROGRAMME P2-SST-VII EXPERT COORDINATION CENTRES (PHASE 1) Contribution.
1 Status Report on Time and Frequency Activities at NPL India A. Sen Gupta, A. Chatterjee, A. K. Suri, A. Agarwal, S. Panja, P. Arora, S. Yadav, P. Kandpal,
Status Report on Time and Frequency Activities at KRISS Taeg Yong Kwon Center for Time and Frequency, Division of Physical Metrology Korea Research Institute.
Michael Wouters, NMIA Status report: current and future activities at NMIA.
Vladimír Smotlacha, CESNET Alexander Kuna, IPE Time and Frequency Transfer in All-optical Network TNC 2011 Prague 17 May 2011.
William Stallings Data and Computer Communications
William Stallings Data and Computer Communications 7th Edition
Sub-nanosecond Time Synchronization Mechanism for Radio Interferometer Array
Long haul time distribution in existing telecommunication networks
Transmission Media.
Chapter 2 Measurement.
Fiber Optic Transmission
William Stallings Data and Computer Communications
University of Houston Datacom II Lecture 1C Review 2
Jan Radil Miroslav Karásek
William Stallings Data and Computer Communications
Presentation transcript:

Vladimír Smotlacha, CESNET Accurate Time Transfer over Optical Network 6 th CEF Networks Workshop Prague 13 September 2010

Time and frequency standards pendulum –frequency standard until 1930 s quartz crystal Cesium (Rubidium) clock –elements of IA periodical table group (single electron in level s) –hyperfine levels transition emits microwave frequency photon Hydrogen maser near future: quantum logical clock –transition (in optical frequency) of isolated ion kept in electromagnetic field trap (Al, Hg, Sr,...)

Time transfer 1 ns represents 30 cm light path in vacuum, ~20 cm in cable or fiber cable, optical link –short distance, negligible environmental influence (e.g. thermal dilatation) radio broadcast systems satellite navigation systems (GPS,...) –time broadcast – tens of nanoseconds noise –timestamping of local clock – common-view, all-in-view, similar signal propagation in geographically close localities, accuracy below 1 ns (e.g. GTR50) two-way satellite transfer (TWSTFT) –assumes equal propagation delay in both directions two-way optical link time transfer

Time transfer over fibre Goal Design device and method for accurate time transfer – alternative to satellite based methods Comparable or better accuracy and stability on range ~1000 km Use existing DWDM all-optical networks

Adapters Features Two-way transfer Optical signal modulation for 1-pps encoding Uses SFP transceivers Based of FPGA Virtex-5 Requires two time interval counters

Time transfer principle x A = Tr A – T A x B = Tr B – T B ε A = Ts A – T A ε B = Ts B – T B δ AB = (x A – ε B – Θ AB )δ BA = (x B – ε A + Θ AB ) assume δ AB = δ BA Θ AB = ((x A – x B ) + ( ε A – ε B )) / 2

Adapter prototype

Cesnet DWDM network

Experiments We made 3 experiments: Optical loop measurement Time transfer Cesnet – BEV (Prague – Vienna) Comparison with GPS time transfer Participants: IPE (Institute of Photonics and Electronics), Czech national time and frequency laboratory, Prague BEV (Bundesamt für Eich - und Vermessungswesen), Austrian national time and frequency laboratory, Vienna ACOnet, Austrian NREN, Vienna West Bohemian University, Plzen

Optical loop experiment Both endpoints in one laboratory, common clock Bidirectional optical loop length 744 km DWDM production network 4 segments, 3 fiber providers 12 optical amplifiers Various optical elements (Cisco, CzechLight) Segment Praha – Hradec Kralove on top of electricity distribution poles

Optical loop - geography Praha - Brno 284 km Brno - Olomouc 113 km Hradec Králové - Olomouc 197 km Praha - Hradec Králové 150 km km

Optical loop - results One-way delay in both directions fluctuation ~130 ns (temperature changes about 12 °C) aerial fiber on top electricity distribution poles residual asymmetry < 2 ns (resp. TDEV 8.7 ps / 500 s)

Optical loop – results II

Prague – Vienna experiment Time transfer between Cesnet and BEV Site A: Rb clock in Cesnet, Prague, GPS disciplined Site B: Rb clock, BEV (resp. Vienna university), free running 506 km, DWDM in production network, (Prague – Brno – Vienna)

Prague – Vienna results Step in one-way delay ( :13 UTC) –direction to Prague +72 ns (cca +14 m) –direction to Vienna +16 ns(cca +3 m) Free running Rb clock: relative frequency offset 8.08 *10 -12

Optical x GPS time transfer Comparison with GPS time transfer Site A: free running Rb clock in Plzen (West Bohemian University) Site B: Cs clock in IPE – UTC(TP) 150 km of fibre, WDM, production network GTR50 installed in both sites 95 km geographical distance

Optical x GPS transfer - results 10 days measurement comparison with GTR50 – exact calibration system based on GPS difference in range ± 2 ns short time TDEV (time stability) 120 ps

Optical x GPS transfer – results II Optical transfer is more stable for averaging time up to 100 s then common-view method Equal stability for longer averaging time interval (influenced by Rb clock rather then the measurement method)

Conclusions Adapters prototypes successfully tested and method verified No influence to other DWDM traffic Fiber length dilatation cancels in two-way transfer (residual asymmetry less than 1 ns at 744 km fiber in 6 day test) TDEV 8.7 ps / 500 s at 744 km fiber Better TDEV then common-view method (averaging interval up to 100 s, distance about 100 km)

Future work Build all-optical path between BEV and IPE Convert experimental method to service – timescale comparison TIC integration into FPGA structure Design adapters suitable for time distribution – no data processing at server side

Thank you