Virgo Update – LSC meeting

Slides:



Advertisements
Similar presentations
19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Advertisements

The GEO 600 Detector Andreas Freise and the GEO 600 Team University of Hannover May 20, 2002.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
1 Virgo commissioning status M.Barsuglia LAL Orsay.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
LIGO-G M Status of LIGO Barry Barish PAC Meeting Caltech 3-June-04 Upper limits on known pulsar ellipticities.
COMMISSIONING PROGRESS G.LOSURDO – INFN Firenze for the Virgo Collaboration.
Virgo Control Noise Reduction
Status of Virgo Gabriele Vajente INFN Pisa and Scuola Normale Superiore di Pisa On behalf of the Virgo Collaboration 11 th Gravitational Wave Data Analysis.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
The status of Giovanni Losurdo - INFN Firenze-Urbino on behalf of the Virgo Collaboration Workshop on GW detection– Gingin, Oct. 4-7, 2005.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Advanced VIRGO WG1: Status VIRGO, Cascina Andreas Freise University of Birmingham.
Status of LIGO Data Analysis Gabriela González Department of Physics and Astronomy Louisiana State University for the LIGO Scientific Collaboration Dec.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
G Amaldi Meeting 2015, Gwangju, South Korea1 Status of LIGO June 22, 2015 Daniel Sigg LIGO Hanford Observatory (on behalf of the LIGO Scientific.
Novemebr 5, 2006LSC meeting1 Virgo Update Prospects on detector performance and running schedules B. Mours.
Status of Virgo A. Viceré INFN-Firenze – Università di Urbino.
LIGO- G D The LIGO Instruments Stan Whitcomb NSB Meeting LIGO Livingston Observatory 4 February 2004.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
LIGO-G M Major International Collaboration in Advanced LIGO R&D Gary Sanders NSF Operations Review Hanford February, 2001.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006.
January 12, 2006ILIAS-WG3 Frascati1 Virgo+ & Advanced Virgo B. Mours With material from G. Losurdo, M. Punturo, A. Viceré and others.
LIGO-G D What can we Expect for the “Upper Limit” Run Stan Whitcomb LSC Meeting 13 August 2001 LIGO Hanford Observatory A Personal Reading of.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Status of the Advanced LIGO PSL development LSC Virgo meeting, Caltech, March 2008 LIGO G Z Benno Willke for the PSL team.
LIGO- G Z August 16, 2006August 2006 LSC Meeting - DetChar 1 Spectral Line Working Group Report Keith Thorne, Chair.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 LESSONS FROM VIRGO+ May 17th 2010 E. Calloni for the Virgo collaboration.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
WG3 Report Michele Punturo Harald Lück. WG3 composition Co-Chairmen M.Punturo INFN Perugia, Italy H.Lück MPI für Gravitationsphysik, AEI, Hannover, Germany.
LIGO- G D E7: An Instrument-builder’s Perspective Stan Whitcomb LIGO Caltech LSC Meeting Upper Limits Plenary Session 22 May 2002 LIGO Livingston.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
International Gravitational Wave Network 11/9/2008 Building an Stefan Ballmer, for the LIGO / VIRGO Scientific Collaboration LIGO G
LIGO-G M LIGO Status Gary Sanders GWIC Meeting Perth July 2001.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
LIGO-G D Commissioning at Hanford Stan Whitcomb Program Advisory Committee 12 December 2000 LIGO Livingston Observatory.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
LIGO-G M Overview of the LIGO Continuing Operations (FY FY2006) Proposal Gary Sanders LIGO PAC9 Meeting December 2000.
Monica VarvellaIEEE - GW Workshop Roma, October 21, M.Varvella Virgo LAL Orsay / LIGO CalTech Time-domain model for AdvLIGO Interferometer Gravitational.
Advanced Towards Advanced Virgo Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator on behalf of the Virgo Collaboration.
1 The status of VIRGO E. Tournefier LAPP(Annecy)-IN2P3-CNRS Journées SF2A, Strasbourg 27 juin – 1er juillet 2005 The VIRGO experiment The commissioning.
Edwige Tournefier for the Virgo Collaboration The status of Virgo.
Virgo Status Detector Status Computing Data Analysis status and Plans
Evolution of the Virgo detector: The Virgo+ plans
Status of Virgo GWDAW Dec 13-16
Alignment status & plans
Installation and Commissioning Status Stan Whitcomb
Signal recycling R&D at LAL: Influence in Virgo
Virgo Update B. Mours LIGO-G Z August 15, 2006 LSC meeting.
Jim Hough for the GEO collaboration
Stan Whitcomb LSC meeting Hanford 15 August 2005
LIGO Interferometry CLEO/QELS Joint Symposium on Gravitational Wave Detection, Baltimore, May 24, 2005 Daniel Sigg.
Improving LIGO’s stability and sensitivity: commissioning examples
The Next Generation: Advanced LIGO
Lessons Learned from Commissioning of Advanced Detectors
Status at the Prague meeting
Advanced Virgo ISC subsystem
Presentation transcript:

Virgo Update – LSC meeting News from Virgo B. Mours LIGO-G050444-00-Z August 15, 2005 Virgo Update – LSC meeting

Virgo Update – LSC meeting Virgo Recent Progress First lock in recycled configuration: October 2004 C5 run: December 2004; Recycled and “Recombined” modes 2005 Commissioning activities: Alignment: Drift controls using wavefront sensing now on all d.o.f. Automation Control upgrades, robustness (“jumps”), Noise hunting Summer shutdown preparation New “injection” (bench, PR mirror, ISYS alignment) Data analysis preparation Study C-run data Collaborative data analysis (LIGO-Virgo, Bar-Virgo) August 15, 2005 Virgo Update – LSC meeting

Sensitivity evolution August 15, 2005 Virgo Update – LSC meeting

Virgo Update – LSC meeting C6 run July 29 – August 13 Duty cycles: Locking: 89% Science mode: 86% August 15, 2005 Virgo Update – LSC meeting

Virgo compared to LIGO-S2 August 15, 2005 Virgo Update – LSC meeting

Virgo Update – LSC meeting Next steps Sept-Dec 05: “Injection” shutdown 2-3 months of work New injection bench;  Power should goes up by a factor 10 New recycled mirror:  Better controls Miscellaneous changes Followed by the new injection system commissioning 2006: Commissioning + some commissioning runs Alignment, controls,… A science run by the end of 2006 (coincidence with LIGO-S5) ? 2007 Observation/Commissioning/Upgrade time 2008-9: Virgo + 50W laser, New electronic, New mirrors ? (not yet decided) 2011(?): Advanced Virgo 200W laser? New beam geometry? New mirrors?... August 15, 2005 Virgo Update – LSC meeting