High gradients in TESLA nine-cell cavities

Slides:



Advertisements
Similar presentations
Status and Future of BESSY RF BESSY II operating since 1999 Willy Wien Laboratory groundbreaking 9/2004 HoBiCaT Testfacility for sc cavities Commissioning.
Advertisements

Tom Powers Practical Aspects of SRF Cavity Testing and Operations SRF Workshop 2011 Tutorial Session.
of LFD Compensation Study S1 Global Cryomodule
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Lorentz force detuning measurements on the CEA cavity
Lutz Lilje DESY -MPY- XFEL Tuner Lorentz Force Detuning System Setup New Saclay design.
Piezo Studies and Temperature Measurements Ruben Carcagno May 11, 2005.
Capture Cavity 2 Update Tim Koeth April 3 rd Testing at 4.5K.
Effects of the cryogenics operational conditions on the mechanical stability of the FLASH linac modules Ramila Amirikas, Alessandro Bertolini, Jürgen Eschke,
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
E. KAKO (KEK) 2009' Sept. 30 Albuquerque Global Design Effort 1 Cavity Test Items in S1-G Cryomodule Eiji Kako (KEK, Japan)
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Test infrastructure and test programs at KEK-STF Kirk 2013/3/26TTC meeting
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
TESLA MEETING May 2003 Frascati LINAC TECHNOLOGY WORKING GROUP Working Group Linac techology introduction Cryomodule design and Assy. Tuner issue.
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Recent LFD Control Results from FNAL Yuriy Pischalnikov Warren Schappert TTF/FLASH 9mA Meeting on Cavity Gradient Flatness June 01, 2010.
S.Noguchi (KEK) ILC08 Chicago , Nov . 17, Cavity Package Test in STF STF Phase-1 E. Kako, S. Noguchi, H. Hayano, T. Shishido, M. Sato, K. Watanabe,
RF Development for ESS Roger Ruber and Volker Ziemann Uppsala Universitet 4 Dec Dec-20091RR+VZ: ESS RF Development.
Marc Ross Nick Walker Akira Yamamoto ‘Overhead and Margin’ – an attempt to set standard terminology 10 Sept 2010 Overhead and Margin 1.
W. 5th SPL collaboration Meeting CERN, November 25, 20101/18 reported by Wolfgang Hofle CERN BE/RF Update on RF Layout and LLRF activities for.
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
ILC FAST TUNER R&D PROGRAM at FNAL Status Report CC2 Piezo Test Preliminary Results Ruben Carcagno (on behalf of the FNAL FAST TUNER Working Group) 4/5/06.
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Performance of magnetostrictive element at LHe environment 12th International Conference MIXDES 2005 Performance of magnetostrictive element at LHe environment.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Kirk Davis.
John Carwardine 20 April 09 Preliminary planning for Aug/Sept studies.
TESLA Linear Collider project overview and linac technology R. Brinkmann, DESY ITRP Meeting, RAL Jan. 28, 2004.
Progress report of the tilt monitor Daisuke OKAMOTO Tohoku University.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
1 Tuner performance with LLRF control at KEK Shin MICHIZONO (KEK) Dec.07 TTC Beijing (Michizono) S1G (RDR configuration) - Detuning monitor - Tuner control.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Overview Step by step procedure to validate the model (slide 1 and 2) Procedure for the Ql / beam loading study (slide 3 and 4)
SRF Cavities Resonance Control. CW mode of operation (FNAL’s experience). Yu. Pischalnikov W. Schappert FNAL TTC CW SRF Meeting, Cornell University, 12June,
Cavities, Cryomodules, and Cryogenics Working Group 2 Summary Report Mark Champion, Sang-ho Kim Project X Collaboration Meeting April 12-14, 2011.
LLRF regulation of CC2 operated at 4˚K Gustavo Cancelo for the AD, TD & CD LLRF team.
Test of the dressed spoke cavity
WP5 Elliptical cavities
Power Couplers, HOM Couplers and Tuners for the XFEL
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
R. Paparella, INFN-Milan, LASA Laboratory, Segrate, Italy
SCRF 21-25/Apr/2008 Measurement & Calculation of the Lorentz Detuning for the transient response of the resonant cavity Introduction “Two.
S1-G for TTC meeting Global Design Effort
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Cavity Theory Feng QIU.
Test plan of ESS HB elliptical cavity
Mechanical setups Lorentz Force Detuning System Setup
Status of Cavities at DESY
Test plan of ESS HB elliptical cavity
Cavity resonance control
Experience with High Loaded Q cavity Operation at JLAB
CW Operation of XFEL Modules
Degradation and possible sources Statistic of resonators
Review of the European XFEL Linac System
Summary on WG 2 LINAC Technology.
CW accelerating module test progress at DESY
Test plan of ESS HB elliptical cavity
Test plan of ESS HB elliptical cavity
Nick Walker (DESY) EU GDE Meeting Oxford
TTC meeting, Milano Global Design Effort
Exceptional Events During the Operation of the European XFEL
Summary of the maximum SCRF voltage in XFEL
Facility for Research Instrumentation and Accelerator Development
Presentation transcript:

High gradients in TESLA nine-cell cavities Lutz Lilje DESY -MPY- Lutz.Lilje@desy.de

Overview Standard etching Result of the CHECHIA test of an electropolished cavity Piezo compensation Lutz Lilje DESY 07.12.2018

High Gradient Performance Cavity AC 67 has a cold leak which was not located so far The Q vs. E curve‘s behaviour is due to Helium inside the cavity 16 cavities with standard treatment Lutz Lilje DESY 07.12.2018

Lutz Lilje DESY 07.12.2018

Nine-cell Cavities for TESLA-800 TESLA 800 goal Lutz Lilje DESY 07.12.2018

First High Power Test of an Electropolished nine-cell cavity Lutz Lilje DESY 07.12.2018

High Power Test of an EP nine-cell cavity Calib. Measurement HERA plant High Power Test of an EP nine-cell cavity 5 Hz, 500 us fill, 800us flat-top Feed-forward only No piezo compensation at the moment 33-35 MV/m with no interruption related to cavity-coupler-klystron since more than 100 hours 2 cryo problems at 95 and 130 hours resulting from connection to the HERA plant (scheduled calibration measurement at 65 hours shown in the plot) Very low activity in the high power coupler, temperature levels o.k. for 5 Hz No field emission observable Lutz Lilje DESY 07.12.2018

High Power Test of an EP nine-cell cavity Calib. Measurement HERA plant High Power Test of an EP nine-cell cavity 5 Hz, 500 us fill, 800us flat-top Feed-forward only No piezo compensation at the moment 33-35 MV/m with no interruption related to cavity-coupler-klystron since more than 130 hours 2 cryo problems at 95 and 130 hours resulting from connection to the HERA plant Cryo shutdown right now due to problem of impurities in He circuit (from HERA plant) (scheduled calibration measurement at 65 hours shown in the plot) Very low activity in the high power coupler, temperature levels o.k. for 5 Hz No field emission observable Lutz Lilje DESY 07.12.2018

High Power Test of an EP nine-cell cavity Calib. Measurement HERA plant High Power Test of an EP nine-cell cavity 5 Hz, 500 us fill, 800us flat-top Feed-forward only No piezo compensation at the moment 33-35 MV/m with no interruption related to cavity-coupler-klystron since more than 130 hours 2 cryo problems at 95 and 130 hours resulting from connection to the HERA plant (scheduled calibration measurement at 65 hours shown in the plot) Very low activity in the high power coupler, temperature levels o.k. for 5 Hz No field emission observable Lutz Lilje DESY 07.12.2018

Piezoelectric tuner M. Liepe, S. Simrock, W.D.-Moeller Tuning mechanism Piezo Piezo-Actuator: l=39mm Umax=150V  l=3m at 2K fmax,static=500Hz He-Tank & Cavity Lutz Lilje DESY 07.12.2018

New Piezo-assisted Tuner setup Sensor-Actuator configuration To compensate for Lorentz force detuning during the 1 ms RF pulse Feed-Forward To counteract mechanical noise, “microphonics” Feed-Back Lutz Lilje DESY 07.12.2018

Frequency detuning during RF pulse Beam on Frequency detuning due Lorentz forces of the electromagnetic field in the cavities: Δf = K • Eacc2 where K ≈ 1 Hz / (MV/m)2 Remember: Cavity bandwidth with main coupler is ≈ 300 Hz Lutz Lilje DESY 07.12.2018

Frequency stabilization during RF pulse using a piezoelectric tuner Blue: With piezo Red: Without piezo Frequency detuning of 200 - 250 Hz compensated with rectangular voltage pulse (~120 V) on the piezo. Lutz Lilje DESY 07.12.2018

Frequency stabilization at 35 MV/m Blue: With piezo Red: Without piezo Frequency detuning of ~1000 Hz compensated with resonant excitation of a mechanical cavity resonance at 230 Hz. NOTE: This is rather an demonstration of the capability of active tuning. Application in a real machine is probably difficult/impossible. Lutz Lilje DESY 07.12.2018