Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.

Slides:



Advertisements
Similar presentations
1 Pixel Bus Development Atsushi Taketani RIKEN/RBRC 1.Who is working 2.Over view of pixel bus 3. Manufacture process 4. Issues 5. Development / Production.
Advertisements

10-Nov-2005US ATLAS Tracking Upgrade Santa Cruz 1.
ITS-week CERN December 3, 2001 Michel Morel CERN EP/ED.
LBNL PIXEL IPHC 2009_06_LG1 Flex Cable Development The development of the flex cable for sensor readout and control is envisioned as a 4 stage process.
On the development of the final optical multiplexer board prototype for the TileCal experiment V. González Dep. of Electronic Engineering University of.
6/8/03J. Lajoie - PHENIX Silicon Workshop1 Pixel Ladder, PILOT Issues Physical structure of first pixel layer –FPGA-based PILOT chip readout Show some.
Victoria04 R. Frey1 Silicon/Tungsten ECal Status and Progress Ray Frey University of Oregon Victoria ALCPG Workshop July 29, 2004 Overview Current R&D.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
The LHCb Inner Tracker LHCb: is a single-arm forward spectrometer dedicated to B-physics acceptance: (250)mrad: The Outer Tracker: covers the large.
LBNL Michal Szelezniak, Eric Anderssen, Leo Greiner, Thorsten Stezelberger, Joe Silber, Xiangming Sun, Chinh Vu, Howard Wieman UTA Jerry Hoffman, Jo Schambach.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 States report for readout system 1.PHENIX readout system overview 2.High speed data link 3.Digital pilot ASIC 4.Schedule Hiroyuki
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
Readout of DC coupled double sided sensors with CBMXYTER: Some first thoughts Peter Fischer, Heidelberg University.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
M. Szelezniak1PXL Sensor and RDO review – 06/23/2010 STAR Hardware Prototyping Status.
Experience with the MVD Living around the beam pipe Components, connections, signals, systems Hubert van Hecke - Los Alamos.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Fine Pixel CCD Option for the ILC Vertex Detector
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
11/01/2006Wilco Vink / Martin van Beuzekom / L. Wiggers L0 ECS Workshop Pile-Up System.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
David Emschermann CBM Collaboration Meeting - GSI – 12/04/2010 TRD geometry in CBMroot and conclusions for detector module design David Emschermann Institut.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
23 February 2004 Christos Zamantzas 1 LHC Beam Loss Monitor Design Considerations: Digital Parts at the Tunnel Internal Review.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
PXL Cable Options LG 1HFT Hardware Meeting 02/11/2010.
Pixel 2000 Workshop Christian Grah University of Wuppertal June 2000, Genova O. Bäsken K.H.Becks.
1 Engineering issues for FPCCD VTX Detector Y. Sugimoto KEK July 24, 2007.
Super-Belle Vertexing Talk at Super B Factory Workshop Jan T. Tsuboyama (KEK) Super B factory Vertex group Please visit
Vertex Detector Options and R&D Requirements Upgrade DC Meeting December 11, 2002 Yuji Goto (RIKEN/RBRC) for the Silicon USG.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
At the HERA collider in Hamburg an experiment (ZEUS) has been built to study electron-proton collisions. For the near future an upgrade of this experiment.
Sept. 7, 2004Silicon VTX Workshop - Brookhaven National Laboratory, Long Island, New York Prototype Design of the Front End Module (FEM) for the Silicon.
1 FPCCD VTX Work Plan Y. Sugimoto 2010/1/22. 2 FPCCD: Features and R&D issues (1/2) Small pixel size (~5  m) –Sensor development Small size chip; ~6mm.
Progress report of new PHENIX pilot chip Hiroyuki Kano (RIKEN) 1. Overview 2. Digital pilot ASIC and test board 3. Functionalities and test result 4. GOL.
The Development of the Fabrication Process of Low Mass circuits Rui de Oliveira TS-DEM.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
Silicon strip detector R&D issues –readout chip decision –interface with PHENIX –ladder Technical options –SVX4 or MVD-TGV+AMU/ADC recut –other sensors.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.
Low Mass Alice Pixel Bus Rui de Oliveira TE/MPE/EM 6/9/20161Rui de Oliveira Alice worshop.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
The Data Handling Hybrid Igor Konorov TUM Physics Department E18.
2 March 2012Mauro Citterio - SVT Phone meeting1 Peripheral Electronics Some updates Mauro Citterio INFN Milano.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
RIKEN/CERN pixel electronics/bus R&D plans Johann M. Heuser RIKEN - Radiation Laboratory PHENIX Silicon Upgrades Meeting 10 April 2003.
Si Sensors for Additional Tracker
The Jülich Digital Readout System for PANDA Developments
Hybrid Pixel R&D and Interconnect Technologies
Requirements and Specifications for Si Pixels Sensors
SVT front-end electronics
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
Example of DAQ Trigger issues for the SoLID experiment
The CMS Tracking Readout and Front End Driver Testing
SVT detector electronics
SALTRO16 activities in Lund
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Perugia SuperB Workshop June 16-19, 2009
Presentation transcript:

Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options R&D plans

Overview on ALICE pilot and bus ladder pilot chip pixel chips data bus with chip select optical link One pilot takes care of 10 pixel chips (serial readout) readout to pilot horizontal lines (3rd layer) vertical lines (4th layer)

Bus: cross section READOUT CHIP PIXELS DETECTOR 150 to 200µm 290µm 150 to 200µm carbon fiber support cooling passive components 6 layers: Digital GND: 25 m Digital power: 25 m Hori. line: 10 m Vert. line: 5 m Analog power: 25 m Analog GND: 25 m Material: Al (conductor) + Kapton (insulator)

Pilot chip multi chip module Takes care of readout, control (via JTAG), etc. ALICE PCMCM: Consists of 4 parts - Analog pilot (A), Digital pilot (D), GOL (G), and optical link driver (O) Analog pilot -- monitors temperature, etc. G + O drives G link. Bandwidth: 1.28 Gb/s Digital pilot -- main chip A D G O 15.5 mm 51 mm

Requirements Parallel readout -- 8 chips max lines instead of 32 Bus: high density and/or more layers Pilot: multi pilot chips or more inputs Data size: 32×256×8 bit/event Gb/s > 1.28 Gb/s (ALICE G-link bandwidth) zero suppression at front-end Other issues - Space (width: ~1.5 cm) - thickness - cost, rate of bad product

Pilot options Use original ALICE pilot chips - need multiple pilot chips per ladder seemingly unrealistic due to available space FPGA - easier to develop - size too large cannot be placed on ladder effect of longer cable is an issue new ASIC - R&D cost & time is the issue My personal opinion - new ASIC is the best solution - starting with FPGA may be better.

Zero suppression on pilot Input: 8192×8 bits in 1.6 Gb/s) Many possible ways Example: hit (1 bit) address (16 bit) 10 kbit/event (250 Mb/s) for 1% occupancy Possible issues: - error correction - total data size (25 kByte/event) Further processing may be required at later stage.

Bus options ~ 300 lines in one layer - 50 m pitch not impossible, but too aggressive 2 or 4 layers are probably reasonable (6 or 8 layers in total) Cooling pipe may be embedded in the bus. - R&D by a venture company in Japan (Enhama) If pilot chips are outside of the ladder, line width may be severer. (noise, line conductance,...)

R&D plans Pilot - Iowa, RIKEN - Iowa: starting from FPGA studying with software simulation real FPGA coding (Summer-Autumn) - RIKEN: one PD (H. Kano) staying at CERN from Apr. learning pilot/bus technologies from ALICE First prototyping (with minimal modification) within JFY complimentary to each other.

Bus R&D First trial on prototyping with minimal modification - same bus configuration - PCMCM and bus are on the same (flexy) board - power, GND: Al, signal lines: Cu - try cooling pipe embedded bus Currently doing design with KEK engineers. Submit by July, expecting to finish in Autumn. If successful, we will try buses with more layers/lines-per-layer.

Summary Pilot chip/bus modification is required due to readout time limit in PHENIX. Up to 8 chips must be read out in parallel. Zero suppression at pilot is also necessary. Pilot R&D: Iowa (FPGA) and RIKEN (ASIC) - complimentary to each other. Bus R&D: RIKEN Both started. First prototype will be available in this year.