LLRF Control System Outline Scope Requirements Design Considerations

Slides:



Advertisements
Similar presentations
XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
Advertisements

26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Test of LLRF at SPARC Marco Bellaveglia INFN – LNF Reporting for:
R. Akre, P. Emma, P. Krejcik LCLS April 29, 2004 LCLS RF Stability Requirements LCLS Requirements The SLAC Linac.
Ron Akre, Dayle Kotturi LCLS April 20, 2006 Linac Coherent.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Ron Akre, Dayle Kotturi LCLS LLRF April 16, 2007 Linac.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
Capture Cavity 1at A0 SIMCON2.1 with MATLAB  closed loop with max gain ( 250 )  RMS amplitude noise ≈ 0.07%  RMS phase Noise ≈ 0.2°  closed.
Ron Akre, Dayle Kotturi LCLS February 8, 2006 Linac Coherent.
Argonne National Laboratory is managed by The University of Chicago for the U.S. Department of Energy P0 Feedback Project: Merging EPICS with FPGA’s Nicholas.
LLRF Phase Reference System The LCLS linac is broken down into 4 separate linac sections. The LCLS injector will reside in an off axis tunnel at the end.
LCLS-II Linac LLRF Control System – L1, BC1 Zheqiao Geng Final Design Review May 7, 2012.
LCLS-II Injector LLRF System – MicroTCA Based Design Zheqiao Geng 6/4/2012.
RF Synchronization Activity at SPARC A.Gallo and D. Alesini, M. Bellaveglia, R. Boni, G. Di Pirro, A. Drago, A.Ghigo P. Baldini, L. Cacciotti, M. Scampati,
FEL Beam Dynami cs FEL Beam Dynamics T. Limberg FEL driver linac operation with very short electron bunches.
Dayle Kotturi Lehman Review May 10-12, 2005 Low Level RF Outline Scope Local feedback loop requirements Solutions Costs How this.
LCLS-II Linac LLRF Control System – L2, L3 Zheqiao Geng Preliminary Design Review May 7, 2012.
Ethernet Based Embedded IOC for FEL Control Systems J. Yan, D. Sexton, Al Grippo, W. Moore, and K. Jordan ICALEPCS 2007 October 19, 2007 Knoxville Convention.
Zheqiao Geng 6/5/2012 Plan for Evaluating LLRF Deployment Solution at LCLS-II.
LLRF ILC GDE Meeting Feb.6,2007 Shin Michizono LLRF - Stability requirements and proposed llrf system - Typical rf perturbations - Achieved stability at.
Dayle Kotturi System Concept Review/Preliminary Design Review November 16, 2005 LLRF Outline System Concept Review Requirements.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Fast feedback, studies and possible collaborations Alessandro Drago INFN-LNF ILCDR07 Damping Rings R&D Meeting 5-7 March 2007.
The recent history and current state of the linac control system Tom Himel Dec 1,
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
LCLS LLRF System October 10-13, 2005 LLRF05 B. Hong, R. Akre, A. Hill, D. Kotturi, H. Schwarz SLAC, Stanford, Menlo Park, CA 94025, USA Work supported.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
@ Fermilab ILC bunch-compressor and linac rf requirements Sergei Nagaitsev Fermilab Feb. 9, 2006.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
RF low level control & synchronization A. Gallo, M. Bellaveglia, L. Cacciotti SPARC review committee – ENEA Frascati – 16/11/2005.
Overview of long pulse experiments at NML Nikolay Solyak PXIE Program Review January 16-17, PXIE Review, N.Solyak E.Harms, S. Nagaitsev, B. Chase,
LLRF development of SSRF RF Group and Linac Group
LCLS_II High Rep Rate Operation and Femtosecond Timing
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
RF Synchronization Activity
SLC-Aware IOC LCLS Collaboration Jan 26, 2005
ILC LLRF Status Ruben Carcagno, Brian Chase
Second SPL Collaboration Meeting, Vancouver May 2009
LLRF Controls Outline Requirements External Interfaces Schedule Design
LLRF and feedback Outline Scope LLRF Requirements
Beam-Based Feedback in LCLS-II
LLRF Functionality Stefan Simrock How to edit the title slide
LLRF and Beam-based Longitudinal Feedback Readiness
Fill-pattern Control System for KEKB
LCLS Event System - Software
Low Level RF Status Outline LLRF controls system overview
LCLS Longitudinal Feedback and Stability Requirements
Advanced Research Electron Accelerator Laboratory
LCLS Drive Laser Timing Stability Measurements
Low Level RF Status Outline LLRF controls system overview
LCLS RF Stability Requirements
Linac/BC1 Commissioning P
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
LLRF Control System Outline Scope Requirements Options considered
Linac Coherent Light Source (LCLS) LLRF Preliminary Design Review LLRF Monitor and Control System September 26, 2005 Ron Akre.
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Linac LLP Outline LINAC Long Lead Procurements
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Operational Experience with LCLS RF systems
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
Linac Coherent Light Source (LCLS) Low Level RF System Injector Turn-on December 2006 February 8, 2006.
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Breakout Session SC3 – Undulator
Presentation transcript:

LLRF Control System Outline Scope Requirements Design Considerations Evaluation System drawings How this fits into beam-based longitudinal feedback Conclusions

Scope This document summarizes the design of the LCLS LLRF control system design including its interface with the beam-base longitudinal fast feedback.

Scope The low level RF controls system consists of RF phase and amplitude controls at these locations: Laser Gun (Klystron 20-6) L0-A, a.k.a. L0-1 (Klystron 20-7) L0-B, a.k.a. L0-2 (Klystron 20-8) L0 Transverse cavity (Klystron 20-5) L1-S (Klystron 21-1) L1-X (Klystron 21-2) L2 - (Klystrons 24-1,24-2,24-3) to control avg phase/ampl of L2 L3 Transverse cavity (Klystron 24-8) L3 - 2 sectors of klystrons, S29+S30

Requirements (1) Meet phase/amp noise levels shown below: Table 1. RMS tolerance budget for <12% rms peak-current jitter (column 3) or <0.1% rms final e− energy jitter (column 4). The tighter tolerance is in BOLD, underlined text and both criteria, |DI/I0| < 12% and |DE/E0| < 0.1%, are satisfied with the tighter tolerance applied. All tolerances are rms levels and the voltage and phase tolerances per klystron for L2 and L3 are Nk larger, assuming uncorrelated errors, where Nk is the number of klystrons per linac.

ParameterSymbol|ΔI/I0| < 12%|ΔE/E0| < 0 ParameterSymbol|ΔI/I0| < 12%|ΔE/E0| < 0.1%Uni tmean L0 rf phase (2 klystrons)00.100.10S-band degmean L1 rf phase (1 klystron)10.100.10S- band degmean LX rf phase (1 klystron)x0.50.5X- band degmean L2 rf phase (28 klystrons)20.070.07S-band degmean L3 rf phase (48 klystrons)30.50.15S-band degmean L0 rf voltage (1-2 klystrons)DV0/V00.100.10%mean L1 rf voltage (1 klystron)DV1/V10.100.10%mean LX rf voltage (1 klystron)DVx/Vx0.250.25%mean L2 rf voltage (28 klystrons)DV2/V20.100.10%mean L3 rf voltage (48 klystrons)DV3/V30.50.08%BC1 chicaneDB1/B10.010.01%BC2 chicaneDB2/B20.050.05%Gun timing jitterΔt00.80.8psecInitial bunch chargeDQ/Q02.04.0%

Requirements (2) Achieve 120 Hz feedback to maintain phase/amp stability Adhere to LCLS Controls Group standards: RTEMS, EPICS, Channel Access protocol Begin RF processing of high-powered structures May, 2006

Local feedback loop requirements At each of these locations, the klystron’s phase and amplitude will be monitored and controlled When beam is present, control will be done by beam-based longitudinal feedback (except for T-cavs); when beam is absent, control will be done by local phase and amplitude controller (PAC)

Design considerations Through end of January 2005, various solutions were evaluated, from 100% COTS modules to hybrids of in-house designed boards.

Options considered Jan/05 (2)

Options considered Jan/05 (3)

Options considered Jan/05 (4)

Options considered Jan/05 (5)

Options considered Jan/05 (6)

Options considered Jan/05 (7)

Options considered Jan/05 (8)

Narrowing down the options May/05 Later, the options were narrowed down to two: an Off-the-shelf solution and an in- house solution. This subset of options was presented at the Lehman Review, May 10-12, 2005. Ref: Low Level RF

Off-the-shelf solution May/05

In-house solution May/05

Evaluation The Off-the-shelf solution is: The in-house solution is: Expensive ($25K per instance * 10 instances) Noisy. ADCs are up to 150’ from what they measure so analog noise levels and ground loop problems would need to be dealt with The in-house solution is: Possibly longer to develop due to board design and fabrication time.

Evaluation (2) Characteristics of the Off-the-shelf solution were seen as requiring more effort than those of the in- house solution Potential offered by the lower cost of the in-house solution to replace 250 klystron controllers in the remainder of the LINAC is attractive Hardware people were available as of 22aug2005 to work on board design if µcontroller was decided Turned to the EPICS community for ideas and chose a µcontroller

Evaluation (3) Lower cost alternatives to the $15K VME chassis and IOC were discussed in the session on hardware at the EPICS Collaboration Meeting. April 27-29, 2005 Of the options available, only the Coldfire uCdimm 5282 processor had the communication speed and power to meet our data requirements. Cost is $150 per processor plus the development of the board it sits on

Evaluation (4) By choosing the Coldfire processor, we are able to make use of the port of the operating system, RTEMS, which has already been done. RTEMS is the standard for the real-time operating system chosen for LCLS by the Controls Group EPICS, the standard for the control system software for LCLS runs on RTEMS With these choices, the LLRF control system will be fully integrated into the rest of the LCLS EPICS control system and can speak to other devices and applications such as control panels, alarm handlers and data archivers, using Channel Access protocol, the standard communication protocol for this project.

How this fits into global feedback (Gun)

How this fits into global feedback (L0)

How this fits into global feedback (L1)

How this fits into global feedback (L2)

How this fits into global feedback (L3)

How this fits into global feedback

Conclusions This solution: meets the spec for speed and noise avoids signal noise problems avoids ground loop problems meets LCLS control system requirments and standards running EPICS on RTEMS provides a low cost path for future upgrade in the rest of the LINAC when the rest of the klystron control is replaced

Conclusions At 120 Hz, the LCLS LLRF raw signals must be processed, the phase and amplitude corrections must be sent out, applied and achieved When there is beam, this system will integrate with the beam-based longitudinal feedback by accepting the latter’s RF phase and amplitude corrections and passing them on.