Coordination by E. B. Holzer & J. Wenninger Production

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Wednesday September 14th
Friday 30th September 06:00 Operator dump fill #2171, int. lumi about 75 pb-1 Previous operator dump from physics was on 14 September ! 07:00 Start of.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC – Progress with Beam
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
Week 32 Started with luminosity production…
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Summary week 36 Coordination by B. Holzer & J. Wenninger
Overview LHC Operation Week 47
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Fri 29/7 – Sat 30/7 09:00 End of fill 1990, PC trip RCBXV3.R1 (likely SEU on QPS). Integrated Luminosity: 41 pb-1. Access for MKI2 main switch replacement.
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Friday 31st August & night
Mike Lamont, Jorg Wenninger
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Thursday :00: Physics fill from the night shift
Finally.... We had to wait a long time.... We had many problems....
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday 22 September 2011.
Saturday :42 stable beams fill 3541
Monday :15 fill 3523 dumped by BPMs IP6
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Tuesday In the morning test cycle with probe for Q’ measurement.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Tuesday 20 September 2011.
LHC Status Fro Morning 9-Sep
Thursday 30th September De-bunching test
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Monday 27th August & night
Wednesday 26 October 2011.
Wednesday morning / afternoon
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Tuesday
Presentation transcript:

Coordination by E. B. Holzer & J. Wenninger Production Summary week 38 Coordination by E. B. Holzer & J. Wenninger Production

Stable beam periods No major break-downs, but average time between fills increased by many small problems.. Luminosity drop due to a/ intensity, b/ emittance. 3.5x1033 Ib ~1.2E11 Ib ~1.25E11 Ib ~1.3E11 Vac Pt2 Power Cut Booster Mon Tue Wed Thu Fri Sat Sun 12/7/2018 LHC 8:30 meeting

Stable beams fill list – 15 fills L (1033 cm-2s-1) Length (h) Int. L (pb-1) Dump cause 2124 3.2 9.5 78 QPS Q7L5 2126 0.3 3 RF B1 arc detection 2127 3.3 1 7 QPS QTL11.R7B2 2129 10.5 B1 RF trip 2135 2.6 10 70 QPS S45 2138 2.9 6.5 53 QPS on RSD/F A12B1 2140 3.0 6 50 QPS on RCBXH3.L2 2143 2.8 0.2 Vacuum P8, TCTV BLMs 2144 2 20 QPS on RQX.L1 – IT CRYO lost 2147 4.5 37 QPS on RCBXH2.L1 2150 38 nQPS S45 2151 2.7 LBDS BETS MKB 2152 2.2 SUE T sensor S45 2155 0.5 RQT13.R5B1 PC 2156 12.5 91 QPS on RQX.R1 – IT CRYO lost 12/7/2018 LHC 8:30 meeting

Statistics Integrated luminosity: 556 pb-1 Best week for CMS 493 pb-1 Per fill 37 pb-1 Best week for CMS 493 pb-1 Best week for ATLAS 515 pb-1 In stable beams: 70 h / 176 h ~ 40% 9/15 dumps in stable beams from QPS. ~ 1 every 60 pb-1 ~2/3 dumps related to SEEs. 12/7/2018 LHC 8:30 meeting

Peak luminosity Reflects lower intensity (vac.) and then larger emittances. Last fills missing. 12/7/2018 LHC 8:30 meeting

Integrated L > 920 pb-1 LHCb ~3.6 fb-1 ATLAS/CMS Slope ~ 0.45 fb-1/week Last fill missing ! Slope ~ 50-60 pb-1/week 12/7/2018 LHC 8:30 meeting

A bit of extrapolation Assuming that we get 3 ½ more good weeks + 1+ week for 90 m, floating MD etc We can reach 5 fb-1 for ATLAS/CMS, > 1 fb-1 for LHCb 12/7/2018 LHC 8:30 meeting

Injection ‘(Poor) Business as usual’ : Many line re-adjustments. Flipping back and forth between good and bad within the same day – quite some frustration ! When the SPS LSS6 MSE is in ‘bad mood’ – pray ! Last Wednesday rMPP agreed to the proposal to open TCDI from 4.5 to 5 sigma. Waiting for decision to be put into practice. The sooner – the better ! 12/7/2018 LHC 8:30 meeting

Vacuum – the return of the spikes Wednesday night: large spikes at injection leading to beam dump triggers from vac. valves. Dropped intensity to 1.2E11/b for 1 ½ days. Thursday+: large spikes in IR8 leading to a beam dump on TCTVs in stable beams. Spiky vacuum on Pt8 again… In long fill pressure in TDI region increasing steadily. Try again to open TDI further? Situation has stabilized, but vacuum spikes appear from time to time – to be watched. 12/7/2018 LHC 8:30 meeting

Vacuum IR2 during the night TueWed 12/7/2018 LHC 8:30 meeting

Emittances When the bunch was increased again on Friday, the luminosity performance degraded. Diagnostics is made difficult by the absence of systematic emittance logging (and of reliable measurements) along the chain. BSRT relative measurements seem to confirm larger emittances on flat top. Sunday morning booster crew re-adjusted the beams. Luminosities jumped back up to earlier values. Needs follow up… 12/7/2018 LHC 8:30 meeting

Abort gap Tuesday afternoon a problem on the klystron control (polar) loop induced longitudinal noise on the beam. This lead to a record (?) abort gap population slightly above 1.2E11 p. Triggered an effort to make abort gap cleaning operational at 3.5 TeV. Settings prepared, tasks in sequencer (since Friday). Some final changes to be done. Then ready for test with a batch of 144b and 12b on either side of the abort gap. 12/7/2018 LHC 8:30 meeting

Abort gap population Why was B2 affected? 1.2E11 BSRA B1 BSRA B2 12/7/2018 LHC 8:30 meeting

Tune FB 2 fills lost in squeeze on QFB due to poor signals. Once Q dragged onto 1/3 resonance. Once the usual RQTF/D trip. Recommendation is to switch off QFB (or leave it off if switched off by itself) when Q signal poor. Watch out B2  see below. Check tunes before going into collisions and correct if necessary. Same recommendation in case lifetime in collision seems low. B2 issue: The orbit FB is pushing the B2 H CODs systematically  leads to a dp/p shift and a Q shift via natural Q’. Check/correct tunes if FB was off. 12/7/2018 LHC 8:30 meeting

B2 horizontal correctors syst. shifts  lower energy B2 tune B2 horizontal correctors syst. shifts  lower energy 12/7/2018 LHC 8:30 meeting

Miscellaneous RF limitations on intensity lifted by RF group. Klystron power issue on 5B2 solved. Power on FT now ~160 kW instead of 200 kW. Fine-tuning of the regulation of the ferrite current with temperature and fine-adjustment of the cavity tune. ALFA in beam during 2 fills at 25 mm (after approval by rMPP). Interlock limits set to 20 mm. TOTEM settings and interlocks ready. The setting of one H RP was shifted by 0.1 mm away from the beam wrt agreed setting to be consistent with the loss map situation. The warning limit was not set correctly – not changed. 12/7/2018 LHC 8:30 meeting

ALICE ALICE luminosity showed erratic behavior Wed-Thu. Adjustments or leveling impossible. According to ALICE this is due to parasitic-parasitic collision (from their timing). LDM checks did not confirm this hypothesis. Parasitic bunches at the level of 0.1-0.5%. Problem has disappeared… 12/7/2018 LHC 8:30 meeting

This week Production. Electrical network reconfiguration? Abort gap cleaning test at 3.5 TeV - Tuesday? Special filling – 1 shift. 90 m optics – Friday-Saturday To be done: incorporation of changes from ALICE pol. reversal. Machine settings – no problem expected. Collimator settings & interlocks – quite some work here ! Coordination : M. Lamont and J. Uythoven 12/7/2018 LHC 8:30 meeting