Effectively Communicating Your Project in a Funding Request

Slides:



Advertisements
Similar presentations
Airport Layout Plans (ALPs)
Advertisements

Dave Baker – Aeronautics Commission Contract Approval Anu Taneja – Sponsor Contracts Jennifer Forbes – Grant Closeout AERONAUTICS GRANT INITIATION AND.
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
SERVICE LEVEL AGREEMENTS The Technical Contract Within the Master Agreement.
State Grants For California Airports Gwyn Reese, Aviation Funding Specialist Caltrans - Division of Aeronautics September 2006.
3 CDBG Workshop Tuesday, November 26, Planning Grants $1.3 million available Awarded monthly 1 Original and 1 Copy Letters of Intent Projects/applications.
Presented to: By: Date: Federal Aviation Administration Federal Grants and Airport Capital Improvement Programs Western-Pacific Region Association of California.
Rail Freight Assistance Program (RFAP) S ETTING THE S TAGE FOR THE F UTURE Rail Transportation Assistance Program (Rail TAP) RFAC Meeting April 28, 2010.
For West Virginia Department of Education DISCLAIMER This PowerPoint presentation serves only as a snapshot of purchasing regulations. Please visit the.
Louisiana Safe Routes to School Program Department of Transportation and Development Louisiana Safe Routes to School Program The Application.
COMPLIANCE WITH GRANT IMPLEMENTATION PROCEDURES TxDot Grant Fund Project.
OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring and Reporting 2009 CSP Grant OFFICE OF INDEPENDENT EDUCATION & PARENTAL CHOICE Monitoring.
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Federal Force Account Utilizing Sponsor Resources Georgia Airports Association – Spring Workshop March 13, 2014 Presented By Katie Eleam Aviation Project.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airports Division Eastern Region Grant Closeout Guidance 33 rd Annual Airports Conference Patricia.
HIGHWAY/UTILITY PROGRAM OVERVIEW ROADWAY CONFERENCE APRIL 20, 2009.
Capital Improvement Plan (CIP) Lee Provost, Chief Office of Technical Services Senior Transportation Engineer Phone:
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Technical Assistance Grants to Communities Pipeline Safety Trust Conference New Orleans November 20, 2008 Steve Fischer PHMSA/Office of Pipeline Safety.
Social Innovation Fund Creating an Application in eGrants Technical Assistance Call 1 – 2:00 p.m. Eastern Time on Friday, March 19, ;
How to Submit An Amendment Tips from the 21 st CCLC Unit Updated September 17, 2009.
Handing Over the Keys to a Successful Construction Project Jason Morgan, Assistant Chief, Los Angeles County Department of Public Works Chuck McCormick,
Regional Planning Meetings 2005 Capital Improvement Program Overview Presented by Steven Cooks, Airport Planner.
NYS Division of Homeland Security And Emergency Services (DHSES) E-Grants Tutorial Creating an Application for the EOC RFP To access DHSES E-Grants you.
Enterprise Service Desk (ESD) Enterprise Service Desk for Notification / Knowledge Article Authors.
Proposition 1 Workshop: the Grant Application Process July 2015.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
3 CDBG Disaster Recovery Program InformationWorkshop Tuesday, January 13, 2009.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Arkansas Department of Emergency Management Arkansas’ Homeland Security & Preparedness Agency Sandy Recovery Improvement Act of 2013 Public Assistance.
Federal Aviation Administration Navigating the AIP April 18, 2016 By:Glenn A Boles, Manager, AR/OK ADO Kathy Franklin, Program Manager, AR/OK ADO Presented.
Governor’s Office of Emergency Services 1 The Governor’s Office of Emergency Services Application and Benefit Cost Analysis (BCA) Training.
1 Federal Aviation Administration AirTAP Fall Forum Wednesday, October 11, Airport Funding Status AirTAP Fall Forum Bob Huber Federal.
Contract Compliance Training
Award Set-Up and Advances
The Administration of Subrecipient Agreements
State Safety Inspections
Hangar Use Policy Winter Operations and Field Condition Reporting
Amendments A how-to Prepared by: Christine Melton-Lopez, IRB Associate.
Content of Tender Dossier Instructions to Tenderers
Particular Conditions of Contract & Appendix to Tender
ACA – Fall Conference FAA AIP Grants Management
AIRPORT PLANNING 101- THE BASICS
TRIP Approver Training
OSEP TA&D Program Performance Measurement
LOCALLY ADMINISTERED PROJECTS
Contract Compliance Training
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Duck, Duck, Goose Keeping your IRB Ducks in a Row
Particular Conditions of Contract & Appendix to Tender
Chapter 13 Proposals, Business Plans, and Formal Business Reports
What is the Value of Planning for My Airport?
AIP Eligibility Presented to: Oklahoma Airport
Completing the State Aid Payment Request
How to be Sure Your State-Based Financial Aid Review is Complete*
Orders & Shipment Tracking
Transferring AIP Expiring Funds
Click Training Agreements Module
REPORTING and PAYMENT (in practice)
2014 Project Application Process
AFDO-Managed Retail Program Standards Grant Program
AFDO-Managed Retail Program Standards Grant Program
Capital Improvement Plans
Airport Planning and Programming
Compliance Update Hershey Airport Conference March 28, 2019
System Safety Regulation
Jamie French and Keesha Thompson
CDBG Disaster Recovery Stormwater Program Workshop February 25, 2010
Presentation transcript:

Effectively Communicating Your Project in a Funding Request 2018 TAA Airports Conference Sevierville Convention Center Adam Guy, EI Transportation Project Specialist | 4/19/2018

Effectively Communicating Your Project in a Funding Request Definitions Effective Communication – a two way information sharing process which involves one party sending a message that is easily understood by the receiving party.* TAD Aero. receiving party Project Managers, Program Monitors, Planning, Upper Level Management, TAC Commissioners Project – planned set of interrelated tasks to be executed over a fixed period and within certain cost and other limitations.* Funding Request – formally asking for a grant of authority to incur monetary obligations and to pay for them.* *Source  http://www.businessdictionary.com Effectively Communicating Your Project in a Funding Request Effectively Communicating Your Project in a Funding Request

TAD Funding Request Requirements Proposed project is on the… Airport Capital Improvement Plan (ACIP) Airport Layout Plan (ALP) In line with the state’s priority ranking Local Share Commitment Detailed project funding request letter Estimate of Engineering and/or Construction Project Sketch (if applicable) Project Schedule For Federal funding requests, TAD will assist sponsor in determining if the proposed project is eligible, abiding by policies and procedures of the FAA State Priority Ranking Safety Security Pavement Preservation/Maintenance Preservation of Infrastructure Compliance with current FAA Standards Planning Increase Capacity/Modernization Equipment Landside Improvements Revenue Producing Effectively Communicating Your Project in a Funding Request

Converting Proposed Project From ACIP in BlackCat 1 2 BlackCat Grants Airport Sponsor User’s Guide Effectively Communicating Your Project in a Funding Request

Editing Proposed Project Information 3 4 Effectively Communicating Your Project in a Funding Request

Editing Proposed Project Information Detailed Project Description/Justification Please reference (if applicable): PCI Report Environmental Findings PCI value & Pavement Section ID # RSA Determination Obstruction Survey Inspection Report Runway Justification Study State and/or FAA Inspection Wildlife Management Study Noise Study ALP or Master Plan Other relevant technical guidance IFRs ACIP FAA Order 5100.39A, Appendices 5 & 6 AIP Handbook FAA Order 5100.38D Effectively Communicating Your Project in a Funding Request

Project Funding Request Effectively Communicating Your Project in a Funding Request

Project Funding Request Original or Amendment When do we expect the grant to be closed? (Typically 3 months after work is complete is complete) With schedule and project sketch (if applicable) Effectively Communicating Your Project in a Funding Request

Project Funding Request Capital or Planning Input dollar amounts into the text boxes, the percentages will auto populate Effectively Communicating Your Project in a Funding Request

Project Funding Request Please do not forget to click “Submit” After submittal, TDOT project manager gets an email alert Effectively Communicating Your Project in a Funding Request

Project Funding Request Project supporting documentation Effectively Communicating Your Project in a Funding Request

Project Request Letter Requirements Authority, County, or City Letterhead Date letter is signed Subject: Request for funding for [Project] Body: Information about the proposed project Affected areas? Goal of the project? Reference technical documents for support Total Cost of the project (requesting state and/or federal funds?) Written commitment to the local match Authorization from grantee signatory Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Why are you requesting the money? Local Share commitment Grantee Signatory Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Engineering Estimate Must include: Airport Project name Preliminary Level Estimate [0%, 30%, 60%, 90%, bid, etc.] Date Breakout of task and/or item descriptions Task hours Quantities Unit costs Total costs Please review project costs Reach out to TDOT project manager for assistance once sponsor review is complete Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Project Schedule Schedules vary slightly Pinpointing exact days is key Major Milestones Realistic Schedule Typically a month after approval Typically 3 months after construction completion Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Project Sketch North Arrow & Scale Concise Legend Effectively Communicating Your Project in a Funding Request

What do we look for when reviewing a Project? Is the project state or federally eligible? Does the project abide by State/FAA priority relative to sponsors airfield? Is the project justified? 3 basic tests Is the project on airport property? Is the project on the current FAA approved ALP? Is the project on the ACIP? Are there any environmental concerns? If the project is phased, will it result in a usable unit of work? Will the project be planned, designed, and/or constructed to Local, State, and Federal standards? AIP Handbook FAA Order 5100.38D Effectively Communicating Your Project in a Funding Request

What do we look for when reviewing a Project? How much risk is involved with this project? What kind of procurement measures will be necessary? Are the costs allowable and reasonable? Can the project be completed without unreasonable delay? Reference: FAA AIP Project Evaluation Review and Development Analysis Checklist (PERADA) https://www.faa.gov/documentLibrary/media/Form/faa-form-5100-109-PERADA-201610.pdf Effectively Communicating Your Project in a Funding Request

Emergency Grant Requests Notify appropriate TAD staff ASAP (Written Format Preferred) Here are elements that TAD considers/requires for Emergency Requests, but not limited to: Is it an emergent situation that requires immediate action? Is this in the best interest of the safety of the flying public, in regards to immediate action? Can the concern be temporarily fixed or mitigated? Are there parts of the airfield that are temporarily inoperable? Should there be? When is emergency work intended to begin? Is it eligible for state reimbursement? Submit a formal and detailed emergency funding request into BlackCat Include: Project Request Letter Engineering Estimate and Schedule (if applicable) Please acknowledge when the sponsor incurs costs without grant; there is no guarantee the project will be eligible for reimbursement. However, required emergency projects are often reimbursable. Effectively Communicating Your Project in a Funding Request

Example Emergency Airfield Projects Examples (not limited to) Sinkhole Repair Pavement Repair (primary operating areas) Storm Damage Repair for Airport Facilities Lighting /Airfield Sign Repair Security Repair Utility/Storm Pipe Repair Preventable… (incorporate into ACIP): Obstructions Rubber Removal Land Drainage Pavement Effectively Communicating Your Project in a Funding Request

Funding Request for Emergency and Amendment Requests in BlackCat Projects Tab “Add New” Once project is added, you can add a funding request. Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Resources https://www.tn.gov/tdot/aeronautics/planning.html Calendar Year 2018: Key Dates and Request Deadlines TAC Projects PSR Projects Effectively Communicating Your Project in a Funding Request

Effectively Communicating Your Project in a Funding Request Resources Visit our Website! Sample TAC Presentation TDOT Aero Sample Project Request Letter Proposed hangar request form Detailed project schedule TAC Policies BlackCat Grant Management System Login Request Form Airport Management Guide Funding Request Deadlines https://www.tn.gov/tdot/aeronautics.html Effectively Communicating Your Project in a Funding Request