Calorimeter calibrations with Flight Software.

Slides:



Advertisements
Similar presentations
Online Monitoring and plane checkout Online monitoring is used at the mine for: –sanity checks - “is everything working” –diagnostics - rates, hot/dead.
Advertisements

Reunion de groupe 29 oct. 2002G. Bernardi, LPNHE- Paris Reunion D0 Paris Programme de travail pour Calib On-line Prochaines etapes des etudes sur le bruit.
Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
SVACInstrument Analysis Meeting, October 7, 2005 Anders W. Borgland 1 CAL Calibrations And High Energy Muon Gain Anders W. Borgland Science Verification,
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
A.Chekhtman1 GLAST LAT ProjectCalibration and Analysis group meeting, April, 3, 2006 CAL on-orbit calibration with protons. Alexandre Chekhtman NRL/GMU.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, July 28, 2006 Calibration of high energy diode. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, June, 24, 2005 CAL retriggering study with SLAC data. Alexandre Chekhtman NRL/GMU Gamma-ray.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Project Software vrvs meeting X. Chen 1 GLAST LAT Project Software vrvs meeting X. Chen 1 Analyses of Muon Calibration Data Xin Chen.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, January, 20, 2006 Status of calorimeter calibration. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
A.Chekhtman1 GLAST LAT ProjectCAL Recon rewriting meeting, May, 11, 2005 In what cases we need external position estimation ? Alexandre Chekhtman NRL/GMU.
Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.
VELO ADC vs Charge Calibration Jianchun Wang April 16, 2008 This is an update to the presentation at April 11 st VELO Group Meeting. A new scan data of.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST Large Area Telescope Engineering Meeting 23 November 2004 Charge Injection Calibration James Swain Stanford Linear Accelerator Center
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
HCAL1 Status 2003 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance 2003 General design High Voltage system LED monitoring 2. Tests in muon halo beam.
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
GLAST LAT ProjectInstrument Analysis Workshop, June 2004 J. Eric Grove Naval Research Lab Washington DC Gamma-ray Large Area Space Telescope CAL Detector.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
A.Chekhtman1 GLAST LAT ProjectBeam test meeting, September 27, 2006 CsI afterglow - possible explaination of pedestal drift and excess of energy. Alexandre.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
A.Chekhtman1 GLAST LAT ProjectInstrument Analysis meeting, February, 27, 2006 CAL features and idiosyncrasies. Alexandre Chekhtman NRL/GMU Gamma-ray Large.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
1 A first look at the KEK tracker data with G4MICE Malcolm Ellis 2 nd December 2005.
GLAST Calorimeter Crystal Position Measurement Zach Fewtrell, NRL/Praxis GLAST Integration & Test Workshop SLAC July 14, 2005.
DØ Calorimeter Software Meeting April 26, Leslie Groer Columbia UniversityCalorimeter Online Software Status + Needs 1  Examines  Crate Unpacking.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
DØ Algorithms Meeting April 6, Leslie Groer, Columbia Univ Ursula Bassler, LPNHE, ParisCalorimeter Online Software Status 1  Examines  Crate Unpacking.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
Status of MAPMT FEE Electronics Boards Connector board – have 5 boards, 1 assembled Readout board (“MUX” board) – layout completed 12/2, but unfortunately.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
Development of a pad interpolation algorithm using charge-sharing.
Testbeam analysis Lesya Shchutska. 2 beam telescope ECAL trigger  Prototype: short bars (3×7.35×114 mm 3 ), W absorber, 21 layer, 18 X 0  Readout: Signal.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
A.Nianin1 EMCal FEM noise study Goals: develope a mechanism to compute and store cell-dependent pedestals for zero-suppression in DSP’s; study the noise.
HCAL1 Status 2004 Oleg Gavrishchuk, JINR, Dubna 1. HCAL1 performance in 2004 General design High Voltage system LED monitoring 2. Stability in 2003 Led.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
3/06/06 CALOR 06Alexandre Zabi - Imperial College1 CMS ECAL Performance: Test Beam Results Alexandre Zabi on behalf of the CMS ECAL Group CMS ECAL.
 13 Readout Electronics A First Look 28-Jan-2004.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Rainer Stamen, Norman Gee
Calorimeter Status Electronics Installation and Commissioning
Bonn Test Station data analysis with PandaRoot
CMS Preshower: Startup procedures: Reconstruction & calibration
Single-CAL Test and Calibration
A First Look J. Pilcher 12-Mar-2004
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST LAT System Engineering
Equipment Tests for DHC Tower
Signal studies OUTLINE 1- Signal extraction
GLAST Large Area Telescope:
GLAST LAT System Engineering
GLAST Large Area Telescope
Eduardo do Couto e Silva Feb 28, 2006
Shaped Digital Readout Noise in CAL
CAL crosstalk issues and their implications
Presentation transcript:

Calorimeter calibrations with Flight Software. Gamma-ray Large Area Space Telescope Calorimeter calibrations with Flight Software. Alexandre Chekhtman NRL/GMU

Pedestals Previously pedestals were extracted from B13 runs with 4 range readout and zero suppression OFF With flight software we expected to get pedestals from standard configuration using events with 10 Hz periodic trigger Special trigger engine allows to read periodic triggers with 4 range readout and zero suppression OFF Now, due to some problem in FSW, periodic trigger is disabled Expected to be fixed in near future We use now another source of pedestals: run pedestal_ci_CPT This run collects 9000 events using solicited trigger with no charge injection for 9 different gain settings (1000 events per gain setting) Pedestal position and noise depend on gain setting Settings for low energy diode and high energy diode are different pedestals for ranges 0 and 1 (LE diode) - from events 5000-5999 Pedestals for ranges 2 and 3 (HE diode) For LAT71x (muon gain) - from events 8000-8999 For LAT701 (flight gain) – from events 7000-7999 For the moment pedestals from pedestal_ci_CPT were defined using IDL function and then merged manually May be we need to implement this procedure in calibGenCAL ?

Pedestal difference Difference of pedestals defined from B13 run 135005339 (Jan 14,2006) and from pedestal_ci_CPT run 077 002768 (Apr 11,2006) Pedestal difference in range 0 is ~3 adc unit = 0.1 MeV

Charge injection calibration Charge injection calibration with flight software works much slower (by factor of ~5) Standard columnwise charge injection run takes now 2 hours We decided to use broadcast charge injection pulse all calorimeter channels simultaneously This decreases the time and file size by factor 12 We should verify that the result of calibration stays unchanged Even with 100 Hz pulsing rate we afraid of missing events We have no information in the digi root file on the moment when DAC setting (injected charge) changes we just count events (50 events per DAC setting) If some events are lost, we have to use another way to separate events corresponding to different DAC settings Find peaks on ADC histogram ?

Missing events – run 077002764 Plot of Adc signal vs event number shows that the change of DAC setting happens exactly as expected at event =50*N So, there is NO missing events

Columnwise vs broadcast Difference between columnwise and broadcast charge injection calibration is less than 0.5% This plot produced by IDL without any protection against outpiers Peaks at some points are due to coincidence with scintillation in some events Should be suppressed by existing outlier protection in calibGenCAL

To be done next Modify calibGenCAL to work with broadcast charge injection files Zach has done it but not tested yet Process LAT71x files to get muon calibration (asym, MeVperDAC) Implement in calibGenCAL the processing of flight gain charge injection files, to get correct calibration for flight gains. Take into account LE to HE crosstalk