API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update.

Slides:



Advertisements
Similar presentations
Subsea Standardization. Brief History SPE ATW on Subsea Standardization held Dec 2008 SPE ATW on Subsea Standardization held Dec 2008 –Form workgroup.
Advertisements

Revision of API RP 17N Subsea Production System Reliability, Technical Risk & Integrity Management Don Wells (Hess)
API 16 AR Specification for Drill-through Equipment Remanufacturing
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
4th Meeting of the Washington Group on Disability Statistics Fourth meeting of the WG: objectives and agenda Jennifer H. Madans U.S.A.
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
1 Subsea Reliability and Integrity Management Reliability and Integrity Management – Have very similar intent - almost the same definition – Treated separately.
API Subcommittee 17 Industry Standards for Subsea Equipment
CSOEM Materials Advisory Group Summer Meeting: Status Update - UNS S66286 Elevated Temperature Tensile Testing Tim Haeberle Chief Consulting Engineer –
Standards Governance Update Budget Overview SC Chair Rotation 2010 E&P Summer Standards Conference July 2, 2010 Washington, DC.
1 David Miller, PE, F.ASCE Director, Standards API ECS Reorganization Update.
Kent Grebing, API SC 16 Chair
1 API 16A 3 rd Edition Winter Conference Jan API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC6 Liaison report for SC18 Rick Faircloth.
1220 L Street, NW Washington, DC Executive Committee on Standardization of Oilfield Equipment & Materials (ECS) New Member Orientation.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting May 9, 2011.
API 17D – Use of Differential Pressure in Subsea Equipment Design
API Recommended Practice 17X Recommended Practice for Design, Installation, and Maintenance of Subsea Booster Pump Systems Status Report October 3,
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
Lab Results Interfaces S&I Framework Initiative Bi-Weekly Initiative Meeting August 29, 2011.
19th January 2012 Don Wells (Hess)
Reducing a Set Covering Matrix. S I T E S Cost Areas
Subcommittee 21 - Materials Act as a resource on materials issues affecting multiple subcommittees under the Committee on Standardization of Oilfield Equipment.
Root Cause Failure Analysis
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
Task Group Status January ,11, 2017
API SC 10, Work Group 3 Update:
API RP 17A - Discussion Points
API 16C Choke and Kill Equipment
API 16F June 2017 Specification for Marine Drilling Riser Equipment
Summary of JIP Objective:
Status Update on API 16Q / 16R / 16F
ISO TC64/SC4/WG2 June 2010 status
API 16A June 2017 Specification for Drill-through Equipment
API 17X Subsea Boosting August 27, 2015
2016 Exploration & Production Standards Conference Subcommittee 10
API 16RCD June 2017 Specification for Rotating Control Devices – Update.
Specification on float equipment
First 8 slides are what was presented in San Fransisco…
API RP 16ST June 2017 Coiled Tubing Well Control Equipment Systems
API SC-16 task group for Specification 16D
2016 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16TR2 now 16TR1 June 2017 Shear Ram Performance Test Protocol
API 16B June 2017 Specification for Coiled Tubing, Snubbing and Wireline Well Control Stack Equipment Chairman – Alex Sas-Jaworsky PE Vice-Chairman –
API Summer Standardization Conference
API 16AR Specification for Drill-through Equipment Remanufacturing
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
API RP 59 June 2017 Recommended Practice for Well Control Operations
API Standard 53 Update June 2017
API 16 AR Specification for Drill-through Equipment Remanufacturing
2016 Exploration & Production Summer Standards Conference
API 16 AR Specification for Drill-through Equipment Remanufacturing
Discussion Points API RP 17A Task Group Members
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
CCWG-Accountability ICANN56 26 June 2016
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
  API SC 17 Subcommittee on Subsea Production Systems   API RP 17U   Recommended Practice for Wet and Dry Thermal Insulation of Subsea Flowlines.
API RP 16AS January 2019 Standard for BOP Systems
API 16C Choke and Kill Equipment
API 16A January 24, 2019 Winter Conference – San Antonio
API STANDARD 64 THIRD EDITION, AUGUST 2017 ADDENDUM 1, DECEMBER 2018 ERRATA 1, MARCH 2018 Diverter Equipment Systems.
API RP 59 Well Control Operations Chair – Tom Proehl
Well Intervention Well Control 2019 API E&P Winter Conference Update
Presentation transcript:

API RP 16AS June 2017 Recommended Practice for Integration of Subsea BOP Equipment Systems for Drilling Wells – Update

GOAL: Develop a schematic of the systems in the 16AS scope to identify other specifications that already sufficiently cover sections 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

First Meeting Summary: Which API documents will be included or not included? Stay with Drilling, not CWO operations at this point Capping Stack interface must be considered Start generally with S53 scope and look at delineations Included Not Include Interface 16A, 16C, 16D, 16F, 16Q, Q1, MPD, 7K, 8C, S53, S64 16B, 16 ST, RP 59 17W, 17G 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

First Meeting Summary: Acknowledged that some things can’t be done until systems are integrated in the field Should cathodic protection for subsea be included? Should bolting be included? Should stainless in subsea application and coatings be included? What else is missing? 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

First Meeting Notes: Reviewed the S53 Scope Do we target BOP Stack first and then expand to the rest of the system? WG agreed yes, otherwise the scope will become broad and difficult to manage The workgroup agreed to start at Wellhead Connector, “build stack” conceptually, and see what the gaps are for the system Given the expertise in the room, it was decided to begin with a subsea stack 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org

Path Forward: Perform Gap Analysis for a Subsea Stack from the wellhead up This will be put into Excel Spreadsheet which identifies API document which applies and develop a gap matrix Next meeting: Wednesday, July 12, 2017 1220 L Street, NW • Washington, DC 20005-4070 • www.api.org