Extract from today’s talk given to DCB

Slides:



Advertisements
Similar presentations
Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Advertisements

Positron Source Update Jim Clarke Deepa Angal-Kalinin James Jones Norbert Collomb At Daresbury Laboratory and Cockroft Institute 21/07/2009.
1 IR Hall for GLD Oct Y. Sugimoto KEK. 2 Underground hall HybridPure CMS IR hall area (WxL)25x55 Beam height8.6 Crane max hook height20.5 Largest.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
Global Design Effort - CFS Baseline Assessment Workshop 2 - SLAC Reduced Bunch Number 1 BASELINE ASSESSMENT WORKSHOP 2 CONVENTIONAL FACILITIES.
DH in Hybrid-A and ILD 2014/9/5 Yasuhiro Sugimoto 1.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 GLD Surface Assembly Y. Sugimoto KEK
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 Alternative assembly option of ILD Y.Sugimoto 2010/10/18 ILD Integration
Experimental hall in Japanese mountain site Y. Sugimoto 1.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
September 20, 2006 Global Design Effort 1 Process of change of BDS baseline to 14/14 configuration BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto,
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
Radiation safety evaluation for “KAMABOKO” Main Linac Tunnel KEK-APL : T.Sanami, S.Ban KEK-ACC : A.Enomoto, M.Miyahara ILC Mechanical & Electrical Review.
1 BDS and Detector schedules for discussion at MDI meeting August 15, 2006 Andrei Seryi with input from Martin Gastal, Yasuhiro Sugimoto et al.
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Global Design Effort - CFS TILC08 Working Group 1 - March 5, CFS Cost Reductions Conventional Facilities and Siting Group A. Enomoto, V.
Interaction Region & IR integration EDR Planning Tom Markiewicz/SLAC SLAC BDS Kick-Off-Meeting 13 October 2007.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
ILC MDI workshop January 6-8, 2004 PEP-II IR M. Sullivan 1 Interaction Region of PEP-II M. Sullivan for the ILC MDI workshop January 6-8, 2005.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
August 11, 2011 FNAL Meeting Global Design Effort 1 DR-CFS Discussion Mark Palmer GDE.
Experimental hall in Japanese mountain site 2011/11/30 Yasuhiro CFS Webex meeting 1.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
Status of GDE BDS Design Talk based on several talks presented by BDS area leaders Andrei Seryi, Hitoshi Yamamoto, Deepa Angal-Kalinin at and after Vancouver.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
21 July 2006, Vancouver Global Design Effort 1 PPS - division into zones and shield wall locations - N. Terunuma KEK.
CFS EDR KICK OFF MEETING Air Treatment August 23, 2007 Lee Hammond, FNAL CFS.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Summary of Day1 of the Mini-WS and Santander Plan K. Yokoya CRWG 9, KEK 2016/4/19 MiniWS summary1.
1 Update of detector hall in mountain regions Y.Sugimoto in Granada.
Experimental Hall in Mountain Regions
CLIC Civil Engineering Update
Updated Design of Detector Hall
Introduction and Meeting Objectives
Detector Utility/Service Cavern
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
FCC Civil Engineering John Osborne, Jo Stanyard, Matt Stuart(SMB - Site Engineering - FAS Section) Cost & schedule Phase 3 - specification 10th May 2017.
Marco Oriunno (SLAC), March 12, 2014 MDI WG
Experimental hall design in Japanese site
Integration Ideas for the Central Region Some old some new
Summary of WG2 :CFS for staging
Update of experimental hall in Japanese mountain site
Detector Service Cavern for ILC
Beam Delivery update Andrei Seryi December 12, 2005
Hybrid Access Optional Study
Detector hall in mountain regions
AD & I : BDS Lattice Design Changes
Beam Delivery System Schedule at ILC2010
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
Detector hall in mountain regions
BDS civil construction Single IR upgrade scenarios discussion
CFS consideration on the Main Dump and around
8-10 April 2014 CFS-ADI Joint Meeting
NLC 2001 Beam Delivery Layout
Some of the Points Raised During my JLAB Visit
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

Extract from today’s talk given to DCB BDS layout Extract from today’s talk given to DCB August 22 Full version at http://www-project.slac.stanford.edu/ilc/acceldev/beamdelivery/rdr/docs/BDS_for_DCB_August_22.ppt August 22, 2006 Global Design Effort

Tentative layout of 14/14 configuration Common IR hall 100L*30Wm at z=0 with 28.4m separation of IPs 15m shafts equipped with elevator and stares in IR hall 4m tunnels in all BDS Straight tunnel which goes to IR1 (for multi TeV) Tunnel going to IR2 follows the beamline Alcoves 4*6m every 100m, no service tunnel Halls for dump cooling system 35*20m Small 0.8m shaft for lasers near laser wire, upstream and downstream diagnostics Passages near muon walls (main and spare one) 9m machine access shaft near BSY Shortened extraction line Shorter tapered tunnels. Etc. Aug 22, 06 Global Design Effort

CF&S cost minimization considerations in new layout Removing service tunnel and use alcoves Reducing tunnel diameter from 5m to 4m (use the fact that swing of BDS in 20/14mr is smaller than in 2mr) Reduce BSY tunnel separation to 3m Assume that CF&S will change methodology of tapered tunnel costing Remove detector service cavern Minimize number of shafts in IR Cost min collider hall, assign the difference to detector (to be discussed with Detector colleagues) Removing cost of e+ bypass line from BDS Aug 22, 06 Global Design Effort

Tunnel with alcoves If alcoves of 4*6*4m3 are placed every 100m, the cost of the single tunnel seem to increase by 10-20% The interval of 100m is determined by BPM electronics, and cable cost. Finding the optimum dL and alcove size requires more study To evaluate the cost difference, one need to add cost of any additional shafts (assess and “laser shafts”), their caverns, surface buildings cost of alcoves in all tunnels (including e+ if it is present) cost of vibration mitigations for pumps any additional air cooling which may be required etc. Without the service tunnel, the reliability and tune-ability of the system are affected, but it is hard to estimate the corresponding cost impact Aug 22, 06 Global Design Effort

T stability For beamline stability, set a goal of <100W/m deposition into the tunnel (like in best light sources) Would like to have Air: 0.2degC over 1hour, 2degC over 24hours LCW: 0.1degC over 1hour, 1degC over 24hours But do not yet know what the cost of these reqts With alcoves, this is more of an issue The absolute T also matters if T is too high at work, and need to drop T during access, this is major stability concern Under discussion now Aug 22, 06 Global Design Effort

Tunnel diameter in 14/14 In 2/20 config, was using 5m tunnel swing of 2mrad BDS was somewhat larger, due to design constraints, than in 20mr, and wanted to use straight tunnels in BDS (for upgrade flexibility) One can now consider 4m tunnels Still, have straight tunnel from the linac to IR1 (for Multi-TeV upgrade compatibility) One can allow that tunnel would follow the beamline of IR2 (Reducing tunnel diameter also reduce the muon spoiler size and its cost by 30%) Aug 22, 06 Global Design Effort

Layout with 4m tunnel This tunnel slightly follows the beamline This tunnel is straight (for multi-TeV) (except minor knee near IP) Aug 22, 06 Global Design Effort

BSY tunnel separation 3m 3m separation seems sufficient for FNAL-type rock [F.Asiri & J.Cogan] This reduce the length of the tapered tunnel Aug 22, 06 Global Design Effort

Tapered tunnel costing => Cost separately the part which will be done by TBM and only remaining part by drill&blast This whole volume was costed as drill&blast Aug 22, 06 Global Design Effort

Removal of detector service cavern layout as of Vancouver In Vancouver layout, have a service cavern between collider hall, to place detector equipment and service The need for such cavern for e+e- machine need to be re-evaluated (in e+e- do not have triggers, so do not have to place a lot of electronics close to detector) Suggest to remove the service cavern (and its shaft) and place all needed detector equipment in the collider hall Aug 22, 06 Global Design Effort

Minimize number of shafts in IR Do not install additional shafts in IR hall except two 15m shafts Equip those 15m shafts with stairs & elevators Example from GLD [Yasuhiro Sugimoto, KEK] Aug 22, 06 Global Design Effort

Minimize number of shafts in IR elevator stairs pipes cable trays Equip main IR shaft with elevator and stairs and use it for personnel access as well. Do not install any other 9m shafts hear IR hall 11.4m 3.6m 15m Aug 22, 06 Global Design Effort

Shaft cap on surface partial cap on surface solenoid (or other piece) before lowering down by gantry crane is sitting on the cap For e+e- machine do not have to use shaft cap even if detector not self-shielded. Partial cap is needed to allow CMS style assembly. Aug 22, 06 Global Design Effort

Discussion of IR hall cost assignment Requirements for collider hall sizes are different and range from 48L*18Wm to 72L*32W m^2, as well as for the shaft In order to make more clear comparison of detectors and streamline the overall optimization, one can consider the following suggestion: Include into the BDS cost only the cost of minimum size collider hall and small shaft for example, 100L*20W*30H m^3 hall, and two 9m shafts, no wall The cost difference from min configuration is included into detector cost E.g. D cost of increasing the shafts to 15m and increasing the hall size, and adding the shielding wall Aug 22, 06 Global Design Effort

Details of the new layout Small (0.8m) shafts for laser wire and polarimeters On surface buildings with laser rooms Aug 22, 06 Global Design Effort

Details of the new layout Small (0.8m) shaft for laser for downstream polarimeter. Transverse straight pass through rock to IR2 to another polarimeter. On surface buildings with laser rooms Tunnel “knee” to reduce volume of tapered tunnel (still straight path for multi-TeV is OK) Extraction line is shortened by 100m, relying more on beam sweeping to avoid water boiling and window damage (photons not swept, but their size is acceptably large) Aug 22, 06 Global Design Effort

Details of the new layout Passages around the 5m muon wall (the magnetized walls penetrate into the tunnel by ~0.5m) needed for personnel access, equipment transportation and alignment. Passages are long enough, allowing installing extra muon wall (up to baseline 18m) if needed 5m wall Passages around the muon wall which is not installed initially, but can be installed in upgrade (up to baseline 9m), if the muon background is too high Aug 22, 06 Global Design Effort

Details of the new layout Alcoves 4*6m, spaced at 100m for BDS equipment, PS, etc. Passages between beamlines 9m shaft for BDS access There is NO shaft at the end of the linac Aug 22, 06 Global Design Effort

Details of the new layout Cavern 35*20m for tune-up beam dump water cooling system Caverns 35*20m for main beam dump water cooling system Aug 22, 06 Global Design Effort