17th Renewable Energy Summit

Slides:



Advertisements
Similar presentations
Click to edit Master title style Climate Change and the Carbon Market October 2010 Ciska Terblanche TAPPSA 2010 Conference Durban, South Africa TAPPSA.
Advertisements

Renewable Energy Program Arab Union for Electricity
1 Presentation by Mr. D.C. Samant, Chairman Rajasthan Electricity Regulatory Commission November 5, 2009 Washington D.C. SOLAR ENERGY IN RAJASTHAN.
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
Sustainable Energy at the World Bank: Policies and Experiences Anil Cabraal Lead Energy Specialist Energy and Water Department The World Bank Norway-World.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
RENEWABLE ENERGY POLICY. Renewable energy is energy that comes from resources which are continually replenished such as sunlight, wind, rain, tides, waves.
ENHANCING THE POLICY FRAMEWORK FOR SUSTAINABLE ENERGY INVESTMENT Guidance from the OECD to developing and emerging economies Karim Dahou, Investment Division,
Scaling Up Energy Efficiency in India: Opportunities in the Electricity Sector Dr. Jayant Sathaye, Dr. Amol Phadke and Ranjit Bharvirkar Energy Analysis.
Experiences as a ER buyer and a general outlook Olle Björk Swedish Ministry of Sustainable Development Washington
Quantum Leap in Wind Role of Institutions and Regional Cooperation Chunhua Li DGM Goldwind International June 2011, Manila.
14 th Sustainable Energy Summit New Delhi : 25 th Nov., 2014 Sanjeev Gupta, Managing Director Financing Indian Solar Aspirations NEXGEN Financial Solutions.
Bank aus Verantwortung Overview of KfW’s Solar Activities Andreas Thermann Deputy Director KfW Office New Delhi Coordinator - Energy Sector New Delhi,
The World Bank Group Ashish Khanna India Energy Team Leader South Asia Sustainable Development.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Solar Markets in India 2013 Seminar Keynote Address Pranav R. Mehta Chairman Solar Energy Association of Gujarat 7 th May, 2013 Hotel Crowne Plaza, New.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Sanjay Garg General Manager PGCIL/ Ministry of Power
Driving Geothermal Deployment in Developing Countries September 2015.
Energy Conclave 2006 Presentation by Debashish Majumdar, Managing Director Indian Renewable Energy Development Agency Limited New Delhi July 27, 2006 Implementing.
We have now made biomass for renewable energy our core business The Group has been involved in the last 30 years in various business in the trading.
New Challenges for the Power Sector 18 th India Power Forum On 17 th November, 2015, Hotel Imperial, New Delhi Presentation by: Shri V. S. Ailawadi – IAS.
1 VOLUNTARY MERCURY CELL PHASE OUT PROGRAMME OF INDIA Dr.Y.R.SINGH Executive Director ALKALI MANUFACTURERS’ ASSOCIATION OF INDIA MERCURY TECHNICAL BRIEFING.
RENEWABLE ENERGY POTENTIAL IN INDIA
Where India Stands - Energy Demand (mtoe) India is the Fourth Largest Energy Consumer Source:BP Stat 2010 Low per capita energy consumption (toe)
Suzlon Energy Ltd 1 Clean Technology Opportunities in India -Chintan Shah Suzlon Energy Ltd 30 th March, 2016.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
1 Implementation of Off-Grid Policy in the state of Maharashtra By H M Kulkarni General Manager (R.E) Maharashtra Energy Development Agency Date 17 th.
Renewable Energy in India Sumant Sinha, Chairman & CEO, ReNew Power Ventures Pvt. Ltd. October 2012.
Solar And Wind Energy To Boost Power Generation. Solar and wind energy are two of the most readily available renewable sources of energy to help us fight.
Lets face it! India and the world on the offshore wind farm technology:
ASSOCIATION OF RENEWABLE ENERGY OF KAZAKHSTAN
GEF Support for Renewable Energy in SIDS and The Paris Agreement
Global Energy Problems and Counter Policies and Measures of Korea
The state of play of renewables in Australia
NS4960 Spring Term 2017 Korea: Energy Policy
About CleanMax Solar Largest rooftop solar developer in India with ~25% all India market share All India presence with 5 offices and solar plants across.
Professor H. J Annegarn, Ms L Cape
Ministry of New & Renewable Energy &
Jon Sibley Director, Energy and Waste Policy
Solar ROOFTOP- Challenges & INNOVATIONS TO ACHIEVE 40 GW
Narasimhan Santhanam EAI,
Financing of solar power projects Presentation by Abhilakh singh general Manager ireda 28th July, 2016.
4th EQ CLEANTECH FINANCE SUMMIT
Engaging the private sector
Q2/2017 Developments in European Solar Markets & Beyond
16th Renewable Energy Summit
World Bank Business on Renewable Energy
Renewable Energy Development in India
Developing a Solar Roadmap Tapping every ray of the sun
Financing of Solar power plants
Rajib Das Dy GM, Planning November 5, 2017 Transition of India’s
Renewable Integration
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Hybrid Solar Wind Energy Storage Market to grow at 9%+ CAGR from :
Challenges in Financing Renewable Energy
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Hybrid Power Solutions Market to hit $60bn by 2024: Global Market Insights.
The state of play of renewables in Australia
Energy, Finance, Partnerships: Transforming Clean Business
NS4960 Spring Term 2018 Korea: Energy Policy
RE: Make in India Policy Gaps
Harnessing Renewable Energy Solar Mission of Indian Railways
ADB’s experience with financing renewable energy projects
Nürnberg, 21 February 2008 | Othmar Schwank
14th POWERON L Pugazhenthy “GLOBAL & INDIAN SCENARIOS
NS4960 Spring Term 2018 U.S. Offshore-Wind Projects
bihar electricity regulatory commission
EXPANDING THE SOLAR MANUFACTURING SUPPLY CHAIN
OUTLINE RE Programme Objectives Integrated Resource Plan
India Energy Congress 2013 Sustainable Sources of Energy February 2013.
Scaling up of Renewable Energy for Power Generation in the Western Balkan countries
Presentation transcript:

17th Renewable Energy Summit K S Popli Chairman and Managing Director Indian Renewable Energy Development Agency Ltd. (New Delhi, India) 14th February, 2018I New Delhi

Target (2022): 175 GW Mission 175 GW by 2022 Solar 100 GW Wind 60 GW India made a commitment in Paris Climate Agreement To reduce emission intensity of the economy and For having at least 40% electric power installed capacity from clean energy sources by the year 2030. Towards this an ambitious target of 175 GW by 2022 announced in 2015: Target (2022): 175 GW Sector Potential (GW) (As on date) Installed (GW) Wind 302 32.84 Solar 750 16.07 Small Hydro 20 4.41 Biomass incl bagasse Cogen. 23 8.41 Total 1095 62.84 Solar 100 GW Wind 60 GW Bio Energy 10 GW Small Hydro 5 GW As on 31.12.2017

Mission 100 GW Solar by 2022 Projects commissioned till 31.01.2018: Capacity installed up to March 2017 : 12.28 GW Capacity installed during 2017-18 so far : 6.17 GW Total capacity as on 31.1.2018 : 18.45 GW Based on tenders floated an additional 3.5 GW Capacity expected by March 2018 Total expected Solar capacity up to 31.03.2018 : 22 GW

Plan for 2017-18 Already bid out : 11,161 MW February, 2018 : 5,000 MW Till November, 2017 3,866 MW December, 2017 5,585 MW January 2018 2,210 MW February, 2018 : 5,000 MW SECI 3,000 MW NTPC 2,000 MW March, 2018 : 6,000 MW NTPC 3,000 MW Total : 21,161 MW PPAs of 3,276 MW have already been signed. NPTC is expected to increased the capacity from 5,000 MW to 10,000 MW SECI has invited EoI to install 10 GW of floating solar power plants capacity in phased manner in next three years. 15 parties have shown interest.

Trajectory for coming years Proposed bids during the coming period: 2017-18 : 20 GW (11.16 GW already bid out) 2018-19 : 30 GW 2019-20 : 30 GW Total (Including plants commissioned till 31.3.2018): 102 GW

2018-19 Solar Plan Tender Capacity ( MW) Tender to be brought by SECI – 3,000 MW each in May, July, September, November, January, 2018 & March, 2019 18,000 Tenders under CPSU Scheme – Tenders by September, 2018 3,000 Tenders under KUSUM * Scheme – Tenders by December, 2018 Tenders by NTPC – 5,000 MW by September, 2018 and 5,000 MW by February, 2019 10,000 TOTAL 34,000 * Kisan Urja Suraksha evam Utthaan Mahaabhiyan (KUSUM)

Solar - Manufacturing Base To boost manufacturing, the government has sought EoI for 20 GW of solar-generation capacity by companies ready to set up manufacturing facilities in India. 30 companies have submitted EoI. India’s total module manufacturing capacity is estimated at 8.4 GW and Solar Cell at 3.2 GW. About 88% of all module requirement in India is met through imports. The GoI, together with state governments, is offering several incentives for manufacturing modules in India – including capital subsidy, operating cost subsidy and export incentives – under different policies

Wind Power Change in tariff regime from FIT to bidding route in 2017 Wind has the highest share amongst RE. Globally out of 921 GW of total RE capacity wind is 488 GW (53%) In India Wind Power installed capacity is 32.8 GW (around 52%) of total RE capacity of 62.84 GW. India stands 4th in terms of wind power installed capacity (China, USA and Germany) Change in tariff regime from FIT to bidding route in 2017

Tariff Discovered Rs/Unit Wind Auctions Capacity (GW) Tariff Discovered Rs/Unit Status SECI – I 1 3.46 Completed SECI – II 2.64 / 2.65 SECI – III 2 E-revers bidding expected by Feb 15 Tamil Nadu 0.5 3.42 Gujarat 2.43 Maharashtra Bid floated SECI –IV Total 7.5 In pipeline – Rajasthan, Karnataka & SECI -V Off-Shore Wind GoI is contemplating off-shore wind programme in the coming years to take advantage of huge potential for off-shore wind in India. As per the meso-scale mapping studies, there is a potential of 75 GW in Gujarat and 60 GW in Tamil Nadu. First LiDAR to monitor wind conditions at sea is installed Gujarat. NIWE to take clearances for evacuation

Target for 2018-19 and 2019-20 10 GW tenders each year. 2500 MW tenders during months of June, September, December and March.

Wind - Manufacturing Base Manufacturing capacity around 10 GW per annum 21 manufacturers with 54 models Indigenization over 80% Cost of Indian wind turbines among lowest in the world

Status of other Renewable Energy Sources Biomass Power and Cogeneration Target by 2022 : 10,000 MW Achievement : 9,266 MW (January, 2018) ~ 800 MW in next 4 years. The current availability of biomass in India is estimated at about 500 million metric tons per year. Estimated surplus biomass availability at about 120 to 150 million metric tons per annum covering agricultural and forestry residues Potential of about 18,000 MW Biomass power & 7,000 MW additional Potential - Bagasse cogeneration in the country’s 550 sugar mills. Small Hydro Power (SHP) Potential : 20,000 MW Target by 2022: 5,000 MW Achievement: 4,458 MW (as on 31.1.2018) ~ 600 MW in next 4 years Other New RE Technologies/ Focus Areas Waste to Energy Projects Solar - Wind Hybrid Projects

Renewable Energy Investment –Global vis-à-vis India Total Global investments in RE was $333.5 Billion in 2017 (up 3% from 2016 levels) Reduction in technology costs, raw material costs, improved technology, conducive policy environment, better financing structuring of projects have resulted in low capital costs over the years

175 GW RE plan by 2022 entails investment of Approx Rs. 5,60,000 Crore Funding Requirements To achieve the target of 175 GW from present ~63 GW of renewable energy, approximately Rs. 5,60,000 Cr needed over the period of next 4- 5 years (until 2022) Recently, more and more Bankers/Financial Institutions have started financing Renewable Energy Projects Green/Masala bonds has been a successful financial instrument for investors to raise funds – Bond market has increased from US$ 42 billion in 2015 to US$ 92 billion in 2016. It is expected that bond market would have touched US$ 120 billion in 2017. Recently, IREDA has successfully raised Rs. 19.5 billion through a 5 year rupee-denominated green bond at the tightest ever pricing Several Multi-Lateral / Bi lateral Agencies like World Bank, KfW, Germany, ADB, the New Development Bank (NDB) have also been extending Lines of Credit in funding Indian RE Sector With year on year reduction in technology costs, raw material costs, improved technology, conducive policy environment, better financial structuring of projects and Assuming 10-20% yearly increase in investments, it may be said that India can easily mobilize the requisite funds 175 GW RE plan by 2022 entails investment of Approx Rs. 5,60,000 Crore Debt (70%) Equity (30%) (~ Rs. 3,92,000 Crores) (~ Rs. 1,68,000 Crs)

Amendment in Electricity Act & Tariff Policy The Government is considering amendments in the Electricity Act to provide further impetus to growth of energy sector, viz: Electricity Act Separation of carriage and content business State to prepare a roadmap to segregate distribution and supply wings of the DISCOMs Stricter enforcement of RPO Making tariff policy to keep cross subsidy component within 20%. Service obligation on part of DISCOMS to ensure 24X7 power supply. Tariff Policy To disallow AT&C losses of beyond 15% from being recouped via higher tariffs. The move will force the DISCOMS & State Govts to lower AT&C losses Push DISCOMS to reduce pilferage and theft of electricity.

India’s Energy Storage Market To address the challenges of large scale integration of RE into the grid, Storage technologies would play a critical role India’s energy storage potential is expected to reach 25 GW by 2032 primarily driven by investment in RE Key growth drivers: Integration of 175 GW of renewable energy sources by 2022 Today the average storage cost is around US$ 250 / kWh which is expected to touch US$ 100 /kWh in next 3-4 years. Falling costs, improved performance Mandatory use of RE in telecom towers (as mandated by TRAI) Indian grid-scale storage market is lagging behind countries like the US, China, South Korea and Japan since it is still awaiting installation of its first megawatt scale battery energy storage project. The government plans to shift to an all-electric fleet by 2030 which will boost the storage market.

THANK YOU Indian Renewable Energy Development Agency Limited Email: cmd@ireda.in | www.ireda.in