US 50 SLOPE STABILIZATION PROJECT NDOT # 3433 US 50 SLOPE STABILIZATION PROJECT GLENBROOK, NEVADA LAKE TAHOE - 2012
INTRODUCTION: US 50 SLOPE STABILIZATION WATER QUALITY PROJECT WHAT IS A VRSS? HISTORY OF THE VRSS DESIGN LIFE - 80 YEAR CONSTRUCTION CONSIDERATIONS Q&A
DESIGN:
DESIGN:
DESIGN:
STEP # 1
STEP # 2
STEP # 3
STEP # 4
STEP # 5
STEP # 6
STEP # 7
CLEAR & GRUB SLOPES:
SLOPE EXCAVATION:
ANCHOR LAYOUT:
DRILLING:
GROUTING:
TESTING:
BENCHING THE SLOPE:
ANCHOR INSTALLATION COMPLETE:
VRSS CONSTRUCTION:
WALL ALIGNMENT:
BACKFILL:
ANCHOR / PIPE CONNECTION:
COCONUT / HYDROSEED MAT:
TELEBELT MATERIAL HANDLER:
LOTS OF STUFF:
STARTING TO CLIMB:
TOUGH ACCESS:
SLOPE DRAIN:
MICRO-TERRACE TIE-IN:
FINISHED SLOPE:
CONSTRUCTABILITY / LESSONS LEARNED: 1.) ACCESS / SAFETY 2.) HEIGHT OF SLOPE 3.) BENCHING MATERIAL / WIDTH 4.) SOIL TYPE 5.) TESTING FREQUENCY / SCHEDULE 6.) MATERIAL SELECTION
Q & A: