Time-Chainage diagram

Slides:



Advertisements
Similar presentations
Bar Charts and Line Graphs
Advertisements

Orthogonal Projection
Free-body Diagrams Helps to isolate and simplify a system (Like a boundary in systems theory) Is a line diagram that represents all of the forces acting.
Tutorial 3 – Creating a Multiple-Page Report
XP New Perspectives on Microsoft Office Word 2003 Tutorial 2 1 Microsoft Office Word 2003 Tutorial 2 – Editing and Formatting a Document.
Following the GLEs and LEAP Format
Environmental Remote Sensing GEOG 2021
40 Tips Leveraging the New APICS.org to the Benefit of Your Organization, Members, and Customers! 1.
Civil engineer is the person who is responsible for the planning and construction of structures such as buildings, roads, bridges, dams and ports. His.
By: Walter C. Brown and Daniel P. Dorfmueller
Gantt Chart.
TRADITION, POWER QUALITY , INNOVATION
State map series in the Czech Republic and thematic maps for construction industry Map = a shrunk image of the Earths surface. The cartographic projection.
Turing College Introduction. Turing College Project Scope Design and construction of 801 student apartments comprising; Nine 3 & 4 storey residential.
Bridging the Gap Problem-Solving Pupils Version. Note to Pupils Do you know the difference between Area and Perimeter? Do you have problems knowing how.
Multiplying Binomials
Unit 8: Presenting Data in Charts, Graphs and Tables
JQuery Mobile. Benefits Required links Remember that we need to add the links to the head, in this order.
© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
Project Scheduling: Lagging, Crashing, and Activity Networks
Let’s make engineering more easy
What is a scale drawing?
Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
Chapter 11 Creating Framed Layouts Principles of Web Design, 4 th Edition.
Perencanaan dan Pengendalian Proyek menggunakan MS-Project Tri Joko Wahyu Adi Malang, Mei 2006 Kampus Universitas Muhammadiyah Malang Materi Pelatihan.
Perencanaan dan Pengendalian Proyek menggunakan MS-Project Tri Joko Wahyu Adi * Yunan Rusdianto * Zamzami Septiropa Malang, Mei 2006 Kampus Universitas.
Mr C Johnston ICT Teacher
CE / AL Geography Map Reading Skills and Techniques.
1. Chapter 29 Creating Forms 3 Understanding Forms Word enables you to create fill-in forms to eliminate the need for storing pre-printed forms. Add.
Scheduling. Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete a project.
Planning & Scheduling Systems: From Design to Fabrication.
MODULE THREE SCALES AND DIMENSIONS
Bentley CloudWorx and PlantSpace Product Description Product Benefits Workflow Examples.
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Business Studies Grade 11.
Creating a Bar Chart On a Mac. Frequency Distribution Create a frequency distribution based on the classes Refer to creating a frequency distribution.
Instructor: Professor Cora Martinez, PhD Department of Civil and Environmental Engineering Florida International University.
Topic 7: Timber Subfloor Systems – Basic
Institut IGH d.d. 5. Construction. Institut IGH d.d. 5. Construction.

Department of Civil Engineering,
Scheduling CTC-415. Scheduling Putting the activities in chronological order –Chicken or the egg Allows the PM to determine the time required to complete.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation.
What is Web 2.0?  Online internet applications that can be utilized to change, modify or save information on the World Wide Web  A collaboration website-
PROJECT PLANNING AND SCHEDULLING
PROGRAMMING Frank Ellis B.Sc. ARSM Thursday 26th March 2015
Project Management Inspections and Reviews 1 February.
Pay attention as I present pay attention as I present slide layout and content slide layout and content pacing pacing references to book (or not) references.
Linear Scheduling Method Definition A simple diagram to show location and time at which a certain crew will be working on a given operation. Characteristics.
Extracting Information
What does a Civil Engineer do?
Ray Diagrams for Lenses
Time Planning and Control Time-Scaled Network
Drawing Longitudinal & Cross Sections
Charting Best Practices
Project Planning & Scheduling
Gantt Charts for project management
Graphing Biology Fall 2016.
Time Planning and Control Time-Scaled Network
Geologic Geometry.
GRAPHING Biology Fall 2016.
Print Reading.
Project Planning By Phaik San Liew.
Planning assignment in MS-Project
Competency: Create site plan drawings
Is Engineering for Me?.
Competency: Create site plan drawings
Presentation transcript:

Time-Chainage diagram Sewon Kim, Kevin Tran, Mary Svennerborg

Contents What is the Time-Chainage Diagram? What is the principal benefit? History Advantage of Time-Chainage chart Example Think about References

1.What is the Time-Chainage Diagram?

1.What is the Time-Chainage Diagram? It is an extension of the Bar Chart (Gantt Chart). enables the time dependencies between activities to be shown, together with their order and direction of progress along the job.

2.What is the principal benefit? The principal benefit is the management of work in confined spaces where typically only one operation can be performed at a time.

Description of Diagram

3.History Widely applied roadwork projects and in the development of the motorway system in UK for many years used for the planning of the tunnelling and fixed equipment installation on the channel tunnel project Discussed in proceedings of the Institution of Civil Engineers Applicable only for limited types of project not as widely appreciated in the industry as bar charts and network techniques.

4. Advantage of Time-Chainage chart When Constructing Roads Railways Pipelines Tunnels Transmission Lines Bridges

4. Advantage of Time-Chainage chart Easy to know The order of activities or operations Where activities are happening locationally How activities must progress in relation to direction and distance Time, key dates and holidays, etc.

5.Example Business of constructing the road The length of road = 3.5 Km Starting point of construction = 0+000 Finishing point of construction = 3+500 6 Activities on construction plan 6 Steps to draw Time-Chainage Diagram

6 Activities Fencing Drainage Bulk Earthworks Footbridge Retaining wall Road Surfacing

6 Steps

6 Steps to draw diagram Step 1 Draw the diagram layout Decide the intervals of chainage 1000m

6 Steps to draw diagram Step 2 Select either the horizontal or vertical format Draw an outline with time and distance (chainage) Add main holiday periods allowing 2 weeks

6 Steps to draw diagram Step 3 Make the main program activities or operations OPERATION EXAMPLE Set up site Offices for contractor and engineer Activity 1 Fencing Activity 2 Drainage Activity 3 Bulk Earthworks Activity 4 Foot Bridge Activity 5 Retaining Wall Activity 6 Road Surfacing Holiday Christmas Shut down

6 Steps to draw diagram Step 4 Fill in the ‘site set-up’ and ‘clear site’ activities

6 Steps to draw diagram Step 5 Decide in turn where and when each activity will take place 15 Act1 12 16 Act2 Act4 -25 -16 Act5 -16 -24 15 20 Act3 25 30 35 Act6 Project Completion

6 Steps to draw diagram Step 6 Complete all activities on the list

6.Think about Advantage of Horizontal axis -Easy to notice that has to be constructed. Advantage of Vertical axis -More easier to read by those familiar with bar charts. The choice is a matter of personal preference.

References ICE(1992) Proceeding of the Institution of Civil Engineers. The Channel Tunnel Part 1: Tunnels. Thomas Telford. http://www.noweco.com/qei/qeie08.htm Cormican,D.(1985) Construction Management: Planning and Finance. Construction Press http://pclarke.co.uk/html/time_chainage.html