FECA Engineers Conference SEMINOLE UPDATE

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

1 Chapter 69 - Clinical Disturbances of Phosphate Homeostasis Copyright © 2013 Elsevier Inc. All rights reserved.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 14.
ITRS Winter Conference 2011 Incheon, Korea 1 Work in Progress: Not for Distribution 2012 ITRS Litho One Pager April 24, 2012 Mark Neisser – SEMATECH Mauro.
Research & Innovation Towards better access to scientific information "Strategy, policy and funding" Copenhagen June 13 th Octavi Quintana Trias Director,
Standards Review Subcommittee Update August 20, 2013.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
EU Framework for National Roma Integration Strategies up to 2020 Funding EU Roma meeting Dominique Bé 11 May 2011, Prague.
1 Revision of the PSI Directive and Open Data Strategy A view from the European Commission LAPSI Conference Warsaw, 20 October 2011 Katarzyna Janicka-Pawlowska.
Ministry of Economy of the Slovak Republic and supporting of innovation development in enterprises 24th June 2013.
European Territorial Co-operation Resources th meeting of the Expert Group on Delegated and Implementing Acts for the ESI funds 27 September.
1 Cohesion Policy support for Sustainable Energy Intelligent Energy Europe boosting regional competitiveness through sustainable energy Open Days Workshop.
STATE BUDGET OUTLOOK MULTI-YEAR TREND ANALYSIS OFFICE OF MANAGEMENT AND ENTERPRISE SERVICES (OMES – formerly Office of State Finance) November 1, 2013*
Workforce conditions & growth forecast issues Presented to the Consensus Economic Forecasting Commission October 25, 2013 Glenn Mills Chief Economist Center.
FNB House Price Index – March 2014 Still reflecting a solid, well- balanced residential market 1 April 2014.
Discrete Maths Objective to describe the Big-Oh notation for estimating the running time of programs , Semester 2, Running Time of.
Orting School District Technology Plan July 1 st, 2013 to June 30, 2016.
American Institute of Steel Construction Charlie Carter Vice President and Chief Structural Engineer.
Update Contract Support. FY 2012 Contract Support Cost Shortfall Report Submitted to Congress on July 10, 2013 To review report: BIA.GOV web site, Choose.
Update on the power situation in Asia Edgar van der Meer Energy Analyst June 21, th World Chlor-Alkali Conference.
Overview of Draft Report by Statewide Advisory Committee on Cooling Water Intake Structures Inter-Agency Working Group SACCWIS Meeting March 27, 2014.
Maine Workforce Conditions & Outlook Presented to the Joint Standing Committee on Labor, Commerce, Research, and Economic Development January 29, 2013.
Difference, Product and Quotient Functions
LAMERE Business Systems introduction Last updated: June 14, 2014.
ELA and Math Assessments 2013 Grades 3 – 8: District Test Results Presentation to the Board of Education Kings Park Central School District September 10,
10/5/2013Multiplication Rule 11  Multiplication Rule 1: If a > b and c > 0 then a c > bc Examples If 7 > 3 and 5 > 0 then 7(5) > 3(5) If 2x + 6 > 8 then.
Provider Portal and IC Reports Update for Artemis Users May 20, 2014.
NERC Operating Committee Activities Update June 10-11, 2014 Meeting.
WMO ET-ABO Work Plan & Program Development ET-ABO Approved Work Plan, Strategy & Program Development (Agenda Item 5.1.1)
1 RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva, 21 May 2013 RAG Informal Meeting on ITU-R Strategic and Operational Plans Geneva,
17 th Annual New Mexico Infrastructure Finance Conference Integrated Planning and Funding for Utilities Development and Maintenance of the ICIP Program.
WELCOME AND INTRODUCTION
Executive Officer’s Report Council Meeting Tuesday, 29 April 2014 Presentation by: Barry Doyle Executive Officer Community Housing Coalition of WA.
Functions with Inverses Functions with Inverses
National Truck Plan: Modernising the Australian Truck Fleet Fremantle, 13 June
Western Hemisphere Membership Development Strategy.
Nadia Konzali Project Coordinator, COSCAP-GS
In partnership with Lead Schools Induction Training Event 27 and 28 th November 2013 Pauline Marson Mark Lancett CfBT.
Action Plan for Fashion and high-end industries
”Assessing knowledge gaps on future climate policy implications from an overview across mitigation and adaptation initiatives“ Monday 11 November 2013.
GRI-S : Infrastructures The Union list of projects of common interest European Commission DG Energy Internal Market I: Networks and Regional Initiatives.
CEEP Annual Work Programme 2012 Update and Outlook Meeting of the General Assembly Brussels 15 May 2012.
E. Africa Agro-Climatic Updates 14 January, 2014.
Member States reporting on R&I reforms in view of NRP Update by the group on the European Semester and ERA monitoring Ward Ziarko – ERAC december 2013.
EIONET workshop on Climate Change Impacts, Vulnerability and Adaptation, EEA, Copenhagen, 20 June 2013 Objectives of the workshop and EEA activities on.
Grades 9-12 MONITORING REPORT HIGHLIGHTS DECEMBER 2013.
Weekly Attendance by Class w/e 6 th September 2013.
Church Finances July Financial Update financial year summary for general account Building fund income and expenditure to date Projection.
V1DIS Sustainability Target Report Lucy Newcombe June 2014 Update.
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with consumers – No 2 30 January 2014.
ECONOMIC BENEFITS OF USING HIGH(ER) EFFICIENCY TRANSFORMERS IN LOW LOAD CONDITIONS Florida Electrical Cooperative Association Statewide Engineers Conference.
August 2013 – Juli MSEK Dipl.-Ing. Sabine Bonitz Improved Prediction of Flow Separation for Road Vehicles.
1 ENOC 18 th Annual Conference Rights of the child and child poverty October 2014, Edinburgh Lara Blake European Commission DG JUST Unit C1 Fundamental.
Every year, almost one million people die from suicide; this roughly corresponds to one death every 40 seconds.
Energy Year 2014 Electricity Finnish Energy Industries.
PBTs & College Council PBTs & College Council Batch 1 SLOAC SSLOAC AUOAC Batch 1 SLOAC SSLOAC AUOAC Curriculum Review ACCJC Resource Allocation.
STATE BUDGET OUTLOOK MULTI-YEAR TREND ANALYSIS OFFICE OF MANAGEMENT AND ENTERPRISE SERVICES November 1, 2014* Shelly Paulk Revenue Analyst *To be updated.
Specialist Group Funding Helena Djurkovic 4 th December 2014.
7 Due Process Update Evaluation Standards. Evaluation Materials and Procedures.
Small Engine Tool ID Part 1.
Come and be a member of our website.
EDLC(Embedded system Development Life Cycle ).
Tax Reform Affecting Investors
(Analyses Acceleration) (with Nested Iterations)
5th International Conference on Engineering and Natural Science
Engine Part ID Part 1.
Engine Part ID Part 2.
Engine Part ID Part 2.
Tainan Section & Taipei Section
Presentation transcript:

FECA Engineers Conference SEMINOLE UPDATE Glenn Spurlock June 10, 2013 June 10, 2013

SEMINOLE UPDATE 2013 – New General Manager 2014 – LCEC exit 2017 – Peaking needed (PPA vs. Build) 2020s – Combined Cycle and Peaking needed (PPA vs. Build)

SEMINOLE UPDATE NEW MEMBER INTERCONNECTS CFEC – <2 MW Biogas (operational 2012) TCEC – 2 MW Solar CEC – 3.2 MW Landfill Gas SECO – 5 MW Solar (removed from queue) CEC – 12 MW Solar GEC – 25 MW Co-Generation TEC – 60 MW Solar PRECO/SECI 160 MW IPP

SEMINOLE UPDATE FERC Order 1000 Regional & Interregional Transmission Planning FERC Jurisdiction Entities Must Comply Details: Project Qualification Criteria Cost Allocation Process Project Justification: Reliability Cost Effective/Efficient Public Policy Implementation thru OATT Attachment K Process

OTHER INTERESTING FACTS 2013 – Duke Crystal River 3 decommission announcement 2016 – Duke Crystal River 1 shutdown 2016 – Duke Crystal River 2 shutdown FRCC does not have models available for utilities to perform transmission planning studies

QUESTIONS?

FECA Engineers Conference SWECKER VS. MIDLAND Glenn Spurlock June 10, 2013 June 10, 2013

Background In 1998, the Sweckers, retail customers of Midland Power Cooperative in Iowa, purchased a 65 kW wind generator for their farm. The wind generator was a renewable resource which met the requirements of a qualifying facility (QF). FECA Conference June XX, 2013

DISPUTES Almost immediately after being connected to Midland’s system, the Sweckers began to have disputes with Midland concerning: What connection fee the Sweckers need to pay, as a qualifying facility (QF) or as a farm/residential connection; What avoided cost amount Midland should pay the Sweckers for purchasing electricity; and What venue certain legal actions must commence within, and more… FECA Conference June XX, 2013

Swecker POSITION The Sweckers argue that the avoided cost that Midland is paying the Sweckers for the electricity produced by their wind generator is too low, and that Midland owes the Sweckers money. The Sweckers stopped making payments for electric service to Midland, pending resolution of the issues. FECA Conference June XX, 2013

Swecker POSITION The Sweckers argue that because they have filed the avoided cost complaint, that the issue is still on going and thus Midland cannot disconnect the Sweckers until the issue has been fully vetted. FECA Conference June XX, 2013

MIDLAND ACTIONS In 2011: FERC published its intent not to take action on the avoided cost dispute between the parties. Midland disconnected the Sweckers due to non-payment of electric bills. Midland stated that the Sweckers could be reconnected if the Sweckers paid their electric bill. FECA Conference June XX, 2013

PROPER DISCONNECT (?) On December 9, 2011, the Sweckers filed a complaint that Midland trespassed on their property and locked the Sweckers’ disconnect switch without permission, thereby shutting off electric service to the Sweckers’ QF and residence.

PROPER DISCONNECT (?) The Sheriff was called and Midland admitted that the disconnect switch was property owned by the Sweckers. Midland’s crew, in the presence of the Sheriff, removed the lock on the disconnect switch.

ISSUE Presented Can an electric utility unilaterally disconnect a QF for non-payment of past bills? FECA Conference June XX, 2013

EXPLANATION Answer: No FERC reasons that termination, even a temporary termination, may only be accomplished by following the FERC’s rules for termination, i.e., applying to FERC for the ability to terminate. FECA Conference June XX, 2013

Dec. 15, 2011 FERC Order Holding and Analysis “[W]e find Midland’s disconnection of the Sweckers’ QF to be inconsistent with its obligations under PURPA.” Under section 210(a) of the Public Utility Regulatory Policies Act (PURPA,) Midland has an obligation to purchase from QFs and to sell electricity to QFs. FECA Conference June XX, 2013

Dec. 15, 2011 FERC Order Holding and Analysis Before the Energy Policy Act of 2005 (EPAct 2005), disconnection of QFs for non-payment of bills was left to State regulatory authorities. In implementing EPAct 2005, however, this issue was addressed, and provided specific FERC regulations on, how an electric utility may terminate its obligations to purchase from and sell to QFs. FECA Conference June XX, 2013

Dec. 15, 2011 FERC Order Holding and Analysis The Sweckers receive retail service from Midland, which is usually beyond the reach of FERC authority to regulate. However, the Sweckers also own a QF onsite with certain FERC buying and selling requirements. PURPA does not allow services to a QF to be disconnected unilaterally by and at the sole discretion of the interconnected purchasing/selling electric utility, here Midland, merely because that electric utility also happened to be selling retail service. FECA Conference June XX, 2013

RECOMMENDATION Seek legal advice prior to disconnection of a QF.

Questions FECA Conference June XX, 2013

LOOPED DELIVERY POINTS FECA Engineers Conference LOOPED DELIVERY POINTS Glenn Spurlock June 10, 2013 June 10, 2013

LOOPED DELIVERY POINTS Transmission facilities are deemed “integrated” if they meet any one of the Mansfield Test criteria AND Integrated transmission facility capital costs are rolled-in to transmission Rate-Base

LOOPED DELIVERY POINTS Mansfield Test for Integrated Trans. Facilities Facilities are looped Energy can flow in both directions Transmission Owner provides services over the facility to other customers Facility provides for higher system reliability An outage of the facilities would have an adverse effect on the system and to other customers

LOOPED DELIVERY POINTS

WHAT DOES THIS MEAN TO US? TDU cooperatives may want higher reliability that comes from looped Delivery Points TOs are responsible for controlling their Rate Base charges and therefore determine when facilities are to be looped on their system (w/costs rolled into Rate Base) FERC has no mechanism for TOs to accept CIAC for looping Delivery Points

Questions FECA Conference June XX, 2013

DUKE ENERGY FLORIDA FECA Engineers Conference Glenn Spurlock June 10, 2013 June 10, 2013

DUKE ENERGY FLORIDA Seminole has 60-65% of its Member load imbedded in the Duke Florida transmission system. Some Seminole Members seek a higher level of reliability via looped delivery systems.

DUKE ENERGY FLORIDA Progress Energy Florida has permitted the looping of wholesale-customer Delivery Points under limited circumstances Seminole is strongly encouraging Duke to permit looping of cooperative Delivery Points Seminole is strongly encouraging Duke to develop a written Looping Criteria Guideline document to assure equity of treatment

DUKE ENERGY FLORIDA If Duke agrees to loop delivery points: Duke must role the costs into the Rate Base Duke must develop rules & regulations on how looping will be done

DUKE ENERGY FLORIDA Duke Risk A transmission customer may challenge the looped facilities are “Gold Plated” reliability and should not be paid by all transmission customers. If Duke were to lose such a challenge, Duke shareholders may be on the hook to pay for all such loop facilities

DUKE ENERGY FLORIDA Possible Duke requirements: Ownership of transmission line continuity Duke owned transmission circuits (in & out) Duke owned substation facilities (in series with line) Duke standards for design/construction Duke Facility Ratings Duke approves all future connections and modifications Duke approves all maintenance and switching operations

DUKE ENERGY FLORIDA Under limited circumstances, Members may be permitted to perform necessary construction of Duke facilities (as a Duke contractor) If existing cooperative owned line/substation facility is to be used to complete the transmission loop, Duke may buy facilities or pay credits for use of facilities

DUKE ENERGY FLORIDA

Looped Substation Configurations FECA Engineers Conference Looped Substation Configurations Glenn Spurlock June 10, 2013 June 10, 2013

Single Bus Configuration The single bus substation configuration is the simplest of configurations, but is also the least reliable. In the arrangement shown, the circuit must be de-energized to perform breaker maintenance, which can be overcome by the addition of breaker bypass switches, but this may then disable protection systems.

Single Bus Configuration Advantages & Disadvantages Single Bus Advantages: • Lowest cost • Small land area • Easily expandable • Simple in concept and operation • Relatively simple for the application of protective relaying Single Bus Disadvantages: • Single bus arrangement has the lowest reliability • Failure of a circuit breaker or a bus fault causes loss of entire substation • Maintenance switching can

Sectionalized Bus Configuration The sectionalized bus configuration is merely an extension of the single bus layout. The single bus arrangements are now connected together with a center breaker that may be normally open or closed. Now, in the event of a breaker failure or bus bar fault, the entire station is not shut down. Breaker bypass operation can also be included in the sectionalized bus configuration.

Sectionalized Bus Configuration Advantages & Disadvantages Sectionalized Bus Advantages: • Flexible operation • Isolation of bus sections for maintenance • Loss of only part of the substation for a breaker failure or bus fault Sectionalized Bus Disadvantages: • Additional circuit breakers needed for sectionalizing, thus higher cost • Sectionalizing may cause interruption of non-faulted circuits

Main & Transfer Bus Configuration A main and transfer bus configuration means there are two separate and independent buses; a main and a transfer. Normally, all circuits, incoming and outgoing, are connecting the main bus. If maintenance or repair is required on a circuit breaker, the associated circuit can be then fed and protected from the transfer bus, while the original breaker is isolated from the system.

Main & Transfer Bus Configuration Advantages & Disadvantages Main and Transfer Bus Advantages: • Maintain service and protection during circuit breaker maintenance • Reasonable in cost • Fairly small land area • Easily expandable Main and Transfer Bus Disadvantages: • Additional circuit breaker needed for bus tie • Protection and relaying may become complicated • Bus fault causes loss of the entire substation

Ring Bus Configuration The ring bus configuration is an extension of the sectionalized bus. In the ring bus, a sectionalizing breaker has been added between the two open bus ends. Now there is a closed loop on the bus with each section separated by a circuit breaker. This provides greater reliability and allows for flexible operation. The ring bus can easily adapted to a breaker-and-a-half scheme, which will be looked at next.

Ring Bus Advantages & Disadvantages Ring Bus Advantages: • Flexible operation • High reliability • Double feed to each circuit • No main buses • Expandable to breaker-and-a-half configuration • Isolation of bus sections and circuit breakers for maintenance without circuit disruption Substation Configuration Reliability 7 Ring Bus Disadvantages: • During fault, splitting of the ring may leave undesirable circuit combinations • Each circuit has to have its own potential source for relaying • Usually limited to 4 circuit positions, although larger sizes up to 10 are in service. 6 is usually the maximum terminals for a ring bus

Breaker-and-a-Half Configuration A breaker-and-a-half configuration has two buses but unlike the main and transfer scheme, both busses are energized during normal operation. For every 2 circuits there are 3 circuit breakers with each circuit sharing a common center breaker. Any breaker can be removed for maintenance without affecting the service on the corresponding exiting feeder, and a fault on either bus can be isolated without interrupting service to the outgoing lines. If a center breaker should fail, this will cause the loss of 2 circuits, while the loss of an outside breaker would disrupt only one. The breaker-and-a-half scheme is a popular choice when upgrading a ring bus to provide more terminals.

Breaker-and-a-Half Configuration Advantages & Disadvantages Breaker-and-a-Half Advantages: • Flexible operation and high reliability • Isolation of either bus without service disruption • Isolation of any breaker for maintenance without service disruption • Double feed to each circuit • Bus fault does not interrupt service to any circuits • All switching is done with circuit breakers Breaker-and-a-Half Disadvantages: • One-and-a-half breakers needed for each circuit • More complicated relaying as the center breaker has to act on faults for either of the 2 circuits it is associated with • Each circuit should have its own potential source for relaying

Double Breaker-Double Bus Configuration Like the breaker-and-a-half, the double breaker-double bus configuration has two main buses that are both normally energized. Here though, each circuit requires two breakers, not one-and-a-half. With the addition of the extra breaker per circuit, any of the breakers can fail and only affect one circuit. This added reliability comes at the cost of additional breakers, and thus is typically only used at large generating stations.

Double Breaker-Double Bus Advantages & Disadvantages Double Breaker-Double Bus Advantages: • Flexible operation and very high reliability • Isolation of either bus, or any breaker without disrupting service • Double feed to each circuit • No interruption of service to any circuit from a bus fault • Loss of one circuit per breaker failure • All switching with circuit breakers Double Breaker-Double Bus Disadvantages: • Very high cost – 2 breakers per circuit

Comparison of Bus Configuration Costs If one assumes that the Single Bus configuration costs $100k, then the math can easily be done by using the relative cost comparison.

Questions?