Resource groups 07.12.2018.

Slides:



Advertisements
Similar presentations
The Production Process
Advertisements

13 APS. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
16 Cost sheet. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
WEB Apps Product Info. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Parallel resources. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved.
Templates. © beas2009 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way.
Event control. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Kaba B-Net terminal Functionality. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents.
19 Data import. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
Inventory. © beas2009/Page 2 This documentation and training is provided to you by beas gmbh. The documents are neither approved nor in any way acknowledged.
Resource groups. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
17 Personnel Time Recording A Tutorial for Advisers/Key Users.
Variants with be.as script. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither.
09 Calculation. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor.
08 MRP. © beas group 2011 / Page 2 This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any.
 Tata consultancy services Production Planning WORK CENTERS.
 TATA CONSULTANCY SERVICES MM - Inventory management.
Document Handling Contents: General Structure of Documents
Managing your Candidate List: Temporary Staffing
iLab Training for VUMC Departments & Users
HR Operations-2.
Project Management: Messages
Installation of virtual box
04 Master Data – Resources
MRP: Material Resource Planning
Tutorial 5: Working with Excel Tables, PivotTables, and PivotCharts
Software project mgt. session # 3– lab manual.
House Bill 2610 – 75,600 Minute School year
Intracompany Stock Transfer Scenario Overview
Web-Time Entry (WTE) Training
16 Cost sheet
22-INTEGRATION HUB
Information Marketing Group, Inc.
12a Product configurator Example and data flow
Inventory Transactions庫存交易
Factory calendar
17 Personnel Time Recording
Materials Engineering Product Data Management (ePDM)
EzyAccounting An Accounting Software An Accounting Software By: Delicate Software Solutions Dubai, Manage Your Business… Not Just Accounts.
Intracompany Stock Transfer Scenario Overview
Maintenance module Martin Heigl CTO
Introduction to Materials Management
Customization
Download Orders, Shipments, and Receipts
Version Control Master Data
13 APS
PRODUCTION PLANNING AND CONTROL
06 Master Data – Item
12 Product Configurator
09 Calculation
Agenda: Payroll Basics
07 Master Data – Tools
Software project mgt. session # 3– lab manual.
Event control
Variants with be.as script
TransCAD Vehicle Routing 2018/11/29.
External Production Daniela Narváez Quality Control
An Introduction to Premier ESS
Intracompany Stock Transfer Scenario Overview
Introduction to Scheduling Chapter 1
14 Bin location management
Scrap factors
Overview of Contract Association Batch Upload
Product Training RMA Where “Lean” principles are considered common sense and are implemented with a passion! ©2008 TTW.
Utility Billing Balancing the Accounts Receivable
Parallel resources
Attendance Management software
20 Batch transfer
and Forecasting Resources
Presentation transcript:

Resource groups 07.12.2018

This documentation and training is provided to you by beas group AG This documentation and training is provided to you by beas group AG. The documents are neither approved nor in any way acknowledged or endorsed by SAP. For SAP Business One, only the documentation and training officially released by SAP shall be binding upon SAP. SAP shall not be responsible for any content of this documentation and training and this documentation and training shall not be binding upon SAP in any way. The official current SAP Business One documentation and training for SAP Business One is available at http://service.sap.com/sbocustomer/documentation and http://service.sap.com/sbocustomer/training. 12/7/2018

Requirements for this Tutorial What you should successfully master The basics of SAP and be.as Good knowledge of general manufacturing processes and capacity scheduling Gute Kenntnisse in allgemeine Fertigungsprozesse Gute Grundkenntnisse in be.as 07.10.2009

Learning Targets After working through the lesson, you will be able to: Create resource groups Understand the differences between resource groups Schedule simple resources Set up a detailed scheduling of machine and resource groups 07.10.2009

Agenda Resources groups 1: Introduction 2: Simple resource group 3: Resource Domain 4: Machine group: detailed scheduling 07.10.2009

Resource groups General What are resource groups? A resource group is a combination of several resources. This can be machines or employees.

Resource groups Types of resource groups For different applications be.as offers several types of resource groups: A simple resource group consists of multiple machines/persons. Only the group as a whole is scheduled, there is no planning for their parts. Different resources, which are not summarized to a group for computing capacities. This is called a resource domain. A resource group whose capacity is summarized, but their parts are scheduled separately. For this group, a resource is defined, which represents this group. This is called a machine group, but it could be also a group of people. 07.12.2018

Agenda Resources groups 1: Introduction 2: Simple resource group 3: Resource Domain 4: Machine group: detailed scheduling 07.10.2009

Resource groups simple resource group A simple resource group is created as normal resource. In the Scheduling tab in column „number of mach.|pers“ the number of the single resources of this group is deposited. A further detailed division into single machines/persons is not possible. Only the group as a whole is scheduled. A shift schedule needs an ID, description and reference to a calendar. 07.12.2018

Resource groups simple resource group At scheduling you can define, how many of the single resources of this groups may be accessed. Based on the maximum of available resources, you may define a number or a percentage.

Resource groups simple resource group Creating the resource group, the capacity was registered for all days. In the scheduling calendar it is possible to enter deviant daily capacities or to change the number of available resources. For example: holiday planning of a group of persons on a assembling work station. Below the date the capacity is displayed. Deviance (example) default More (48) 32 Equal (32) Less (16)

Resource groups simple resource group Scheduling for simple resource groups Scheduling is performed to the minute. For time reservation a daily pool is used, that means, it is not checked, in which period resources are idle, but only how much spare time on that day is still available

Resource groups simple resource group Example: Ressource with 2 persons 8 hours each. Two work orders are dispatched simultaneously, start: 8:00 time required 4 hours. Multiple machine operation enabled. (in parallel on two persons). Result: They both begin at 8:00 and finish at 10:00. Reason: only the daily capacity pool is checked. 8 hours of capacity is enough for both work orders.

Resource groups simple resource group Application: Use simple resource groups if you want to work without the grafical planning table and no detailed scheduling down to the level of single machines or persons is needed. Simple resource groups allow a fast computation of the delivery date or the start date, without a scheduling to the minute the start of a maintenance sequence.

Agenda Resources groups 1: Introduction 2: Simple resource group 3: Resource Domain 4: Machine group: detailed scheduling 07.10.2009

Resource groups resource domain A resource domain is a group of resources, which are not summarized for capacity scheduling. For example a liste of resources, which are controlled by an employee. Such a domain is created as „resource group“ and each single resource is assigned to that group.

Resource groups resource domain Next, enter an group ID and the domain. Do not activate the switch „directly schedulable“. Now enter new resources and assign them to the group.

Agenda Resources groups 1: Introduction 2: Simple resource group 3: Resource Domain 4: Machine group: detailed scheduling 07.10.2009

Resource groups machine groups Each machine of a machine group is separately schedulable. This allows detailed planning. Example: 5 equivalent milling machines Approach: Create group Create associated ressources Select „directly schedulable“ Enter an ID for scheduling „with ID“. This ID is displayed in the work sequence. Usually the same like the group ID. After the ID has been entered, the resource master screen opens. There you define the resource, which is used in the work sequence.

Resource groups machine groups: detailed scheduling A resource group consists of single resources and a planning resource, which represents the resources at the moment of scheduling (eg. In pre-calculation) Machine 1 Resource group Planned resource Machine 2 Machine 3

Resource groups machine groups: detailed scheduling The planning resource represents all resources of the group: it containes the sum of all planned capacities of the group. For calculation, to the planning resource the average cost rate of the single resources must be assigned. This needs to be calculatedand entered manually. No time receipts are possible on planning resources. For confirmation, select the real single resource, on which the work was done. Machine 1 Resource group Planned resource Machine 2 Machine 3

Resource groups machine groups: detailed scheduling In the graphical view the work sequence is dispatched to the planning resource by means of rough planning (time reservation via daily pool). In the APS view, you can easily replace the planning resource by the real resource. In this example for both work sequences the same machine is selected. After a recalculation the work sequences are arranged succesively, because only one machine is available.

Resource groups machine groups: detailed scheduling Automatic optimization: For these groups automatic optimization can be activated. This is done in the resource group, select: „automatic optimization“. Now the program uses always the optimal resource. Further information : see training unit „resource optimization“

Resource groups machine groups: detailed scheduling Work order logon: If the planning resource is deposited in the work sequence, for time receipt, you need to chose the real resource first.

Resource groups machine groups: detailed scheduling Use detailed planning if you need a scheduling to the minute for each machine. This requires a very diligent data administration but allows an optimal capacity utilization, if plan figures are correct. Restriction: be.as does not offer the function to dispatch several machines of a resource group in parallel for detailed planning. Parallel dispatching is only possible for rough planning using a daily pool.

Summary You can now: Create resource groups Understand the differences between resource groups Schedule simple resources Set up a detailed scheduling of machine and resource groups 07.10.2009