CityBus Reliability Jimmy Khorshid – Daniel Richards – Nick Saraniecki – Richie Schultz –

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Repaso: Unidad 2 Lección 2
1 A B C
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Variations of the Turing Machine
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Select from the most commonly used minutes below.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2013 Elsevier Inc. All rights reserved.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Objectives: Generate and describe sequences. Vocabulary:
David Burdett May 11, 2004 Package Binding for WS CDL.
Local Customization Chapter 2. Local Customization 2-2 Objectives Customization Considerations Types of Data Elements Location for Locally Defined Data.
Custom Services and Training Provider Details Chapter 4.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Year 6 mental test 15 second questions Calculation Addition.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Media-Monitoring Final Report April - May 2010 News.
Student & Work Study Employment Facts & Time Card Training
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
MM4A6c: Apply the law of sines and the law of cosines.
1 The Royal Doulton Company The Royal Doulton Company is an English company producing tableware and collectables, dating to Operating originally.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
TESOL International Convention Presentation- ESL Instruction: Developing Your Skills to Become a Master Conductor by Beth Clifton Crumpler by.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Artificial Intelligence
Before Between After.
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Let’s take a 15 minute break Please be back on time.
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
famous photographer Ara Guler famous photographer ARA GULER.
PSSA Preparation.
Physics for Scientists & Engineers, 3rd Edition
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
1 Dr. Scott Schaefer Least Squares Curves, Rational Representations, Splines and Continuity.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

CityBus Reliability Jimmy Khorshid – Daniel Richards – Nick Saraniecki – Richie Schultz –

Project Objective To determine the reliability of the following bus routes: – Gold/Silver/Bronze Loops – Tower Acres – Ross Ade

Site Location The site location is Purdue University We will collect data from two bus stop locations: – University & 3 rd – Class of 50

Data Collection Plan Each group member sat at one bus stop for one hour At the Class of 50 stop we collected data for the Gold, Silver, and Bronze loops At University & 3 rd street we collected data for the Ross Ade and Tower Acres loops We used watches that have been calibrated to the time.gov website We recorded the arrival time of each bus at each stop

Gold Loop Results Class of 50 Gold Loop ScheduledActualΔ 11:00 AM10:57 AM-3 11:20 AM 0 11:25 AM 0 11:30 AM11:32 AM2 11:50 AM 0 11:55 AM11:50 AM-5 12:00 PM12:04 PM4 1:30 PM 0 LOST1:35 PM5 1:50 PM1:47 PM-3 1:55 PM1:58 PM3 2:00 PM1:59 PM 2:20 PM2:19 PM

Gold Loop Analysis On time 4 of 13 buses Largest off schedule time was (+/-) 5 minutes 2 buses showed up at 11:50 AM and 1 left on time at 11:55 AM. – This is acceptable for people at this bus stop, but is far off schedule for the rest of the bus stops on the loop There was an extra bus at 1:35 PM

Silver Loop Results Class of 50 Silver Loop ScheduledActualΔ 10:59 AM11:01 AM2 11:04 AM11:06 AM2 11:09 AM11:19 AM10 11:19 AM11:20 AM1 11:24 AM11:23 AM1 11:29 AM11:31 AM2 11:39 AM11:38 AM1 11:41 AM11:40 AM1 11:44 AM11:45 AM1 11:49 AM11:51 AM2 11:59 AM 0 1:29 PM 0 1:39 PM 0 1:41 PM1:45 PM4 1:44 PM1:48 PM4 1:49 PM1:48 PM 1:59 PM1:58 PM 2:01 PM1:58 PM-3 2:04 PM2:00 PM-4 2:09 PM2:06 PM-2 2:19 PM2:17 PM-2 2:21 PM2:20 PM 2:24 PM2:22 PM-2

Silver Loop Analysis Most buses per hour Because the buses come so often they sometimes come in as groups of 2 buses at a time – This causes a bus to occasionally miss a stop causing long delays On time only 3 of 23 times, but off by 1 minute 8 of 23 times

Bronze Loop Results Class of 50 Bronze Loop ScheduledActualΔ 11:22 AM11:21 AM 11:52 AM11:53 AM1 1:52 PM1:51 PM 2:22 PM2:19 PM-3

Bronze Loop Analysis This bus only came every half hour This caused us to not have a lot of data for much discussion From the limited data the Bronze loop seemed to be fairly on time every time

Tower Acres Beering Stop Tower Acres ScheduledActual Δ 3:00 PM3:03 PM3 3:15 PM3:17 PM2 3:23 PM3:21 PM-2 3:30 PM 0 3:45 PM3:49 PM4 3:53 PM3:51 PM-2 4:00 PM 0 2:00 PM2:02 PM2 2:15 PM2:18 PM3 2:23 PMDidnt Come10 2:30 PM2:33 PM3 2:45 PM2:37 PM-8 2:53 PM2:48 PM-5

Tower Acres Analysis Only on time twice 7 of 13 times they were greater than 2 minutes early or late One bus didnt arrive causing a 15 minute gap between buses when it should have only been 5 minutes According to data, unreliable half of the time

Ross Ade Beering Stop Ross Ade ScheduledActual Δ 3:05 PM3:07 PM2 3:15 PM3:14 PM 3:25 PM3:27 PM2 3:35 PM3:30 PM-5 3:45 PM3:44 PM 3:55 PM3:50 PM-5 4:05 PM4:06 PM1 2:05 PM2:09 PM4 2:15 PM2:19 PM4 2:25 PMDidnt come12 2:35 PM2:37 PM2 2:45 PM2:41 PM-4 2:55 PM3:05 PM10

Ross Ade Analysis Never exactly on time Arrived 10 minutes or later twice 6 of 13 buses were within 2 minutes of expected time One bus didnt arrive which resulted in an 18 minute gap between buses Most unreliable loop studied

Example Data Results The chart below totals the entire data It compares the total percentage on time We consider on time by being within plus or minus 1 minute of the expected time

Interpretation of Results Based on our criteria of on time or not we have concluded that: – Reliable: Silver and Bronze Loops – Unreliable: Tower Acres and Ross Ade – More data is needed to find a clear pattern for the Gold Loop to determine if it is reliable or not We found multiple times within the limited data that the buses were bunched up or completely missing scheduled stops Due to congestion in the Memorial Mall we feel the buses are getting off schedule We think that Tower Acres and Ross Ade can skip the mall and drop passengers off at the Beering stop