© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown.

Slides:



Advertisements
Similar presentations
COST CONTROL - EARNED VALUE 1.0. EARNED VALUE - INTRODUCTION
Advertisements

Project Cost Management
©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
Monitoring and Information Systems
Monitoring and Control Earned Value Management (EVM)
Project Cost Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 4 th Edition, Project Management.
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Degree and Graduation Seminar Cost Management
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Information Technology Project Management, Sixth Edition Note: See the text itself for full citations.
Project Monitoring and Control. Introduction Goal: ensuring that the project is on time and on budget and/or highlight any deviation from the plan Areas.
Gantt Charts Trisha Cummings. The History Henry Laurence Gantt's legacy to management is the Gantt chart. Henry Laurence Gantt ( ) was a mechanical.
HIT241 - COST MANAGEMENT Introduction
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Using Earned Value Management System (EVMS) Briefing for ATC Engineering & Test Division (ACT-200) Managers and Leads.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Earned Value Management
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Cost Management Week 6-7 Learning Objectives
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Earned Value Management Tutorial Module 5: EVMS Concepts and Methods Prepared by:
EARNED VALUE MANAGEMENT (EVM)
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Peg Johnson, Owner EVMS-Solutions 1 Peg Johnson
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
 Project Time Management includes the processes required to accomplish timely completion of the project  Part of Triple Constraints  Managers often.
Where Module 04 : Knowing Where the Project Is 1.
SOFTWARE PROJECT MANAGEMENT
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Title of presentation Name(s) of author / presenter / co-authors
Project Cost Management
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
Project Monitoring
Earned Value Management
Copyright All Rights Reserved by
Chapter 7: Project Cost Management
Work Packages / Deliverables Completed
Progress and Performance Measurement and Evaluation
Earned Value Management
Earned Value - What is it
An Introduction to Earned Value Performance Measurement
Implementing EV in IT A Three Step Approach John Chapman Touchstone Ltd
Project Cost Management
Earned Value Measures Planned Value (PV) Earned Value (EV)
Earned Value Management
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Project Cost Management
Managing Project Work, Scope, Schedules, and Cost
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

© 2011 All Rights Reserved APM Heathrow Branch Meeting 11 th September 2012 Practical Use of Earned Value for Real- time Forecast and Control Nick Brown ARES Corporation

© 2011 All Rights Reserved 2 What is Earned Value Management? A Collection of management practices that are used to establish and maintain a performance measurement baseline from which to measure and analyze performance, identify variances to the baseline, and forecast the project outcome Effectively integrates the work scope of a project or program with the schedule and cost elements for optimum program planning and control to support project management decisions-making Uses 3 data points to determine productivity and efficiency factors Planned Value (How much as planned to get done?) Earned Value (How much was accomplished?) Actual Costs (How much did it cost?)

© 2011 All Rights Reserved BCWP: The value of the work that has been performed Often referred to as: EV, BCWP, Earned Budget EV = BAC * Percent Complete Note: no reference to Actual Costs spent % Complete and the Budget of work are the inputs to determine Earned Value % Complete is synonymous with Progress –Typical question is How much progress have we made? Lets Talk about Earned Value 3

© 2011 All Rights Reserved Earned Value – the hard part The difficult task is OBJECTIVELY assessing the realistic % Complete - How much work has been completed compared to how much work is remaining to complete? Important:Assessing Accurate Consistency is important (well talk about that shortly) Consistent EV practice reduces subjectivity on progress 4

© 2011 All Rights Reserved Objectively Assessing % Complete Understand the work scope Engineering Tasks/Deliverables (drawings, specs, plans, etc.) Construction tasks Indirect Cost tasks Procurement deliverables Firm Fixed Price contract pay items Research and Development tasks Information Technology Tasks Requires some experience factor to establish Subject Matter Expert Company documented Standards (Engineering Standard)

© 2011 All Rights Reserved 6 Several methods for objectively assessing progress Discrete Effort 0% - 100% -Either 0% or 100%, no in between values 50/50 rule -50% when start, 100% when completed Quantity based -Quantity installed / Quantity EAC Milestones-Weighted Progress Milestones Mgmt Assessment-SMEs educated guess (a little subjectivity) Apportioned Effort -% based on progress of other tasks Level of Effort (LOE) -Planned = earned Being consistent and having documented rules of earning is important Some Standard Rules of Earning

© 2011 All Rights Reserved Choosing the Right Rules Short duration activities (<1d to 5d) ; Rule Activity is typically done before the next progress update Mid duration activities (5d – 30d) Based on Quantity Weighted Milestones Long Duration Activities (>30d) Based on Quantity Weighted Milestones Apportioned Effort LOE (try to focus <20% of budget)

© 2011 All Rights Reserved Rules of Earning Paired to Task Engineering Tasks Can be both short and long duration activities ; Rule Weighted Milestones

© 2011 All Rights Reserved Rules of Earning Paired to Task Construction Tasks Typically short duration activities ; Rule Weighted Milestones Quantity Installed Indirect Costs Apportioned Effort Progress is based on the progress of other tasks (e.g. Construction Management activities, Utilities, Project Management LOE Good for fixed duration activities that have little chance of schedule delays

© 2011 All Rights Reserved Rules of Earning Paired to Task Procurements Weighted Milestones Long Lead Procurements (typically identified in PO) (payment when delivered) Indirect Costs Apportioned Effort Progress is based on the progress of other tasks (e.g. Construction Management activities, Utilities, Project Management LOE Good for fixed duration activities that have little chance of schedule delays

© 2011 All Rights Reserved Rules of Earning Paired to Task Research and Development Projects Nature of work has typically not been performed before SME develops accomplishment and WBS Weighted Milestones (SME must develop as part of the work plan) Managements Assessment of % complete Information Technology Projects Weighted Milestones SME develops accomplishment and WBS Weighted Milestones based on deliverable (documents, testing, signoffs, etc)

© 2011 All Rights Reserved Cost Processors Rules of Earning

© 2011 All Rights Reserved The 4 Key Elements of EVM Four data points Budget at Complete (BAC) Total Budget of the Work task Planned Value (PV, BCWS, Scheduled Budget) When budget (£, Hrs, Qty) is linked to schedule, value of the work to be performed, over time, can be measured. Usually measured by reporting period or To-Date Earned Value (EV, BCWP, Earned Budget) After % complete is determined, multiply by BAC to derive EV which generates the work accomplished Actual Costs (AC, ACWP) Actual costs incurred (including Accruals)

© 2011 All Rights Reserved Efficiency and Productivity Using BCWS, BCWP, ACWP, the following performance values can be derived (£, Hrs, Qty) SV - Schedule Variance is the value of work accomplishment versus the value of work planned (BCWP – BCWS). CV - Cost Variance is the value of work accomplishment versus the actual cost to perform the same work (BCWP – ACWP). SPI - Schedule Performance Index is the schedule efficiency. It represents the ratio of work value performed vs. the work value planned. (BCWP/BCWS). CPI - Cost Performance Index is the cost efficiency. It represents the ratio of the value of work performed, to the actual cost to perform the work (BCWP/ACWP).

© 2011 All Rights Reserved EV Basics Some Basics about SV and CV Negative values indicate behind schedule / behind costs Positive values indicate the opposite Usually set to thresholds for variance analysis reporting Does not replace a critical path analysis of key schedule dates By itself does not indicate project is going to miss their dates Based on the Early Dates of a schedule, doesnt evaluate float Some Basics about SPI and CPI –Stated as a ration where 1.0 is even (on schedule/on cost) –Less than 1.0 indicates trending behind schedule –Above 1.0 indicates trending ahead of schedule

© 2011 All Rights Reserved 16 Estimate at Completion (EAC) Total anticipated cost of the project Estimate to Complete (ETC) Total anticipated cost of the remaining work of the project Simple equations are: EAC = Actuals + ETC EAC – Actuals = ETC Many more equations are available Variance at Completion (VAC) EAC-BAC=VAC Forecasting

© 2011 All Rights Reserved 17 EAC calculations aid in determining the EAC Some methods work better at different phases of the job Different methods provide for worst case, best case, and most likely EACs There is no one correct answer until all true costs of the job have been incurred. Use the best information available to predict the EAC Determining the EAC

© 2011 All Rights Reserved 18 Calculations can give an indication but many factors contribute to making a final decision on the EAC Procurements costs not hitting at the time expected Temporary shifting of resources Performance trends Changes to the scope Changes in key resources EAC determination must consider all these factors Determining the EAC

© 2011 All Rights Reserved EAC Calculation Methods Independent EAC (i-EAC) BAC / CPI cum Which also equals Actuals / % Complete £1,000 / 0.63 = £1587 Basic Actuals cum + (BAC - EV cum ) £900 + (£ £600) = £1300 Composite Actuals cum + ((BAC - EV cum ) / (CPI cum + SPI cum )) £900 + ((£ £500) / ( )) = £ Month Ave Actuals cum + ((BAC - EV cum ) / CPI 3 )) £900 + ((£ £500) / 0.63)) = £1693 Determining the EAC (cont)

© 2011 All Rights Reserved 20 We need to be able to answer the follow question….. How well do we have to perform to get back on track? T-CPI (BAC - EV cum ) / (EAC – Actuals cum ) (£ £500) / (£ £800) = 1.25 £1.25 of work has to be completed for every dollar spent Different derivatives of this calculation can be used to include focus on schedule performance, cost performance and the specific phase of the project One Last Bit of Data

© 2011 All Rights Reserved Benefits of using Earned Value Proven to reduce the risk of unforeseen cost increases Focuses on true work completed Early Warning System Course corrections are easier to make when you have time to make small adjustments If react too late, there may be costly risks and schedule delays incurred Management by Exception Focus on the areas that have performance issues and need management attention

© 2011 All Rights Reserved Benefits Continued Provides reliable data and predictive data Only caution is the 1 st 15% and last 15% of a project The cumulative cost performance index (CPI) provides an early warning signal. The schedule performance index provides an early warning signal. The CPI is a predictor of the final cost of the project. EVM uses an index-based method to forecast the final cost of the project, less guessing The "to-complete" performance index allows evaluation of the forecasted final cost. The periodic (e.g., weekly or monthly) CPI is a benchmark.

© 2011 All Rights Reserved With Earned Value Performance 23 Planned Actual In £1,000s Budget at Completion (BAC) Months Target Completion Date BCWS = £500K : Data Date BCWP = £300K ACWP = £400K Current Completion Date Probable Schedule Delay = 4 weeks Probable Cost Overrun = £300K Estimate at Completion (EAC) Cost Variance -£100K Schedule Variance (Time) - 4 wks Schedule Variance (£) -£200K Earned Typical EV Performance Graph

© 2011 All Rights Reserved 24 Typical EV Performance Report

Thank you

© 2011 All Rights Reserved PRISM G2 Modules Materials