ACMA TIME TO MARKET Challenges and New Ideas Team Members : S Ramanujam, Brakes India Ltd, R V Shah, Jaya Hind Industries Ltd Amitabh Anand, NRB Bearings.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Load Management System with Intermittent Power on the Grid Ruth Kemsley CEng MIMechE MIEE Econnect Ventures Ltd.
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
1 Open PepsiCo 2009 Ian Noble R&D Director Foods Innovation.
PROJECT TITLE Project Leader: Team: Executive Project Sponsor (As Required): Date: Month/Day/Year 110/17/2014 V1.
DM Copyright © Tekes Digital Product Process.
1 SW Project Management (Planning & Tracking) Dr. Atef Z Ghalwash Faculty of Computers & Information Helwan University.
Product Lifecycle Management © 2003 IBM Corporation ArvinMeritor LVS (Light Vehicle Systems)  Customer Background o UK arm of worldwide group of companies.
Driving Efficient Cross-Border Trade Angela Baumann Solution Management SAP GTS SAP AG, 2005.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
DOCUMENT MANAGEMENT SYSTEM A Concept Overview. Logesys Solutions India Pvt. Ltd Need for Effective Document Management Effective document management enables.
© 2011 Underwriters Laboratories Inc. Product Recall and the Supply Chain: ISO Best Practices Robert Pollock Chair, US Technical Advisory Group for ISO.
1 Achieving Total Systems Management (ATSM) Acquisition Strategies to Increase Reliability and Reduce Logistics Footprint PEO/SYSCOM Workshop November.
2003 Indigo Technology, Inc. All Rights Reserved Integrated Process Teams Process Management Quality Assurance Configuration and Data Management Program.
SWE Introduction to Software Engineering
Class 6: Chapter 4 : Product/Process Innovation
14.1 © 2007 by Prentice Hall 14 Chapter Project Management: Establishing the Business Value of Systems and Managing Change.
Quality By Design By: Ruth Burgess, Ann LeDuc & Paula Ziegler.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Fundamentals of Information Systems, Second Edition
By Saurabh Sardesai October 2014.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects l.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 2 A Strategy for the Appraisal of Public Sector Investments.
Copyright © 2014 McGraw-Hill Higher Education. All rights reserved. CHAPTER 4 Product/Process Innovation McGraw-Hill/Irwin.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management Principles Understand the business environment Choose the “right” project Understand the energy value chains Identify risks – “hard”
Deerfield Beach Fort Pierce Jacksonville. Agenda Business Issues KAMM Capabilities KAMM Experience Why KAMM Business Issues KAMM Capabilities KAMM Experience.
Project management DeSiaMore 1.
Copyright © 2010 Accenture All Rights Reserved. 1 Copyright © 2010 Accenture All Rights Reserved. Accenture, its logo, and High Performance Delivered are.
ERTMS state of the art and evolution of the applications considering customer’s orientations.
Business Analysis: A Business Unit Perspective International Institute of Business Analysis January 18, 2012.
Purpose: These slides are for use with customers by the Microsoft Dynamics NAV sales force and partners. How to use: Add these slides to the core customer.
1 WARFIGHTER SUPPORT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP.
INDIANA UNIVERSITY February 2000 Paul Shackelford Partner.
According to the reporters’ research, the logistics industry is currently facing some problems such as capacity, infrastructure, security, rising truck.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
SOA IT Top 5 Critical Factors for Successful PeopleSoft 9.2 upgrade.
© 2008 IBM Corporation Challenges for Infrastructure Outsourcing July 29, 2011 Atul Gupta Vice President, Strategic Outsourcing, IBM.
©Ian Sommerville 2000Software Engineering, 6th edition. Chapter 4 Slide 1 Project management l Organising, planning and scheduling software projects.
Project „ Information and Communication Technologies solutions for improvement of quality in the municipal utilities” Nr. LLV-393.
©Ian Sommerville 2000 Slide 1 Project management l Organising, planning and scheduling software projects l Objectives To introduce software project management.
RBC Supply Chain Solutions. Who we are ? RBC Sourcing provides e-procurement solutions through a unique blend of proven on-demand technologies, affordable.
CHAPTER 2 Supply Chain Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 2-2 Supply Chain Management.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
SCOR® Risk Management Team Update
1 Project management. 2 Topics covered Management activities Project planning Project scheduling Risk management.
Chap 4. Project Management - Organising, planning and scheduling
1 Managing New Product Introduction: Life Cycle Phases Team Members: Jhon Benavides Sabrina Patino Russ Watt June 5, 2009 Solar Plus.
Product/Process Innovation CHAPTER FOUR McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Project management 1/30/2016ICS 413 – Software Engineering1.
RBC Supply Chain Solutions. Who we are ? RBC is a European network of procurement specialists offering consultancy on purchasing strategies, supplier.
DATA MANAGEMENT AND IT IN BA/BE STUDIES DR. SHIVPRAKASH MANAGING DIRECTOR SYNCHRON RESEARCH SERVICES PVT. LTD., INDIA.
Fall CS-EE 480 Lillevik 480f06-l4 University of Portland School of Engineering Senior Design Lecture 4 Definition phase Design phase.
The National Skills Academy for Rail (NSAR) Neil Robertson - CEO.
1 Project management Organising, planning and scheduling software projects.
Leading a Virtual Team. Natalia Khandros, Global Sourcing, Pratt & Whitney.
An Iterative Method For System Integration
Fundamentals of Information Systems, Sixth Edition
MAXIMISING VALUE FOR MONEY SUBJECT TO COST CONTAINMENT
Open Source Innovation within your Business Model Innovation
Moog VeriPart®: Secure, Authentic Parts for On-Demand Supply Chains
Group: Ulashova Zarnigor Xasanboyev Muhammad Mamarasulov Zayniddin Qurbonov Islom.
MRL 6 Artifacts (at End of TMRR) Page 1 of 6
Work-force planning involves two major activities
Project Management Training
Cognic Systems Corporate Profile.
Presentation transcript:

ACMA TIME TO MARKET Challenges and New Ideas Team Members : S Ramanujam, Brakes India Ltd, R V Shah, Jaya Hind Industries Ltd Amitabh Anand, NRB Bearings 11 th February, 2011

TIME TO MARKET : Challenges Shorter Product life Cycle Manage Delays wrt Design finalisation by Customer Planned / Unplanned Product Design Iterations by Customers Government Regulations requiring Product up- gradations Capability to meet changes in Product Portfolio ownership Managing Product Development due to Increase in Variants. Flexibility to act fast to the Design changes by the Customer for their Products in the Market.

TIME TO MARKET : Challenges Eliminate / Minimise Design Errors Alignment of Right Resources at Right Time Overcome Delays in Internal Communication and Approvals In Time Facility Creation Improve Supply Chain Capability Adhere Stringent Product Specifications Overcome High Attrition Rate, Difficulty to Replace

TIME TO MARKET : New Ideas Identify Right Technology Partner/Go for Technical Alliances Redefine Business Strategy and work for Technology Development Have Design Leadership – Use of Digital Techniques Concurrent Engineering Faster Prototyping Risk Assessment and Mitigating Risk by Planned Iterations Strong Revision Controls and Process Monitoring Improve Response System by fixing Right Review Milestones and measure Periodic Review with the Customer / Supplier : Traffic Light Chart Approach

Effective Resource Management : Manpower, Equipments -applying DSM Techniques ? Standardise Process and Operations leading to faster Implementation Stage Approach for Product Development Spiral Approach for Component level Development Recording Open Issues / arrive Solutions thro team meetings /functional meetings and use them as learnings for future Streamlining Sourcing Strategy / Supply Chain Critical Chain Method for Project Management TIME TO MARKET : New Ideas

Thank You for Your Attention