FRONTAL COLLISION OF BUSES Information learned from the ECBOS Summary Report Dr MATOLCSY Mátyás Informal document No. GRSG-90-31 (90 th GRSG, 24-28 April.

Slides:



Advertisements
Similar presentations
1 Radio Maria World. 2 Postazioni Transmitter locations.
Advertisements

Números.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
/ /17 32/ / /
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
RWTÜV Fahrzeug Gmbh, Institute for Vehicle TechnologyTÜV Mitte Group 1 GRB Working Group Acceleration Pattern Results of pass-by noise measurements carried.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
STATISTICS Linear Statistical Models
Addition and Subtraction Equations
Disability status in Ethiopia in 1984, 1994 & 2007 population and housing sensus Ehete Bekele Seyoum ESA/STAT/AC.219/25.
1 When you see… Find the zeros You think…. 2 To find the zeros...
EQUS Conference - Brussels, June 16, 2011 Ambros Uchtenhagen, Michael Schaub Minimum Quality Standards in the field of Drug Demand Reduction Parallel Session.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
Summative Math Test Algebra (28%) Geometry (29%)
ASCII stands for American Standard Code for Information Interchange
Identifying money correctly 1
The 5S numbers game..
突破信息检索壁垒 -SciFinder Scholar 介绍
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Sampling in Marketing Research
Break Time Remaining 10:00.
The basics for simulations
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
Frequency Tables and Stem-and-Leaf Plots 1-3
Figure 3–1 Standard logic symbols for the inverter (ANSI/IEEE Std
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
15. Oktober Oktober Oktober 2012.
Dynamic Access Control the file server, reimagined Presented by Mark on twitter 1 contents copyright 2013 Mark Minasi.
Performance of units These slides complement the article How journal rankings can suppress interdisciplinary research. A comparison between innovation.
Progressive Aerobic Cardiovascular Endurance Run
Visual Highway Data Select a highway below... NORTH SOUTH Salisbury Southern Maryland Eastern Shore.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
2.10% more children born Die 0.2 years sooner Spend 95.53% less money on health care No class divide 60.84% less electricity 84.40% less oil.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
: 3 00.
5 minutes.
Numeracy Resources for KS2
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Chapter 8: Dialysis Providers 2014 ANNUAL DATA REPORT VOLUME 2: E ND -S TAGE R ENAL D ISEASE.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Introduction Embedded Universal Tools and Online Features 2.
úkol = A 77 B 72 C 67 D = A 77 B 72 C 67 D 79.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Proposal for amendments to UN R16: Mandatory fitting of safety-belt reminder Informal document GRSP (57th GRSP, May 2015 Agenda item 7) Submitted.
STATUS OF CRS IN BUSES AND COACHES 44TH GRSP (9-12 DECEMBER) Informal document No. GRSP (44th GRSP, December 2008, agenda item 19(b))
INTRODUCTION TO STATISTICAL STUDY OF BUS ACCIDENT ARE THE BUSES SAFE OR NOT? GRSG, 109 th session Sept. – 2. Oct Presented by Dr. MATOLCSY Mátyás.
WORKING GROUP 18 Jean-Yves LE COZ Chairman CHILD OCCUPANT SAFETY Informal document No. GRSP
CHILD OCCUPANT SAFETY WORKING GROUP 18 Jean-Yves LE COZ Chairman
Securing of children in buses and coaches
Securing of children in buses and coaches
Presentation transcript:

FRONTAL COLLISION OF BUSES Information learned from the ECBOS Summary Report Dr MATOLCSY Mátyás Informal document No. GRSG (90 th GRSG, April 2006 agenda item ) Transmitted by the expert from Hungary

GENERAL INFORMATION The accident analysis (statistics) of ECBOS project covers 5 years period: EU countries:FranceGermanyNetherlands AustriaItalySpain UKSweden Bus categories:M2, M2(above 16 passengers), M3 but not similarly in the 8 countries

GENERAL INFORMATION Types of accident: Frontal collision Frontal accident Rollover Overturning Bus runs out of road / turns off the road Side impact Rear impact Other accident Non collision accident Unknown type of accident

GENERAL INFORMATION The statistics are based on8 EU countries The whole community25 EU countries Whole Europe43 countries Contracting parties of 1958 Geneva Agreement 43 countries Contracting parties of R107 bus regulation35 countries Contracting parties of R.66 roof strength regulation32 countries

GENERAL INFORMATION Definitions used for casualties Fatalin the accident / at the scene in 1 day in 6 days in 7 days in 30 days Serious injuryhospitalized patient more than 1 day in hospital more than 3 days in hospital more than 6 days in hospital Slight injuryeveryone who needs medical treatment, but no need for hospitalization * Injury without specification used in 3 countries * note: the number of slight injuries is generally underreported in police reports, says ECBOS report

INJURY RATIOS IN FRONTAL COLLISIONS Frontal accident casualties compared to all bus accident casualties Fatalities related to all casualties in frontal accidents Frontal accidents fatalities compared to all fatalities in bus accidents Austria (1) France UK Netherlands Spain Sweden 4,1 % 71,2 % 60,0 % (2) 56,7 % (3) 9,6 % (4) 14,0 % (5) 9,2 % 7,2 % 12,7 % 62,7 % 34,0 % 83,3 % 24,5 % Germany Italy No detailed data Remarks: (1) The ratio of unknown / not specified accidents is high, 30% (2) The frontal impact is emphasized instead of frontal accident (3) On city roads; on rural roads this figure is 46,7% (4) Without frontal collisions against fixed obstacles (only against vehicles) (5) Only collisions with other vehicles are counted. Single vehicle accidents (e.g. frontal collision with rigid objects, rollover) cover 31,4% of the total casualties.

DRIVER/PASSENGER (D/P) INJURY RATE Assumptions: a) D/P injury probability (IP) in different accident situations: in frontal impact the driver has higher IP than the passenger in side impact the driver has lower IP in rear impact the driver has lower IP in rollover they have equal IP in non impact type accidents the driver has lower IP Only the frontal impact is more dangerous for the driver than for the passengers

DRIVER/PASSENGER (D/P) INJURY RATE Assumptions (cont.): b) The average passenger capacity of a bus is 50 c) The buses are fully loaded in the accident d) The IP is equal for all passengers in frontal collisions These assumptions contain simplifications, but they help to recognise general tendencies

DRIVER/PASSENGER (D/P) INJURY RATE From the ECBOS statistics D/P fatality rateD/P injury rate Austria(3/29) 0,10 5:10,08 4:1 France (16/98) 0,16 8:10,13 7:1 Germany (20/75) 0,2713:10,11 6:1 UK(6/93) 0,063:10,09 5:1 Italy(30/74) 0,4120:10,16 8:1 Netherlands(1/8) 0,12 6:10,18 9:1 Spain (24/176)0,147:10,095:1 Sweden(4/10) 0,4020:10,4020:1 Average104/5630,189:10,168:1

DRIVER/PASSENGER (D/P) INJURY RATE Comparison between ECBOS data and earlier estimations D/P fatality rateD/P serious injury rate D/P injury rate ECBOS min. value ECBOS max. value ECBOS average 3:1 20:1 9:1 4:1 20:1 8:1 Japanese data ( ) German data (1979) UK data ( ) Spanish data ( ) 80:1 8:1 5:1 6:1 13:1 10:1 4:1 2:1 All types of bus accidents are considered

DRIVER/PASSENGER (D/P) INJURY RATE Japanese data ( ) for D/P casualty rates In frontal collisions the estimated ranges for D/P casualty rates fatality(10 ~ 100) : 1 serious injury (6 ~ 20) : 1 slight injury (3 ~ 6) : 1 CasualtiesIn all bus accidentsIn frontal collisions fatality serious injury slight injury 80 : 1 13 : 1 7 : : 1 18 : 1 4 : 1

CONCLUSIONS, PROPOSALS OF THE ECBOS REPORT Use 3pt seat belt in (correct restraining of children) Develop seat regulations (R14, R80) Specify deceleration pulse for M2 vehicles Protect driver / co-driver in frontal impact Improve compatibility between buses and other vehicles

PROPOSAL OF AN EXPERT GROUP (MADRID MEETING) This table was presented in the inform.doc. GRSG Object of regulatory workRelated ECE regulation Related EU directive Responsible WG Proposed priority Estimation of needed work Strength of bus seats and their anchorages General safety of buses (all kind) External projection Safety belt anchorage Structural integrity Underrun protection Limit of deceleration Compatibility and agressivity R.80/01 R.17/04 R.10,07/Rev.1. R.61/00 R.14/05 R.16/04 R.107/Rev.1* R.93/ /676-03/20EC 2001/85/EC 76/115-96/38EC 77/541-00/3EC 2001/85/EC 92/114/EC - GRSP GRSG GRSP GRSG GRSP ABBBABBBABBBABBB MMSSMMLMMMSSMMLM Symbols: A =first priority B = second step priority * =it could be an independent new regulation, too S =short work, less than 2 years, it does not need further study and analysis M = medium size work, 2-4 years, it needs certain study L = Long term work, more then 4 years, further study, analysis, international discussion is nee