Spanish PRBs Activities on Reporting CIS phase 2 (2005/2006) WG D

Slides:



Advertisements
Similar presentations
Spanish PRBs Activities on Reporting CIS phase 2 (2005/2006) WG D DUERO & EBRO River Basin Authorities Stresa, Italy, March 7-8 th 2006.
Advertisements

Wrap up and next steps. Remit of Water Forum To enable stakeholders to engage & influence statutory authorities in implementation of WFD To help ensure.
Development of partnership on groundwater issues between the EU and non EU countries of the Mediterranean region Development of partnership on groundwater.
EU Project: Trans-Boundary River Management Phase II for the Kura River basin – Armenia, Georgia, Azerbaijan
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
Component 5.2 Harald Marent, Veronika Koller-Kreimel, Austrian Ministry for Agriculture, Forestry, Environment and Water Management Edith Hödl-Kreuzbauer,
EU Project: Trans-Boundary River Management Phase II and Phase III for the Kura River basin – Armenia, Georgia, Azerbaijan ( Transboundary.
Water.europa.eu CIS Activity on CC & Water Guidance ‘river basin management in a changing climate’ SCG meeting 04/05 November 2009 Marieke van Nood/Balazs.
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
DG Environment, Unit D.2 Marine Environment and Water Industry
Draft Mandate Johannes Grath Balázs Horvath (DG Env)
European Commission DG Environment
Project Coordination Group (PCG) for the implementation of the MSFD
New Work Programme and mandates 2005/2006
WG 2.B Integrated River Basin Management
WG 2.B Integrated River Basin Management
State of Implementation of CEA in Germany
Proposed CIS Workshop on WFD Economic Issues
CIS-Workshop on River Basin Management Plans
Meeting of Working Group Data & Information Sharing (DIS)
WG PoM and Natural water Retention Measures
Agenda item 12.3 – Transboundary river basin management
Water directors meeting London November WGB- State of Play
JRC-Institute for Environment and Sustainability
WFD key issues and research needs Follow up – WISE-RTD
CIS-Workshop on River Basin Management Plans 8 and 9 May 2006 Bonn
DIKE Meeting 14/02/2018 Action points.
Article 13 RBMP reporting testing 2009
GUIDANCE ON PLANNING PROCESS GUIDANCE ON PLANNING PROCESS
Draft Work programme / revised mandate for WG F
Natural water Retention Measures
Outcome of 2^ Seminar of the WG 2.7 Roma, January
Draft Mandate and Proposed Approach for the Drafting Group on
Agenda Item 10: Feedback on dangerous substances workshop and Implementation Guidance WG-E(1)-07/04/INERIS - Implementation guidance.
Harmoni-CA initiative
Harmoni-CA initiative
WG 2.B Integrated River Basin Management
Research as a new activity of the CIS WG 2B
DROUGHT MANAGEMENT PLANS IN SPAIN Drought indicators Rome, 7 Dicember 2006 Teodoro Estrela Deputy Water Director Spanish Ministry of Environment.
WG 2.B Integrated River Basin Management
WFD and Hydro-morphology
EEAs assessments of the status of Europe’s waters
Directive 2007/60/EC Draft concept paper on reporting and compliance checking for the Floods Directive.
Water Directors’ Meeting Working Group D (Reporting) activities
Conclusions – Next steps
EU Water Framework Directive
Ghent Workshop 4/5 October 2004
Water scarcity and droughts Expert Network Progress Report
WG 2.9 Best Practices in River Basin Planning
Integrated Testing in Pilot River Basins
Working Group D Reporting
Lessons learned from WFD reporting and follow-up
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Assessment of WFD River Basin Management Plans State of Play
Item 11. Overview of EG activities
WG Integrated Testing in Pilot River Basins
Compliance checking of RBMP An inventory of questions
European Commission activities
Agenda item 2.1 – Overall Progress Report
WG 2.9 Best Practices in River Basin Planning
PRB PHASE II STRESA 7-8th MARCH 2006 Marne River Basin (France)
Water Information System for Europe
Guidance Document - Generic Outline
Concept paper on the assessment of WFD River Basin Management Plans
Brussels, 4 April, 2014 – WG Water Accounts
Scope and Outline of Policy Document
WFD Expert Group on agriculture A new mandate for
Final Version (after MS revision)
Workshop WFD and Hydromorphology Brussels, June 2012
Horizontal Guidance on Wetlands Brussels, 5th May
Presentation transcript:

Spanish PRBs Activities on Reporting CIS phase 2 (2005/2006) WG D DUERO & EBRO River Basin Authorities Stresa, Italy, March 7-8th 2006

CONTENTS: Pilot River Basin. Phase II activities. DUERO & EBRO PRBs INTRODUCTION: DUERO AND EBRO RIVER BASINS ACTIVITIES PERFORMED DURING 2005 THE SPANISH STRATEGY FOR 2010 PROPOSALS FOR IMPROVEMENT

INTRODUCTION: DUERO and EBRO RIVER BASINS Pilot River Basin. Phase II activities. DUERO & EBRO PRBs INTRODUCTION: DUERO and EBRO RIVER BASINS

ACTIVITIES PERFORMED DURING 2005: Pilot River Basin. Phase II activities. DUERO & EBRO PRBs ACTIVITIES PERFORMED DURING 2005: Attendance to meetings and workshops Mirror activities to the other Spanish river basins Review and comment on Commission Documents Checking of the WISE tools to help in the reporting process

<<Access>> Pilot River Basin. Phase II activities. DUERO & EBRO PRBs ACTIVITIES PERFORMED DURING 2005: WISE DMA-MMA .xml .shp Access Tool Presiones Lagos Red fluvial Protected areas Water bodies <<Access>> MMA2WISE

THE SPANISH STRATEGY FOR 2006: Pilot River Basin. Phase II activities. DUERO & EBRO PRBs THE SPANISH STRATEGY FOR 2006: Contribution to draft guidance documents for transmission of data gathered under WFD Checking of GIS and WISE tools made for EC, with the target of helping in the reporting process Preparation of a national project to assure the reporting to WISE according to INSPIRE principles

Other River Basin Autorities Pilot River Basin. Phase II activities. DUERO & EBRO PRBs THE SPANISH STRATEGY FOR 2010. OBJECTIVES 2006-2007 2007-2008 Visualization Search Catalog Other services Other needs WFD-Ebro SDI-Ebro SDI-MMA WFD-MMA WISE DUERO Other River Basin Autorities General Public GIS-Ebro Interoperating systems according to INSPIRE. www.idee.es

THE SPANISH STRATEGY FOR 2006. ACTIVITIES Pilot River Basin. Phase II activities. DUERO & EBRO PRBs THE SPANISH STRATEGY FOR 2006. ACTIVITIES Research on the information systems in the Spanish Water Authorities Creation of the WFD-MMA and SDI-MMA information system Filling WFD-MMA with the data from Spanish River Basins Creation of a list of recommendations for interoperability with other information Systems from the several Spanish River Basins Reporting to WISE of the reports up to 2007

PROPOSALS FOR IMPROVEMENT: Pilot River Basin. Phase II activities. DUERO & EBRO PRBs PROPOSALS FOR IMPROVEMENT: As an idea for improvement, an output of this meetings could be the creation of SMALL GROUPS for SPECIFIC TOPICS, such as: Reporting Guidance for the RBMP Interoperation between WISE and SDI nodes

Pilot River Basin. Phase II activities. DUERO & EBRO PRBs Javier Fernández, Duero River Basin Authority Marta Morén, Ministry of Environment Miguel A. Bordas, Ministry of Environment Miguel A. García, Zeta – Amaltea Consultancy Raquel Miguel, University of Saragossa Teodoro Estrela, Ministry of Environment Teresa Carceller, Ebro River Basin Authority Víctor M. Arqued, Duero River Basin Authority oph@chduero.es Thank you