molding eng. ass. welding stamping welding start end FA stamping

Slides:



Advertisements
Similar presentations
Problem 4.1 The Traffic Court of King James County operates 9 am-1 pm. Each morning, roughly at 9 p. m., 200 defendants show up for trial involving traffic.
Advertisements

Throughout Problems.
Wash, mix, spoon BakeCoolPackAccept Payment min per dozen. 7.5 dozen per hour 10 min per dozen 6 dozen per hour 5 min per dozen 12 dozen per hour.
Chapter 6 Batching & Flow Interruptions Setup Times & EOQ
Accounting Information, Relevant Costs, and Decision Making
Lean Operations (JIT) Module
Assignment Capacity.
Kenneth J. Andrews EMP Gen-X: Manufacturing Analysis What is the process?Build & test of AXIS machine for a specific Customer Who is the customer?MegaPower-
Chapter 14 Contemporary cost management. Cost management §Improvement of an organisation’s cost effectiveness through understanding and managing the real.
Jai Hind Cycles Inc Matt Zbylut Mike Rosenthal Christian Mickelson Todd Madole.
Jai Hind Cycles, Inc. Manufacturing Simulation Using ProModel Daniel Ball and Debbie Leach Fall 2000.
Management is Essential
Next Generation Manufacturing in the Cleveland Region The Business Case for Adopting the NAM-Endorsed Skills Certification System 1.
THEORY OF CONSTRAINTS PROF DR FILIP ROODHOOFT. © Vlerick Business School THEORY OF CONSTRAINTS Philosophy Optimise the performance by managing the bottlenecks.
OPSM 301: Operations Management Session 7: Process analysis Koç University Zeynep Aksin
Curing Mold Laminations Miao Yu 05/17/2012. QC on the cross-section 30/30 samples before production 16/500 samples during production 2.
OPSM 301: Operations Management
Based on the book: Managing Business Process Flows.
Assembly / Disassembly Machines Foldable Information.
Ron Harbour President Harbour Consulting. Flexible Manufacturing.
Presented by: Beau Keyte, LEI Faculty APICS Greater Jacksonville Seminar December 5, 2002 Value Stream Mapping and Management.
Welding Machines Technologies The Chair trains high-qualified specialists, who can make various fabricated assemblies, create high performance welding.
Managing Processes and Capabilities CHAPTER THREE.
OPSM 501: Operations Management Week 4: Process analysis Kristen’s Cookie Koç University Graduate School of Business MBA Program Zeynep Aksin
WHO IS USING THIS BIKE? People who don’t prefer gear bikes. Females. Teenagers. People of age more than 35 years. And few more….
Exercise Find a schedule that minimises makespan..
Jai Hind Cycle Inc. Presented By: Mike Seide Sean McCauley Matt Zbylut Rebecca Gramse.
© 2009 BMA Inc. All rights reserved.  Capacity analysis provides an overview of how effectively you use time in each cell.  The time is categorized.
Advaned Planning and Scheduling J.Skorkovský, KPH.
Manufacturing Line Analysis Prepared by: Veronica MacInnis, Leah Hutchison, & Carina Zorrilla.
Foundations of engineering design I Class 12 – Oct 2 manufacturing presentations + teaming activity.
Pedibus Team 22 Team Members: Kyle Anderson Stephen Avery Alejandro San Segundo Brett Willenbacher Team No.22 Slide 1 of 15 Kyle Anderson Midterm I Sponsor:
© BMA Inc All rights reserved. Decision Making.
Unit 7.4 Welding. 1.Welding 1. Is it worth it to pay for welding school?...
NEW CAREER PATHWAYS USD 305 Salina Public Schools.
Performance Measurement Financial
Adding SubtractingMultiplyingDividingMiscellaneous.
Background: - Founded in 1924, Lee Industries has evolved from a tin can and heavy duty kitchen equipment manufacturer in to a global leader in process.
Assignment Capacity. 2 Ardavan Asef-Vaziri March, 2015Capacity- Basics MamossaAssaf Inc. fabricates garage doors. Roofs are punched in a roof punching.
Take order wash mix spoonload & set coolbake 6/1-2 doz219 unlo- ad pack 25 get pay 1/order Problem 5.2: Flow unit = 1 order of 1 dozen. The unit loads.
IENG 217 Cost Estimating for Engineers Estimating.
Award Criteria KA1 and KA2 projects are assessed using award criteria. Proposals must score a min 60 points And at least half of the maximum points awarded.
Jai Hind Cycle Inc. Presented By: Mike Seide Sean McCauley Matt Zbylut Rebecca Gramse.
Key Learnings: Little’s Law
Management is Essential
Management is Essential
Fire Extinguisher Seong hong seok Kang hyo yong
Managing Flow Variability: Safety Capacity
Why should you buy a Primo beam line vis-à-vis competition?
From Corporate Fitness Works Team Leader, Keriann Hill
CSU-1 Project Updates Mechanical:
Lean Implementation Training Agenda Example
APEX Electrical Interconnection Consultants, LLC
Constraint Management
Human Resource Management
Human Resource Management
Team 1: 32 responses Team 2: 55 responses Team 3: 29 responses
Continuous Improvement”
ريكاوري (بازگشت به حالت اوليه)
Buy now at
Press Ad Screen-shot.
LUKE BLOCKER & BRANDT LAMONTE ADVISOR: HO-HOON LEE
WELDING SYMBOLS. Need of welding symbols  The welding symbols used nowadays are considered shorthand for the welder.  Developing a clear means of communication.
Adding with 9’s.
Adding with 10’s.
Assignment Capacity The recorded solution to the first problem is available at
Production Preparation Process (3P)
Adding ____ + 10.
Economic Research & Extension
Quick Set-Up Technique
Presentation transcript:

molding eng. ass. welding stamping welding start end FA stamping Problem 5.4. The Process Flowchart from Problem 4.4 2 min 1 min 3 min molding eng. ass. welding aut. molding machine 1 engine assembler 1 molding operator 1 min 3 min stamping welding 30 min start continuous welding machine end FA 1 welder 2 min stamping 10,000lbs press 10 final assemblers 1 press operator 7 min seat ass. 2 seat assemblers

Unable to meet demand for this bike, Honda wants to increase throughput. A team member suggests cross-training the engine and seat assemblers. This suggestion should not be implemented because these resources are non-bottlenecks and therefore do not impact system throughput. We suggest increasing bottleneck capacity by decreasing welding times by design or process improvements. Other options are buying another welding machine and adding another welder, outsourcing some welding.