FINANCING URBAN TRANSPORT INFRASTRUCTURE. Presentation Structure Urban Scenario Investment Needs Financing Structure Financing Options.

Slides:



Advertisements
Similar presentations
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Advertisements

Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
Taxation and Infrastructure Financing
U.S. Russia Energy Efficiency Workshop November 17, 2010 Public Sector Energy Efficiency Financing Presenter – Amy Chiang, VP Global Energy Government.
Innovation: User Support Terminals. Built around existing integration terminals Combine social services, shopping, banking, etc. Provide service access.
Metropolitan Transportation Authority November 2008 Financial Plan /15/ :22 AM 1 Metropolitan Transportation Authority November 20,
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
1 MAXIMIZING PUBLIC INVESTMENT Ohio Department of Transportation Highway Funding Overview Julie Ray, Deputy Director Division of Finance & Forecasting.
Development of Bus Rapid Transit (BRT) in Africa Experience from Lagos, Accra and Kampala.
1 The Role of Bus Transit in the Regional Transportation, Present and Future Howard Benn, Chair, TPB Regional Bus Subcommittee TPB Regional Priority Bus.
West Michigan Transit Linkages Study Wednesday, June 4 th, :00 a.m. Grand Valley State University Kirkhof Center Conference Room 2266.
Susheel Kumar, I.A.S. Joint Secretary, Ministry of Housing and Urban Poverty Alleviation Government of India 1.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
Second Annual Conference on Intra-City Transportation Systems
Technical Workshop on Tools and Measures to Inform Inclusive Green Economy Policies 2-4 July 2013 UNEP Joy A. Kim.
The UK Development Footprint in India – Urban Sector February 24, 2014.
Public Transport’s Contribution to Sustainable Development.
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.
Summary of Conference Proceedings Prof H. M. Shivanand Swamy CEPT University September 8, 2012 Ahmedabad Management Association.
Briefing on a Cost-Benefit Analysis Framework for Transit Investments in the Washington Region David Lewis Ph.D. Chief Economist HDR|Decision Economics.
Ministry of Urban Development Government of India C K Khaitan JS (Urban Transport) 29th Jan Inputs on Urban Infrastructure Development in India.
White Paper 2011 and Development Perspectives of Transport System in Latvia Guntars Jansons Manager Development Planning.
Improving the Urban Public Transport in Developing Countries: The Design of a New Integrated System in Santiago de Chile Antonio Gschwender
Cross-Border Infrastructure: A Toolkit Mass Transit: Comparison of Bangkok & Kuala Lumpur Session on Private Sector Participation Yong Hee Kong PPP Resource.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
Dr Lina Shbeeb Minister of Transport. Jordan
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
Non-conventional Financing in Public Transport Francis Cheung AVV Transport Research Centre Ministry of Transport, Public Works and Water Management The.
Five-Year Mass Transit Fund Financial Forecast April 6,
Viability Gap Funding By Ashok Chawla Additional Secretary Department of Economic Affairs, Government of India 20 th December, th December, 2006.
Urban Transport -How to address the commercial road blocks Urban Transport Congress India 2010, Mumbai 25 th June, 2010 Brijgopal Ladda, Head – CRISIL.
ROLE OF DIFFERENT STAKEHOLDERS AND HYBRID FINANCIAL MECHANISM OF MHI Public Private Partnerships or PPPs as Means of Financing Infrastructure in MHI Projects.
Urban Transport in India: Governance Challenges Jessica Seddon, Ph.D. Okapi Research & Advisory Chennai, Tamil Nadu, India
1 India - Opportunities in Infrastructure for Foreign Investors Arvind Mayaram Department of Economic Affairs Ministry of Finance Government of India.
Managing Director/CEO
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Calgary Regional Partnership Workshop BC Transit Governance and Funding Experience Bill Lambert, Manager, Transportation Solutions, April 16, 2013.
Urban Transport in the Developing World. Elements of Urban Transport Sector Urban public transport: Urban public transport: On-street systems (for buses,
Financing Urban Public Infrastructure
AFD’s strategy of intervention towards Sustainable Urban Transport in China Herve Breton AFD Shanghai Nov.2008.
CROST FOR LONDON Presentation to GLA and TfL Thursday 4th Dec. By CROST Group.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
INDIA’S INFRASTRUCTURE – Issues and Prospects PRESENTATION BY SS Kohli Chairman & Managing Director INDIA INFRASTRUCTURE FINANCE COMPANY LTD NEW DELHI.
Sustainable travel for Limerick and Area By Professor Lewis Lesley.
Jeff’s slides. Transportation Kitchener Transportation Master Plan Define and prioritize a transportation network that is supportive of all modes of.
1 Veolia Transport Growing with Public Private Partnerships (PPP) An alternative financing solution.
CREW Project Research Findings of Diagnostic Country Report (DCR), Ghana Bus Transport Sector.
PUBLIC TRANSPORT IN SKOPJE: NEW APROACH FOR BETTER QUALITY OF SERVICE
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Projectsunder JnNURM Scheme Construction of traffic transit management centres Procurement of buses.
Civil and Environmental Engineering 1 Norway’s toll rings: Full scale implementations of urban pricing Dr. Terje Tretvik - SINTEF, Norway IMPRINT-EUROPE.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Transportation and the CDM: Key Issues & Potential Case Studies March 14, 2003 Winnipeg.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
New Government Policy on Energy Efficiency By Subodh Kumar Scientist Central Road Research Institute New Delhi ,
CAI-Asia is building an air quality management community in Asia Investment Implications of the Action Plan Sustainable Urban.
Regional Transportation Council Mobility Plan Workshop North Central Texas Council of Governments November 12, 2015.
Facilitation of use of green transport - electromobility Ministry of Transport Ministry of environmental protection and regional development of the republic.
Big Opportunities in India Million New Urban Residents by 2030.
Social cost benefit analysis of Delhi Metro
The Gauteng Economic Indaba Transport and Logistics Mr Piet Sebola Group Executive Strategic Asset Development Date: 09 th June 2016.
Challenges and solutions for transport in Norway
FINANCING URBAN TRANSPORT INFRASTRUCTURE: INDIA
Long term strategy and structure
Moving India forward Urban Infrastructure: Challenges & Policy Options for Low Carbon Mobility Amit Bhatt, Director, Integrated Transport.
Blended Finance Options for Local Development
Presentation transcript:

FINANCING URBAN TRANSPORT INFRASTRUCTURE

Presentation Structure Urban Scenario Investment Needs Financing Structure Financing Options

Urban Scenario

Urban population in India increased from 62 million in 1951 to 377 million in In 2011, 3 cities with a population greater than 10 million and 53 cities with a population greater than 1 million. By 2031, it is projected that there will be 6 cities with a population greater than 10 million. Rapid Rate of Urbanization

. IIHS Urban India 2011: Evidence Source: Road Transport Year Book ( & ). Ministry Of Road Transport & Highways Government Of India New Delhi From 2001 to 2011, the annual growth of population 1.6%, but motor vehicles increased by almost 10% Average vehicle speed during peak hour in many Indian cities is as low as 10 kmph Rapid Motorization

Urban transport is the single most important component instrumental in shaping urban development and urban living. National Commission on Urbanization (NCU)

Investment Needs

Investment Needs – Next 20 years StudyTotal Investment for Services Investments in Transport Infratsructure Investment in Mass Transit Investment in Road Mckinsey Global Institute (2007) Rs 53 lakh crs. Rs 27 lakhs Crs (51%) Rs 18 lakh crs.Rs 9 lakh crs. High Powered Expert Committee (HPEC) Rs 39 lakh crs. Rs 22 lakhs Crs (56%) Rs 5 lakh crs.Rs 17 lakh crs. The total expenditure on roads and urban transport together out of the total expenditure is about same order (as a percentage) as the Mckinsey estimate. However, there is a major difference in the estimate for roads vis-a-vis urban transport.

Key Issues Affecting Investment In Urban Transport High Capital and Operation cost Long Gestation Period Project Viability User Charge Fare Revision Cost Recovery Demand Risk Social Linkages Macro economic policies

Financing Structure

National Level – 12 th Five Year Plan State level – State Budgets City Level - Municipal Budgets

To create an effective institutional framework to manage investments Capacity building of State & City Officials Create walking & Cycling facilities Augment public Transport Improve accessibility and mobility Provide grade separated entries and by passes for through traffic Improve road safety Use of technology for multimodal integration, safety etc Promote research in guided transport 12 th Five Year Plan - Goals

Sources for the total investment A total of Rs 3,88,308 cr is estimated to achieve the goals of the 12 th 5 year plan Source Rs (in Crores) Central Government85,843 State Government/ Development Authorities1,07,585 Property Development5,268 Private Sector1,35,560 Debt from Multilateral/ Bilateral institutions31,606 Debt from domestic financial institutions22, th Five Year Plan - Investments

State Budgets In 11 th Plan – of the total investment state share was 32.6% 12 th Central Finance Commission recommended to augment Consolidated Fund of the State to supplement resources of panchayats and municipalities Sources of Investment

Financing Options

Financing options Public Financing Schemes Private Sector Investments Multilateral Investments Innovative Financing Mechanisms Financing Sources

Jawaharlal Nehru National Urban Renewal Mission (JnNURM) Urban infrastructure Development Scheme for Small & Medium Towns (UIDSSMT) Viability Gap Funding (VGF) Central Assistance for doing Technical Studies like CMP, Metro DPRs etc. Central Schemes

Advantages Easing Budgetary Constraints Improved Value For Money Sharing Of Risks Between Public & Private Partners Reduction In Cost Of The Project Main sources of Private Sector Funding Debt Equity PPP Private Sector Funding

PPP Options Rigorous project preparation Delivery of whole life solution Focus shifts to service delivery Time bound implementation plan Better overall management of public services Key Benefits of PPP

Examples – Metro Projects Metro Link Concessioni ng Authority Concessionaire Total Cost (Rs./Crore) VGF (Rs./Crore) Concession Period Delhi Metro Airport Link DMRC Reliance Infrastructure Limited Years Mumbai Metro Line-1 MMRDA Reliance Energy Limited Years Mumbai Metro Line-2 MMRDA Reliance Energy Limited Years Gurgaon Metro Rail Link HUDADLF & ILFS Limited Years Hyderabad MetroHMRLL&T Metro Rail Years

Examples – Bus Operations Indore City Bus Service Bhopal City Bus Service Rajkot City Bus Service Surat City Bus Service Bhubaneswar – Puri City Bus Service Ahmedabad BRT operations Delhi Bus Service

Case Study: Bus Operations – Indore ( Atal Indore City Transport Services Limited) Before City Bus- Unorganised Transport

About AICTSL Inception in 2006 with a seed capital of Rs. 5 million. Adopted the net-cost based PPP model of bus operations… widely copied in other cities across India. Started with 37 buses with 4 operators. Installed vehicle tracking systems on the entire fleet, that is the best in the country even till date. Initiated the BRT project in Indore which is in the final stage of implementation. Funding from JnNURM allowed modernising the fleet with CNG buses that have electronic displays and voice announcement systems.

Private operator responsibilities: Owns, operates & maintains fleet Collects fare from passengers Pays premium to AICTSL for right to operate on route PPP Model of Bus Operations Public partners role: Planning of routes Inviting tenders for bus operations Providing support infrastructure Objective: Providing affordable & quality public transport Safety & Quality has helped attract trips from private travel modes

Lives saved due to Indore City Bus::6 /year (0.024 fatalities/mill PKT * 0.64 mill PKT per day * 365 days) Hundreds of accidents avoided. CO2 Reduced~5.5 ton/day Lives Saved, Emissions Reduced

Challenges CNG fuel prices have increased by 64% in 24 months, thus reducing profitability to operators AICTSL has limited financial resources (premium from operators, advertising) for additional infrastructure Passenger ridership per bus has increased only marginally, not keeping pace with input costs Modernising the system by way of better workshop infrastructure, improved information for passengers and customer service is necessary for expanding the system.

Multilateral Development Banks (MDBs) Multilateral development banks (MDBs) provide finance for investments in human and physical capital that promote development. MDBs assist in Urban Transport Funding through the following: Loans Grants The Global Environment Facility (GEF) Clean Development Mechanism (CDM)

The issue of urban transport financing has become increasingly prevalent in recent years as costs of providing transport services have expanded more rapidly than traditional revenue resources. The National Urban Transport Policy of April 2006 also lays emphasis on the innovative use of land as a resource for financing public transport projects. Urban Transport Fund Financing Through Cross-Subsidy Projects Property Development Land Value Capture Kiosks and Shops at Stations Taxes and Fiscal Incentives Cross Subsidy Innovative Financing Mechanism

Examples- Innovative Financing Scheme Non Fare Box Revenue Sl. No.Project Name Farebox Revenue (%) Non Fare Box Revenue (%) 1Singapore Metro8911 2Bangkok Metro8812 3London Metro8317 4Washington Metro7723 5New York Metro7030 6Hong Kong Metro3763

Case Study- BRTS Project – PCMC PCMC has planned for 10 BRT routes for quick and effective transit and the cost for the first phase is about Rs crore PCMC has set up an Urban Transport Fund (UTF), managed by an SPV, PCMC Infrastructure Company Ltd (PICL), to finance its share of the BRT project.

Urban Transport Fund – Pimpri Chinchwad 100 metres on both sides of the corridor have been earmarked as the BRT Influence Zone PCMC has raised the FSI in the influence zone from 1 to 1.8 with the added FSI of 0.8 being achieved through loading of TDR. Based on the total influence zone area along the 60 km BRTS corridor, additional 0.8 FSI permissible in the influence zone, the project can generate close to 5000 Crs of revenue TDR Potential TDRs (mn sqft) Revenue from TDR use (Rs.cr) Max potential, assuming absorption in 80% of influence zone

Case Study-The TTMC Concept BMTC developed the innovative concept of Traffic and Transit Management Centres (TTMCs) The TTMC concept combines the development of passenger terminals with the creation of commercial real estate space. Revenue from rent of the commercial real estate space would cross subsidise the construction cost of the passenger terminal and amenities, and also form a source of continuing additional revenue for the corporation. Implementation 10 TTMCs have been constructed since 2009 Initial funding was provided by JNNURM

Thank You!