Melbourne Hill Road Drainage Scheme

Slides:



Advertisements
Similar presentations
New Mexico Infrastructure Finance Conference, October 28, 200.
Advertisements

Port NE Group Portarlington NE Group Road Sealing.
Shenagh Gamble Sustainability Programs Coordinator Local Government Association of the Northern Territory.
Mechanicsburg Borough Town Hall Meeting October 15, 2014 STORM WATER AND STREET INFRASTRUCTURE.
Click to edit Master title style Click to edit Master subtitle style Planning CITY OF MELBOURNE.
Application and Survey Branch Land Victoria Adverse Possession and Section 99 Applications ISV Seminar 24 th May 2013 Disclaimer This publication may be.
Management and regulation of estuary management Ingrid Holliday DSE, Marine Biodiversity
LEGAL RESPONSIBILITIES RELATING TO EASEMENTS Michael Mammen – Partner, HWL Ebsworth Lawyers.
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
Management of Surface Water in Severe Weather Conditions from the Highway GORDON HUNT COUNTY DRAINAGE ENGINEER for OXFORDSHIRE COUNTY COUNCIL.
Agenda What is Atlantis? What does Atlantis do? Current Situation Solution - Ecological Cities Product Range Applications and Large Scale Projects The.
Before Katrina, you had a 1% chance every year of flooding this deep from Hurricanes Notes: The depth map tool is a relative indicator of progress, over.
Development Contributions Witzenberg Municipality 30 October 2013.
FDOT R/W Guidelines Use of License Agreements
Site Planning: Site Drainage KMUTT First semester
3 May 2013 Presented By: Joanna Oborne Councils Powers and Obligations with respect to Driveways.
Hydrologic Cycle and Watersheds. Hydrologic Cycle Components Precipitation Infiltration Percolation Runoff Evapotranspiration.
Agricultural Water Pollution: Some Policy Considerations Catherine Kling Center for Agricultural and Rural Development, Iowa State University Iowa Environmental.
IRRIGATION SECTOR IN KENYA- STATUS AND CHALLENGES “PAPER PRESENTED DURING THE “GREEN WATER CREDITS WORKSHOP” KARI HQ NAIROBI, OCTOBER 2006” E. D.
SOCIAL HOUSING. New governance and accountability arrangements for Local Aboriginal Land Councils (LALCs); Introduced the requirement for formal community.
Settlement Boundaries Where do they come from? What do they do? What is the future?
 Prepared for  City of Palm Coast, Florida  June 24, 2014 Drummond Property Acquisition in Connection With The Land Donation of 70 Laramie Drive From.
Obligations and Practices Information Session April 2013 regulations PRIVATE CERTIFICATION FOR PLANNING ASSESSMENTS.
APPLYING POLICIES TO DEVELOPMENT APPLICATIONS PLANNING SCHEME POLICIES.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Sewer Relief Project. Basement Flooding has been a major problem for city of Selkirk residents. High intensity summer rain storms can result in extensive.
1 Waipaoa River Flood Control Scheme Review. 2 Review Technical Review Sept 2009 Steering Committee Oct 2009 Operations Committee Oct Council February.
Drainage Water Management with Surface Drainage Systems USDA is an Equal Opportunity Employer & Provider.
Planning Scheme Policies Development Industry Information Session 10 November 2009.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Review of Issues Affecting Utilities and Road, Rail and Motorway Corridors Mike Sim & Hamish Elliott Resources & Networks Branch Ministry of Economic Development.
Engineering Hydrology (ECIV 4323)
Rivers and Drainage Basins - A Prelude to Flooding Drainage basin/River basin: An area of land drained by a main river and its tributaries. Drainage basin/River.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Infrastructure Update RV Travel Park expansion 13 sites exist today Plans developed by Army for 40 site expansion Expansion can be supported by existing.
The (new) Residential Zones – 1 year on Manningham – A Local Government Perspective 29 April 2015.
PAS Project 1 Performance Measurement For water and sanitation- indicators CEPT UNIVERSITY.
Construction of road with Geo-Textiles A presentation by : ER. R.K. KANSAL, Executive Engineer.
Linford School Drainage Improvements 21 March 2016 City of Laramie.
Public Hearing – FY 2017 – 2021 Recommended Capital Improvement Program Budget April 25, 2016.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MELBOURNE HILL ROAD CATCHMENT DRAINAGE IMPROVEMENTS Reference Panel Meeting, 6 February 2014.
AHWATUKEE-FOOTHILLS ADMS MANDAN STREET DESIGN CHARRETTE Valerie Swick, Project Manager Flood Control District of Maricopa County.
AIRPORT SURVEYS.
Village of Villa Park October 24, 2016 Washington Street Combined Sewer Separation Project.
Regulation of land use and building activities
Mangawhai Wastewater Strategy and Options 7 August 2017.
bSevere or extensive disease (e. g
Development Charge Public Meeting October 23, 2017
Financial Accounting II Lecture 36
A resonance hybrid structure for an amide bond is shown at top and is made up of two resonance forms. Resonance forms need not contribute equally to a.
Consolidated Plan Amendment Wednesday, May 10, 2017
Water quality and quantity indicator
CONSTRUCTION TECHNOLOGY & maintenance
Regulation Amendment AM April 3, 2018.
Indicative Council Cost Balance of Project Costs (5 Year ARI Assets)
Melbourne Hill Road Drainage Scheme
Village of Sherwood Stumpf Subdivision Paving and Drainage Improvements November 7, 2018.
1200 West Widening and Reconstruction Project
WORKING PARTY ON NATIONAL ACCOUNTS (WPNA) OCTOBER 2004
Study of Miles City Slough
Copyright © Cengage Learning. All rights reserved.
Engineering Hydrology (ECIV 4323)

Chapter 5 Budgeted financial statements
Nathan Sykes Plymouth Coastal Observatory
Engineering Hydrology (ECIV 4323)
Flooding Surrounding the Addicks Reservoir during Hurricane Harvey
Copyright © Cengage Learning. All rights reserved.
Presentation transcript:

Melbourne Hill Road Drainage Scheme Indicative 5 Year V 100 Year Drainage Cost Breakdown Scheme 1 - 19 October 2015 Total Project Cost $2,200,000 Indicative Council Cost (as per Council Policy) Upgrade existing Council underground drains Upgrade flood conveyance capacity to 1 in 100 year ARI (Major Storm) Outlet Works Wildflower drain extension $500,000 Balance of Project Costs (5 Year ARI Assets) (Minor Storm) $1,700,000 Notes: The owner contribution will be based on the cost of construction of the 5 year ARI drainage system and other relevant Council Policy provisions. Council Policy requires Council contribution in respect of upgrade of the drainage system to a 100 year ARI standard (as shown above), contribution based on the area of road reserves and other Council land, as well as contribution to the cost of boring works where necessitated by Planning Scheme requirements. The indicative owner contribution will be determined following review of the scheme boundary for the preferred scheme and application of these policy provisions.