Ensure to use the right tools and equipment for the activity

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
Always comply with Defensive driving techniques
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Always ensure travelling block is stationary during DM changeover
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
PDO Second Alert Valves open Valve closed Valves open Valve open
Ensure all safety covers and guards are secured and in place
Maintain 3 point contact when you climb Ladder
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always ensure a stable position when working at height!
Always wear fall protection equipment when working at height
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Always follow Night driving rules
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
PDO Second Alert Always follow the PTW procedures
Photo explaining what was done wrong
Safety Critical Devices can Save the Lives & Protect Asset
Pay attention to your footing
Unsecured pup joint falling
PDO Second Alert Date: Incident: LTI What happened?
Always report Near Misses
Do not stand in the LINE OF FIRE
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
Your health is your responsibility
Always ensure “no go” zone are in place
Check equipment prior to start the job
Always ensure your journey is authorised
Always be vigilant while moving across well site location
Seek assistance of Banksman while reversing the vehicle
Use only certified lifting equipment in good condition
Always intervene an unsafe act
PLAN AND DOCUMENT CHANGES TO THE OPERATION
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Ensure to use the right tools and equipment for the activity PDO Second Alert Date: 30.09.2017 Incident: LTI What happened? A Civil crew was engaged in excavation for 30” via GRE piping. While digging the trench from 2.4m to 2.9 m depth, a part of the trench wall collapsed and fell on the ground worker who was using the jack hammer. Some soil fell on the other two crew members who were also working inside the trench. One of them was diagnosed with Pelvic fracture and other was diagnosed with minor contusion on right knee. Your learning from this incident.. Always comply with procedures & apply MOC for any deviation. Use Empowerment to STOP work policy if the work and site conditions are unsafe. Always Intervene unsafe acts and behavior Escalate safety concerns to the management. worker. Always use the appropriate methods/tools for gaining height for the activity. Stable platform Ensure to use the right tools and equipment for the activity

Management self audit Date: 30.09.2017 Incident: LTI As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you conduct constructability review for design deliverables? Do you ensure that your team members identify all opportunities to manager change effectively? Do you ensure that the inspection for Excavations and other activities are carried out effectively? Do you actively drive empowerment to stop policy? Do you ensure that the planned work is realistic & achievable? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.