Non-user time 2/7 of total

Slides:



Advertisements
Similar presentations
CSCU 411 Software Engineering Chapter 2 Introduction to Software Engineering Management.
Advertisements

E. Schneidmiller and M. Yurkov (SASE & MCP) C. Behrens, W. Decking, H. Delsim, T. Limberg, R. Kammering (rf & LOLA) N. Guerassimova and R. Treusch (PGM.
1 Enhancements to the Linac Coherent Light Source.
UCLA The X-ray Free-electron Laser: Exploring Matter at the angstrom- femtosecond Space and Time Scales C. Pellegrini UCLA/SLAC 2C. Pellegrini, August.
Latest Results on HXRSS at LCLS Franz-Josef Decker 4-Feb Seeding with 004, 220 and over-compression 2.Tuned beam with slotted foil cutting horns.
Scheduling of Experiments Christine Clarke, 10 th October 2012 FACET User Meeting.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
CTF3 photo injector laser status CERN 17 July 2009 CLIC meeting.
Low Emittance RF Gun Developments for PAL-XFEL
FLASH Operation at DESY From a Test Accelerator to a User Facility Michael Bieler FLASH Operation at DESY WAO2012, SLAC, Aug. 8, 2012.
Transverse Profiling of an Intense FEL X-Ray Beam Using a Probe Electron Beam Patrick Krejcik SLAC National Accelerator Laboratory.
Nick Walker (DESY) John Carwardine (ANL) GDE ILC10 Beijing March 2010 Cryomodule String Test: TTF/FLASH 9mA Experiment.
Electron Sources for ERLs – Requirements and First Ideas Andrew Burrill FLS 2012 “The workshop is intended to discuss technologies appropriate for a next.
LCLS-II Design and FEL R&D
The Next Generation Light Source Test Facility at Daresbury Jim Clarke ASTeC, STFC Daresbury Laboratory Ultra Bright Electron Sources Workshop, Daresbury,
The Microbunching Instability in the LCLS-II Linac LCLS-II Planning Meeting October 23, 2013 A. Marinelli and Z. Huang.
Lessons Learned From the First Operation of the LCLS for Users Presented by Josef Frisch For the LCLS March 14, 2010.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
The Linac Coherent Light Source (LCLS) Free Electron Laser (FEL) Performance Program William S. Colocho, WAO, October 2014 With focus on Reproducibility.
E. Schneidmiller and M. Yurkov FEL Seminar, DESY April 26, 2016 Reverse undulator tapering for polarization control at X-ray FELs.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
LCLS-II options: CuRF → SXR, VPU, HXR harmonics G. Marcus 5/13/2015.
Operation and Upgrades of the LCLS J. Frisch 1,R. Akre 1, J. Arthur 1, R. Bionta 2, C. Bostedt 1, J. Bozek 1, A. Brachmann 1, P. Bucksbaum 1, R. Coffee.
Seeding in the presence of microbunching
Multi-bunch Operation for LCLS, LCLS_II, LCLS_2025
WP4 – Potential FEL Output Performance Enhancements
LCLS-II: An upgrade for the LINAC Coherent Light Source
Beam dynamics for an X-band LINAC driving a 1 keV FEL
Sara Thorin, MAX IV Laboratory
LCLS efforts: Self-seeding -- status report
(Selected) Project Management Processes at the XFEL
E-XFEL Status and First Beam Results
LLRF'15 Workshop, Shanghai, Nov. 4, 2015
Status and Interest of the X-ray FEL SINAP
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
Planning the Experiment
Tunable Electron Bunch Train Generation at Tsinghua University
Gu Qiang For the project team
Paul Scherrer Institut
Margaret Koulikova1, William Colocho+
LCLS Instrument Development
LCLS-II-HE FEL Facility Overview
Magdalena Kowalska, CERN PH-SME-IS
LCLS Commissioning Parameters
LCLS-II-HE FEL Facility Overview
Some Thoughts on Figures of Merit, SC and RT Facilities
Diagnostics overview and FB for the XFEL bunch compressors
Data Mining Ideas.
SLAC ARD Test Facilities
Multiplexing of LCLS II SXR beamlines using a canted undulator concept
CPU SCHEDULING.
TW FEL “Death-Ray“ Studies
Reconstruction algorithms Challenges & Future work
LCLS Commissioning Parameters
Summary Thursday h21: Stable beams fill #1303.
WBS 5.0 LCLS Strategic Projects Division
Advanced Research Electron Accelerator Laboratory
Z. Huang LCLS Lehman Review May 14, 2009
Two-bunch self-seeding for narrow-bandwidth hard x-ray FELs
Jim Clarke ASTeC Daresbury Laboratory March 2006
Brief Introduction to (VUV/)Soft X-ray FELs
X-ray Pump-Probe Instrument
Experimental Program and Endstations System (WBS ) J
LCLS Operation in 2009 Roger A. Erickson
Introduction to Free Electron Lasers Zhirong Huang
European XFEL Status Winni Decking, DESY
P. Emma, for the LCLS Commissioning Team LCLS DOE Review May 14, 2009
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Presentation transcript:

Non-user time 2/7 of total Background The FEL Performance Program started in the January 2014 Goal: “Make the best use of non-user time to improve the performance and capability of the machine.” . . . User Beams Maintenance PAMM, urgent problems, BBA ~25% Development e-, x-ray, ~50% Setup prepare configs instrument checkout ~25% User Beams. . Non-user time 2/7 of total

Functional Organization Performance Program Management J. Welch, W. White Scheduling and Coordination J. Turner Quality J. Welch 5 Program functions are chosen to cover all aspects of the beam the users receive Scheduling deals with the real-world complications Management keeps system going and helps provide transparency Good cross-over between photon and electron work. Capability Z. Huang Stability T. Maxwell/F.J Decker Reproducibility R. Iverson/W. Colocho Photon M. Minitti

How it works Each Program has a clear Objective and Scope defined in a synopsis. User Run Schedule is made by LCLS and sets the user and non-user time. Overall % allocation of development time for each program is assigned by Performance Program Managers at beginning of user run. Program Leads decide priorities within their program, plan and organize studies, and make sure analysis is done and reported. Individual studies are scheduled each week using the % allocations.

Actual allocation Overall since 11/12/13 Run 12 as of 1/5/16

OLD issues Maintenance time is too large Need feedback on program balance. Rebalance from 40% Capability, 20% Quality, 10% Reproducibility, 10% Stability, 20% Photon? Program goals need updating for next run

New issues Efficiency improvement needed Management and priority decisions are needed for Transfer to operations of new capabilities Special setups LCLS-II studies.

Capability Goals Run 11 and 12 Capability Finish dechirper commissioning Use dechirper for FEL operation (is this TTO?) Use dechirper for FEL manipulations (fresh bunch, seeding, 2-color) Develop ns-separation two bunches with same/different energy separation, time scan capabilities Develop two bunches with up to 1 us separation Study BC configurations to reduce microbunching and SXRSS pedestals Test cathode laser transverse shaping project Test heater laser transverse shaping project Capability

Stability Goals Run 11 and 12 Stability Consistency: Meet or exceed energy stability goal (< SASE BW / 2) for > 75% of routine operation Projects: Deuterium thyratrons installed to stations 20-6 through 21-2 Installation and demonstration of 2 new high power RF loads TTO of thyratron remote ranging New initiative: Investigate means to reduce frequency of interruptive RF station trips Stability

Quality Goals Run 11 and 12 Quality Finish at least 12 of the 32 “in progress” studies. Generate at least 12 “proposals” Start at least 6 new studies Get peak mJ that is no lower than for Run 10 Get peak power that is no lower than for Run 10 Quality

Performance Program (organized MD effort) ~3-5 year future 2016 5 2021 10 2026 15 2031 20 2036 LCLS1 LCLS2 new beam lines Mystery Future Solve dark energy/matter Solve world energy needs Artificial intelligence Lots of random stuff Performance Program (organized MD effort) Formalized TTO effort

3-5 year improvements Studies for higher brightness and more photons per pulse, better pulse stability, reduced tune-up time Studies and training involve Ops for better flexibility and efficiency to easily deliver pump-probe configurations polarization seeded beams very short bunches ??? We need to Consolidate and Push - this is the chance. In 2022 we will be learning how to deliver SC beams.

Run 11 expectations energy range 280 -11200 eV 1-3 mJ/pulse up to 25 keV at 1% pulse energy variable pulse length 40 to 300 fs pulse length <10 fs, and ~500 fs for soft x-rays, available seeded pulse energy 7.1 - 9.5 keV, and “typical” seeded parameters include 5.4?? to 9.5 keV; available from SASE in less than 30 minutes two color, soft and hard, uncertain parameters

Transition to operations

Discussion New capabilities are proven within the Capabilities program, but commissioning them and making them routinely available for users has become an increasingly large fraction of the non-user time. Process and responsibilities are not well defined. How do we decide how much time to give TTOs?

Examples HXRSS - took ~50 shifts of MD time, about two years XTCAV - commissioning started end of 2013 and went on for ? SXRSS - commissioning started early 2014 and continues today

TTO Projects SXRSS DELTA laser timing for LCLS-I Ops MBNCH Dechirper

TTO Process Synopsis Approval TTO Execution Formal Handoff States lead, TTO project name, goal, scope of work, estimated time and other resources. Template at https://portal.slac.stanford.edu/sites/lclscore_public/tto/SitePages/Home.aspx. Approvers should work with Lead to write synopsis Approval Approvers include responsible OPs and L&FEL personnel. Also need to include whoever is funding the work. TTO Execution TTO Process OPs and L&FEL provide resources, timely reviews, etc. Lead executes Formal Handoff All approvers meet and agree it is ready to hand off to Ops for regular delivery to users. When is the capability announced to users? Available for users Ops to maintain capability, requesting help from L&FEL as needed.

TTO website https://portal.slac.stanford.edu/sites/lclscore_public/tto/SitePages/ Home.aspx Contains synopses of projects