KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS January 2018

Slides:



Advertisements
Similar presentations
QUARTERLY REGIONAL WORKSHOP WATER SERVICES SUPPORT PROGRAMMES PROGRESS / LATEST DEVELOPMENT OF ALL PROGRAMMES Presented by: Mr G Constantinides Date: 30.
Advertisements

Global Fund Proposal Development in Guinea: Round 10 Malaria Sarah Weber Catholic Relief Services 23 March 2011.
University of Minho School of Engineering Territory, Environment and Construction Centre (C-TAC) Introduction Drought is a normal component that occurs.
PROGRESS ON THE HUMAN RESOURCES TASK TEAM DATE: 03 DECEMBER 2013.
WMIG AND LIMPOPO REGIONAL OFFICE LIAISON MEETING Lessons Learnt – Inkomati CMA Establishment and Development 12 December 2006.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Northern Cape.
Roseville Drought Response 2014 Ed Kriz Environmental Utilities Director 7 November, 2014.
DWA CORPORATE IDENTITY Presented by: Johan Maree Deputy Director: Media Production 12 December 2012 RBIG, NTP, ACIP, MWIG Quarterly Workshop Western Cape.
Millbrook Dam Environmental Assessment Study Dan Marinigh CAO/Secretary-Treasurer Otonabee Region Conservation Authority October 20, 2015 Otonabee Conservation.
The SaTH Foundation Trust Programme Deborah Shaw March 29th 2007.
QUARTERLY REGIONAL WORKSHOP WATER SERVICES SUPPORT PROGRAMMES SUMMARY OF DAY 3 Presented by: Date: 1 Nov 2013.
Proposed MMWD Rate Restructure MCOE District Business Officials November 4, 2015.
1 DISASTER MANAGEMENT Presentation to the Portfolio Committee on Provincial and Local Government 11 March 2003 (Mr LJ Buys)
Municipal Advisory Corporation Inc. June, Agenda  2014 Retention Program Summary  New Brunswick Drug Plan  Questions.
The Sustainable Groundwater Management Act and DWR’s Role in Sustainable Groundwater Management California Irrigation Institute 2016 Conference January.
QUARTERLY PERFORMANCE OF THE MUNICIPAL INFRASTRUCTURE GRANT (MIG) – 2005/06 AND 2006/07 FINANCIAL YEARS Presentation to the Select Committee On Finance.
National Guidelines for Integrated Management of Agricultural Water Use Developed by National Department of Agriculture with Department of Water Affairs.
Province of KwaZulu-Natal, South Africa Water Resources and Management- Drought _______________________________ For the Water resources and management.
Raw Water Availability in the Integrated Vaal River System Presented to:WSF Presented by:Kobie Mare Date:25 May
PERFORMANCE REVIEW Outlook for 2005/06 Financial Year Performance/Expenditure Expenditure review 2001/02 – 2007/08 Department of Local Government & Housing.
PCE Program Debrief Jim Eggemeyer, Director, Office of Sustainability Shawn Marshall, LEAN Energy US March 24, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Sustainable Groundwater Management Act Michael D. Nusser Water Resources Planning Manager June 17, 2015.
PRESENTATION ON THE ANNUAL CAMPAIGN STRATEGY AGAINST SOCIAL ILLS PROVINCIAL AIDS COUNCIL 1.
Budget 2005/2006 Focusing on Our Priorities BUDGET CONSULTATION Social Care and Health Scrutiny Committee 25 th January 2005.
PRIORITISATION FOR SCHOOL SPORT SUPPORT
Progress on Implementation of Transparency Requirements of TBT Agreement in Uganda EAC Public-Private Sector Workshop on WTO Transparency Requirements.
Drought Management Update
Current Situation. Water Shortage A-Z: 10 May 2017 Sub-Council 20: Alphen Hall, Constantia.
Evaluation of FY12 Tracking and FY13 Planning Process
Eastern Cape :2016/17 Stopping Considerations
City of Bixby, Oklahoma 2008 Multi-Hazard Mitigation Plan Update
Performance Management Strategic Initiative January 2017 Update
2017 Llano Estacado Regional Water Plan Planning Group Meeting
Republic of South Africa
Session 6 – Communications & Outreach
Progress on Implementation of Transparency Requirements of TBT Agreement in Uganda EAC Public-Private Sector Workshop on WTO Transparency Requirements.
MANDATE   The Housing Development Agency (HDA) has been established to facilitate and expedite the development of large scale integrated, sustainable human.
Sustainable Groundwater Management Act
Capricorn District Municipality
Houston GPS Timeline: Getting Started
Drought in Texas Texas Division of Emergency Management
FOR THE POTFOLIO COMMITTEE 4 February 2004
Consolidated Annual Municipal Performance Report (Section 47) 2014/15 The Select Committee on Co-operative Governance and Traditional Affairs 1.
Data Binder ©
Attendance Incentive Program
Student Assignment Review Advisory Committee
Appendix C New Administration General Assembly Session
Department of Cooperative Governance
Shasta Valley Groundwater Basin
Commonwealth of Virginia
FY st Draft Budget Administration & Finance Committee Municipal Water District of Orange County February 14, 2018.
Balancing the Operating Budget Ward Forum Presentation
Day 1 Overview and presentations of R204 from various stakeholders
Consolidated Annual Municipal Performance Report (Section 47) 2013/14 1 November 2016 The Select Committee on Co-operative Governance and Traditional.
Indicative PRIDe Project Plan
Overall Project RAG Status:
EASTERN CAPE ECD Conditional Grant Fourth Quarter 2017/18
DG AGRI, Unit F6 Bioenergy, biomass, forestry and climatic changes
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
ISSUES RAISED BY THE PORTFOLIO COMMITTEE IN RESPECT OF THE GROOT BRAK RIVER MUNICIPALITY 29 August 2012.
Update on The Local Control Accountability Plan (LCAP) --Stakeholder Input March 2019 Sandra Garcia Director, State and Federal Programs.
BRANCH: GOVERNANCE, POLICY AND RESEARCH Deputy Director-General
Session 4: Finalize Project Working Arrangements
IMproving DROught and FLOOD Early Warning, Forecasting and Mitigation using real-time hydroclimatic indicators. SUMMARY, FUTURE CALENDAR AND FINAL REMARKS.
Budget Planning Calendar
East Windsor – Forest Glade Area
Groundwater avoiding the single story
Resource Management and Climate Protection Committee Meeting:
Introduction to the Budget Process
Presentation transcript:

KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS January 2018 Kouga Dam

Churchill Dam at 18.9% of full capacity on 5 Feb 2018 KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Churchill Dam at 18.9% of full capacity on 5 Feb 2018

KOUGA LOCAL MUNICIPALITY LOCATED WITHIN THE SARAH BAARTMAN DISTRICT MUNICIPALITY

Patensie – Historical Statistics KOUGA LOCAL MUNICIPALITY RAINFALL PREDICTION FOR GAMTOOS CATCHMENT Patensie – Historical Statistics Summary of number of days between 50 mm events Average 428 Maximum 2293 (29-Nov-55 to 10-Mar-62) Last Event 1-Sept-15

KOUGA LOCAL MUNICIPALITY RAINFALL PREDICTION FOR GAMTOOS CATCHMENT The forecast period ends in June 2018 and up until then the rainfall will be normal to below normal.

Drought Intervention Measures - Methodology KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Drought Intervention Measures - Methodology

KOUGA LOCAL MUNICIPALITY DROUGHT CONDITIONS – STATUS QUO Western part of EC in the grip of a severe drought – worst drought in 100 years Kouga was declared a drought disaster area in May 2017 Water level in Kouga Dam dropped to lowest level ever (7.1%) Day Zero for Hankey & Patensie: 31 March 2018

KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Intergovernmental liaison Member of Algoa Water Supply System (AWSS) Restrictions Monitoring Committee – Monthly with DWS and By-weekly with NMBM Participated in drought intervention w/shop hosted by SBDM and attended by Disaster Management Teams (Provincial & National) on 22 Sept 2017 Stakeholder: DWS AWSS Reconciliation Study - Quarterly Met with Gamtoos Irrigation Board (DWS Implementing Agency) on 30 January 2018 Met with DWS officials on 31 January 2018

KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Challenges experienced Lack of funding by DWS (ACIP & RRU Programmes have been terminated) CoGTA only declared a Provincial Disaster in December 2017 Drought intervention Business Plan submitted by SBDM to CoGTA in July 2017 has not been approved Three local authorities are dependent on water from the Kouga River Catchment Two local authorities are dependent on water from the Kromme River Catchment No RBIG funding from DWS for Kouga projects

KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Achievements to date Funds from capital projects (R21m) diverted to drought intervention initiatives PSP & Contractor appointed for groundwater development Five new production boreholes drilled since November 2017 (Oyster Bay & Jeffrey’s Bay) An emergency action plan for Hankey & Patensie (to avoid Day Zero) has been drafted and workshopped with the GIB and DWS (to obtain their input) Several short, medium and long term strategies for the Kouga area have been included in the SBDM Drought Intervention Business Plan Level C water restrictions are being enforced

Proposed Intervention Measures – short term KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Proposed Intervention Measures – short term

Proposed Intervention Measures – medium/long term KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS Proposed Intervention Measures – medium/long term

Proposed Intervention Measures – Hankey & Patensie KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS

Community Drought Information Sessions KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS

KOUGA LOCAL MUNICIPALITY DROUGHT CRISIS QUESTIONS