SCT Trigger/Logic Card

Slides:



Advertisements
Similar presentations
Clock and Control Status Matt Warren, on behalf of Martin Postranecky.
Advertisements

XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 4 December 2008 Martin Postranecky Matt Warren, Matthew Wing.
XFEL C+C HARDWARE : REQUIREMENTS 1) To receive, process and store Timing Signals from TR ( Timing Receiver ) in same crate : - 5 MHz Bunch CLOCK - Bunch.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 22 October 2009 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL Meeting, Hamburg September 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
XFEL Meeting, RAL 20 January 2011 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing XFEL 2D Pixel Clock and Control System.
New Corporate Identity Poster Design Cavendish Laboratory, Department of Physics, University of Cambridge Maurice Goodrick, Richard Shaw, Dave Robinson.
The DAVE Card Status SCT has developed a new ATLAS trigger card “The card that no-one knew they needed, but now do” Introduction Concept & Motivation Functionality.
New Corporate Identity Poster Design Department of Physics and Astronomy, University College London Erdem Motuk, Martin Postranecky, Matthew Warren, Matthew.
SCT has developed a new ATLAS trigger card Introduction Concept & Motivation Functionality Overview Production Status ATLAS orders 03/05/20111Dave Robinson.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
1 Alan Barr, UCL Fixed Frequency Trigger Veto The problem: –Currents in wire bonds in presence of strong magnetic fields –DC current not a problem (small.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
ALICE Trigger System Features Overall layout Central Trigger Processor Local Trigger Unit Software Current status On behalf of ALICE collaboration:D. Evans,
12 GeV Trigger Workshop Session II - DAQ System July 8th, 2009 – Christopher Newport Univ. David Abbott.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
ATLAS SCT/Pixel TIM FDR/PRR 28 July 2004 Interfaces to ROD Crate Components - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane,
VC MICO Report July 07Jean-Sébastien GraulichSlide 1 Main news  DAQ test bench running in Geneva 2 LDCs connected to 2 different PCs, 1 GDCs DAQ trigger.
25 October 2005A.Ciocio - SCTSG1 Type IV Cables and PP3 Status & Plan.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
1.2.7 Trigger A.Nappi TB Nov 11, Digitizers ( )  Functions 25 MHZ 10 bit p.h. + 6bit time digitizers Digital processing  Flavor A: p.h.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
10 July 2003Matthew Warren - Trigger Module Update1 CALICE ‘FEDROB’ BE-FPGA Trigger Module Update Matthew Warren University College London 10 July 2003.
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
SCT Readiness for Heavy Ion Collisions Dave Robinson on behalf of SCT 15/9/101Dave Robinson Heavy Ion Review.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
ATLAS SCT/Pixel TIM FDR/PRR28 July 2004 Resonant Triggers - Matt Warren1 Physics & Astronomy HEP Electronics Matthew Warren John Lane, Martin Postranecky.
SoLID DAQ A.Camsonne SoLID collaboration meeting November 8 th 2013.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
ATLAS SCT/Pixel TIM FDR/PRR28 June 2004 TIM Requirements - John Lane1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics John.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
TDAQ status and plans for 2008 Carlos Solans TileCal Valencia meeting 17th December 2007.
Digital Trigger System for the COMPASS Experiment
LKr status R. Fantechi.
PyBAR Firmware Structure and Operation Experience
DAQ for ATLAS SCT macro-assembly
Interesting use-cases
MICE AFEIIt Timing and Triggering
CMS EMU TRIGGER ELECTRONICS
CDR Project Summary and Issues
Possible Upgrades ToF readout Trigger Forward tracking
7/10/2017 John Podczerwinski, Horatio Li
John Lane Martin Postranecky, Matthew Warren
Assembly order PCB design
The IFR Online Detector Control at the BaBar experiment at SLAC
Digital Atlas Vme Electronics - DAVE - Module
XFEL 2D Pixel Clock and Control System Train Builder Meeting, UCL 11 May 2010 Erdem Motuk, Martin Postranecky, Matt Warren, Matthew Wing,
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
Buying CERN-Standard Crates
Trigger Frequency Analysis & Busy/Veto on the SCT TIM
Trigger issues for the CALICE beam test
DAVE card Firmware Blocks
Interesting use-cases
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
The Trigger Control System of the CMS Level-1 Trigger
Presentation transcript:

SCT Trigger/Logic Card SCT is developing a new trigger/logic card which might be of interest to other subsystems What is it? What will it do? What to do if you want one (or two or…) ? 13/04/2010 Dave Robinson ATLAS Run Meeting

Dave Robinson ATLAS Run Meeting What is it? Digital Atlas VmeElectronics (DAVE) card 6U VME Hardware writeable by VME and USB Can also be used on the bench with a power supply Design/Production/firmware by UCL and Cambridge Matt Warren, Martin Postranecky(TIM engineers) Maurice Goodrick(BOC) 13/04/2010 Dave Robinson ATLAS Run Meeting

Dave Robinson ATLAS Run Meeting What will it do? “NIM crate” in a vme card Generic NIM-like logic operations on NIM/TTL signals Mini CTP Programmable random gate generator Trigger rates up to 100kHz Simple and complex dead-times Minimum X clocks between triggers Minimum X triggers in Y clocks Readout of trigger history on interrupt 5-10seconds history at 100kHz rate 13/04/2010 Dave Robinson ATLAS Run Meeting

Dave Robinson ATLAS Run Meeting 4 DT NIM/TTL 4 SHP L U T 2 4 RND PS MSK OR VETO 4 BG BUSY DT: L1A SD OR L1A CD CTP Functionality in DAVE card 13/04/2010 Dave Robinson ATLAS Run Meeting

What to do if you want one? Contact me by 19th April Requests for small iterations in functionality might be possible, but functionality frozen by week starting 19th April Delivery expected late summer 2010 A small financial contribution might be expected from non-ID subsystems Existing orders: SCT (3) Pixels (2) TRT (2) Thilo (2) 13/04/2010 Dave Robinson ATLAS Run Meeting