2nd year SAFER Project meeting. Armada Hotel, Istanbul, Turkey 25-27 June, 2008. Information-dependent lead time maps for earthquake early warning in the.

Slides:



Advertisements
Similar presentations
WP 4: Real -Time Shake Maps GRSmap a tool for rapid estimation of ground-shaking maps for seismic emergency management in the Campania Region of southern.
Advertisements

Earthquake engineering and real-time early warning: the AMRA perspective. Iunio Iervolino* and Gaetano Manfredi *Assistant Professor of Structural Engineering.
Università di Napoli Federico II Dipartimento di Ingegneria Elettrica SAS Project Electromagnetic analysis of protection systems for airport structures.
On going development of a seismic alert management system for the Campania region (southern Italy) A.Zollo(1), G. Iannaccone(2),C.Satriano(1), E.Weber(2),
Seismic analysis and design of
Real-Time Estimation of Earthquake Location and Magnitude for Seismic Early Warning in Campania Region, southern Italy A. Zollo and RISSC-Lab Research.
PREDICTION OF RESPONSE SPECTRAL PARAMETERS FOR BHUJ EARTHQUAKE (26TH JANUARY 2001) USING COMPONENT ATTENUATION MODELLING TECHNIQUE By DR. SAROSH.H. LODI.
PROGRAMME VI. MATERIAL-TECHNICAL EQUIPPING AND INSTITUTIONAL DEVELOPMENT OF STATE SERVICES PRESENTED BY THE INSTITUTE SEISMOLOGY OF ACADEMY SCIENCES OF.
Operational Earthquake Loss Forecasting in Italy: Preliminary Results I. Iervolino, 1 E. Chioccarelli, 1 M. Giorgio, 2 W. Marzocchi, 3 A. Lombardi, 3 G.
1 U.S. Department of the Interior U.S. Geological Survey Earthquake Monitoring and Reporting through the Advanced National Seismic System Briefing for.
International Insurance-Reinsurance Forum 2012 Managing catastrophic risks From Seismic Hazard Analysis to Seismic Risk mitigation C.O.Cioflan Ph.D., Senior.
Prague, March 18, 2005Antonio Emolo1 Seismic Hazard Assessment for a Characteristic Earthquake Scenario: Integrating Probabilistic and Deterministic Approaches.
1 SEISMIC RISK ASSESSMENT Dr. Carlos E. Ventura Kate Thibert & Hugón Juárez García February 26 th, 2007.
Deterministic Seismic Hazard Analysis Earliest approach taken to seismic hazard analysis Originated in nuclear power industry applications Still used for.
1 High Performance Computing at SCEC Scott Callaghan Southern California Earthquake Center University of Southern California.
GMSM Methodology and Terminology Christine Goulet, UCLA GMSM Core Members.
Quantifying risk by performance- based earthquake engineering, Cont’d Greg Deierlein Stanford University …with contributions by many 2006 IRCC Workshop.
The use of risk in design: ATC 58 performance assessment procedure Craig D. Comartin.
Demand and Capacity Factor Design: A Performance-based Analytic Approach to Design and Assessment Sharif University of Technology, 25 April 2011 Demand.
Roberto PAOLUCCI Department of Structural Engineering
By virtue of the sloping topography of the region and the quality of the soil, as well as its proximity to the Dead Sea fault, region is exposed to.
Multi hazard approach to design of civil structures April 29 th 2010 Multi hazard approach to design of civil structures Domenico Asprone Dipartimento.
SECOND EUROPEAN CONFERENCE ON EARTHQUAKE ENGINEERING AND SEISMOLOGY ISTANBUL | Turkey | Aug , 2014 Feasibility study of a nation-wide Early Warning.
SCEC: An NSF + USGS Research Center ShakeAlert CISN Testing Center (CTC) Development Philip Maechling Information Technology Architect Southern California.
Seismic Upgrade Risk versus Benefit Shawn Callahan Mike Pollard 5/31/11.
Turkey Earthquake Risk Model Financing the Risks of Natural Disasters World Bank Washington, DC, June 2-3, 2003 Dennis E. Kuzak Senior Vice President,
Outline: Lecture 4 Risk Assessment I.The concepts of risk and hazard II.Shaking hazard of Afghanistan III.Seismic zone maps IV.Construction practice What.
Performance-Based Earthquake Engineering
CISN Earthquake Early Warning UC BerkeleyCaltechSCEC/USC U.S. Geological Survey Real-time testing of algorithms statewide Richard Allen, UC Berkeley.
Structural Engineering Issues for a Large Cascadia Event.
Seismic Hazard Assessment for the Kingdom of Saudi Arabia
Earthquake Hazard Session 1 Mr. James Daniell Risk Analysis
FEASIBILITY STUDY OF A REGIONAL EEW SYSTEM FOR THE EASTERN CARIBBEAN REGION ZUCCOLO Elisa, SALAZAR Walter, DI SARNO Luigi, FARRELL Anthony, GIBBS Tony,
NA3 DORII: Deployment of Remote Instrumentation Infrastructure Matteo Lanati EUCENTRE (European Centre for Training and Research in.
1 Risk comments including some Re-insurance issues (Socio-Economic Security)  Jorge A. Prieto, PhD. PEng.  Natural Resources Canada, Geological Survey.
Michael Hodges, Chris Kohlenberger, Nolan Mattox, and Christian Vanderwall Seismic Hazard Map Plugin Improvement of ShakeMap Plugin Custom Color Maps Team.
Earthquake Vulnerability and Exposure Analysis Session 2 Mr. James Daniell Risk Analysis Earthquake Risk Analysis 1.
Earthquake Science (Seismology). Seismometers and seismic networks Seismometers and seismic networks Earthquake aftershocks Earthquake aftershocks Earthquake.
Disaster Mitigation and Management Organization
Earthquake Damage Unit. Where would you be the safest in an earthquake? Open level field away from buildings Movement of the ground rarely causes deaths.
Estimation of Future Earthquake Annualized Losses in California B. Rowshandel, M. Reichle, C. Wills, T. Cao, M. Petersen, and J. Davis California Geological.
Application of SASHA for the Icelandic case Vera D’Amico 1, Dario Albarello 2, Ragnar Sigbjörnsson 3, Rajesh Rupakhety 3 1 Istituto Nazionale di Geofisica.
OPENQUAKE Mission and Vision It is GEM’s mission to engage a global community in the design, development and deployment of state-of-the-art models and.
LESSONS FROM PAST NOTABLE EARTHQUAKES. Part IV Walter Hays, Global Alliance for Disaster Reduction, Vienna, Virginia, USA.
Lg Q Across the Continental US Dan McNamara and Rob Wesson with Dirk Erickson, Arthur Frankel and Harley Benz.
Click to edit Master subtitle style Japanese Earthquake Early Warning System By Nick Labsvirs.
An Assessment of the High-Gain Streckheisen STS2 Seismometer for Routine Earthquake Monitoring in the US ISSUE: Is the high-gain STS2 too sensitive to.
SCEC: An NSF + USGS Research Center Evaluation of Earthquake Early Warnings as External Earthquake Forecasts Philip Maechling Information Technology Architect.
Probabilistic seismic hazard assessment for the pseudo-negative stiffness control of a steel base-isolated building: A comparative study with bilinear.
GIS APPLICATIONS IN EARTHQUAKE ENGINEERING: NORTHWEST TURKEY
4th International Conference on Earthquake Engineering Taipei, Taiwan October 12-13, 2006 Site-specific Prediction of Seismic Ground Motion with Bayesian.
Ground Motions and Liquefaction – The Loading Part of the Equation
Gaetano Festa, Aldo Zollo, Simona Colombelli, Matteo Picozzi, Alessandro Caruso Dipartimento di Fisica; Università di Napoli Federico II.
EARTHQUAKES Week 2.
Earthquake Site Characterization in Metropolitan Vancouver Frederick Jackson Supervisor – Dr. Sheri Molnar.
ShakeAlert CISN Testing Center (CTC) Development
Yelena Kropivnitskaya, Kristy F. Tiampo,
Risk Assessment.
British Seismology Meeting 5th – 7th April 2017, Reading, UK
Eduardo Ismael Hernández UPAEP University, MEXICO
Management of Earthquake Risks using Condition Indicators
NGA-East Tentative Plan
Understanding Earth Chapter 13: EARTHQUAKES Grotzinger • Jordan
Creating the Virtual Seismologist
Engineering Geology and Seismology
Earthquake and Tsunami Program Governor’s Office of Emergency Services
A SNAPSHOT OF THE SITUATION ASSESSMENT IN JAPAN ON DAY 4
Dr. Praveen K. Malhotra, P.E.
Deterministic Seismic Hazard Analysis
Presentation transcript:

2nd year SAFER Project meeting. Armada Hotel, Istanbul, Turkey June, Information-dependent lead time maps for earthquake early warning in the Campania region Iunio Iervolino Assistant Professor of Structural Engineering Dipartimento di Ingegneria Strutturale Università degli Studi di Napoli Federico II, Naples, Italy.

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Naples Hospitals Fire Stations Lifelines Factories Railways Highways 4 Cities The Campanian case

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Source-to-site distance Seismic network Ground motion at the site IM (i.e. PGA) Structural/non-structural performance/loss EDP (i.e. Maximum Interstory Drift Ratio) Epicenter Signal at the network stations Site-Specific Warning by Regional Networks

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps PDF of magnitude conditioned to the measures of the seismic instruments PDF of distance due to rapid localization method Ordinary Attenuation relationship Prediction of peak ground motion at the site Real-Time Hazard Analysis for Hybrid EEWS

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Real-Time loss assessment Extending the hazard approach it is possible to determine the expected losses conditioned to the measurements of the seismic network in the case of alarming or not Expected Loss 1. Loss probability depending on the alarming decision 2. Structural damage probability depending on buildings seismic response 3. Seismic response probability depending on hazard 4. Real-time hazard analysis ExposureVunerabilityHazard

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps How to set the alarm threshold: a simple example Lets consider a simple school class equipped with a ringer and suppose that the students are trained to shelter under the desks when the alarm is issued. What Causes Loss: 1.Structural collapse (causes death) 2.Non-structural collapse (causes injury and eventually death) 3.False alarm (cause panic and down-time loss) Security action 1.Sheltering below desks may reduce losses in the case of non-structural collapse

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps M=6.6, Site at 131km far from the network Naples Estimation of Magnitude Estimation of Distance Estimation of PGA at the site

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Uncertainty Analysis Uncertainty due to the attenuation law Coefficient of Variation of the Estimation

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Uncertainty Analysis Findings Uncertainty on distance is confirmed to be negligible in EEW calculations; Also uncertainty on magnitude, altough larger than distance, is small if compared to that of the attenuation law; It is important to compute the hazard analysis including the uncertainty of the attenuation, which is the most important (this allows to copute missed and false alarm rates); To issue the alarm it is important to assess whether the level of information it is stable. E.g., triggering more station does not change the decision of alarming or not.

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Decisional rule PGAc Pc ALARM ! Because the probability that PGA exceeds the limit value is too high

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Lead-time maps, defined on a 2700 nodes grid covering the whole Campanian territory, have been computed as a function of the number of stations triggered. Events occurring in the area covered by the ISNet infrastructure have been consideredred (hypocentral depths in Campania are small ranging from ~ 4 to ~ 12 km).

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps D E S I G N M A P

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps Lead-time maps for the case-study region can be superimposed to real-time risk reduction actions for specific structural systems. These security measures can be classified according to the time required to be carried out.

Information-dependent lead time maps for earthquake early warning in the Camapania region Done so far: RT- PSHA & Threshold setUncertainty AnalysisTo doLead-Time Maps To the end of the project Design of a semi-active control system applied to a structure; The system may be tuned in real-time on the basis of a prediction of the response spectrum; Simulation of the system and risk assessment; If the EEWS lead to a reduction of the annual risk the EEWS is effective on the earhquake engineering perspective.