24 Oct 2002 RFP Review1 DFBX Fabrication Activity at LBNL Jon Zbasnik LBNL.

Slides:



Advertisements
Similar presentations
Xenon Detector Status Liquid Xenon Group. 1 Outline Cryostat construction –Honeycomb panel test at Pisa –Assembly –Cryogenic test at SIMIC –Leak test.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
AMS-02 Cryosystem Phase III Flight Safety Review January 12, 2010 Phil Mott.
Coupling Coil Test Facility Update Ruben Carcagno Fermilab September 20, 2012.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
Spectrometer Solenoid Design and Procurement Review Steve Virostek Mike Green Mike Zisman Lawrence Berkeley National Lab MICE Collaboration Meeting October.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Cryostat Production Readiness Review January 23, 2002 T. Nicol – Fermilab
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
WUT Experience in Measurements of the Heat Transfer Thought SC Cable Electrical Insulation Jaroslaw Polinski*, Maciej Chorowski*, Michal Strychalski*,
Spectrometer Solenoid Update Steve Virostek Lawrence Berkeley National Lab Roy Preece Rutherford Appleton Lab October 28, 2011 MICE Collaboration Meeting.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
Status and Integration of the Spectrometer Solenoid Magnets Steve Virostek Lawrence Berkeley National Lab MICE RAL June 15, 2007.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
24 January 2014 LARP VTF Follow-up Meeting P. Kovach VTF 1 LARP Vertical Test Facility Vertical Dewar Design, Magnet Prep And Installation Paul Kovach.
1 LHC-DFBX DFBX Production Readiness Review Project Overview Joseph Rasson LBNL October 2002, LBNL Brookhaven - Fermilab - Berkeley US LHC ACCELERATOR.
FNAL Cavities for S1 Global Jim Kerby ALCPG 09. FNAL Deliverables Discussed in meetings 15/16 July and 10/11 Sept, and Webex and s 9/30/20092FNAL.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
Key Design Issues and Recent Reviews Tom Peterson, Fermilab DFBX PRR, October 23, 2002 US LHC ACCELERATOR PROJECT brookhaven - fermilab - berkeley.
Superconducting IR Magnets CHEN, Fusan May 11, 2007.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Endcap Signal Feedthrough Overview Endcap Signal Feedthroughs are constructed and tested in Victoria by Victoria and TRIUMF staff. Each feedthrough unit.
MICE Coupling Coil Testing at Fermilab All Experimenters Meeting Ruben Carcagno March 19, R. Carcagno - MICE CC Testing at Fermilab3/19/2012.
MICE RF Coupling Coil Magnets Update Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory October 6, 2010 Sofia, Bulgaria.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
MICE Prototype Coupling Coil Fabrication Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM38 - Napa California February 25, 2014 February.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
DOE-QRT Review 12 Feb2004 Joseph Rasson LHC Project Update1 Joseph Rasson LBNL DOE LHC Quarterly Status Meeting at FNAL 12 February 2004 US LHC ACCELERATOR.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Cryogenic Summary - K. C. Wu Testing D2L102 in MAGCOOLJune, 02 Difference between D2L102 and D2L101 Operating Summary Cooldown to 100 K and 6 K Test Condition.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
HiLumi-LARP Annual Meeting November 2014 MQXF pre-series and series magnets fabrication plans Ruben Carcagno November 19,
1 MQXF(S) Magnet Interface Document MQXF(S) magnet interface document will describe electrical connection between the magnet and the header assembly Scope.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
1 BNL LHC Hi-Lumi QXF Vertical Test Facility Status Update M. Anerella, H. Hocker, P. Joshi, P. Kovach, A. Marone September 25, 2015.
Development of Cryo-Module Test Stand (CMTS) for Fermi Lab (R.L.Suthar, Head,CDM, BARC) Cryo-Module Test stand (CMTS) is a very sophisticated equipment.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
S A Griffiths CM42 June 2015 Electrical & Control.
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
Teleconf ACS – FREIA 28th March 2017
12 GeV Project Status Glenn R. Young 12 GeV Project Status
Considerations from machine protection and the ELQA teams
QXF Coil Fabrication & Tooling Reaction / Impregnation
at STFC Daresbury laboratory
Ti/SS transitions A.Basti INFN-PISA*
HFM Test Station Main Cryostat
LEP cryostat Procurement strategy and plans
Status of design and production of LEP connection cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
LARP Vertical Test Facility
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
HO Corrector Magnets: decapole test and future plans
MICE Coupling Coil Update
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Cryomodule Assembly Plan
Teleconference ACS – FREIA 19th June 2017
UPPSALA UNIVERSITY_GERSEMI PROJECT
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

24 Oct 2002 RFP Review1 DFBX Fabrication Activity at LBNL Jon Zbasnik LBNL

24 Oct 2002 RFP Review2 Contents of Presentation Present the Items to be fabricated at LBNL –Bus Duct Assemblies –Beam Tube Assemblies –Instrumentation Duct Assemblies For each Item will address –Requirements –Readiness Summary –Fabrication/Acceptance Outline

24 Oct 2002 RFP Review3 Items to be fabricated at LBNL Bus Duct Assemblies –8 each MQX, LBNL Dwg 25M857 –4 each MBX1, LBNL Dwg 25M859 Beam Tube Assemblies –4 span Q3 to cold D1, LBNL Dwg 25I855 –4 span Q3 to CERN Cold to Warm Transition Instrumentation Bus assemblies –8 each MQX2 (100 wires), LBNL Dwg. 25I301 –4 each MBX2 (22 wires), LBNL Dwg. 25I219

24 Oct 2002 RFP Review4 Bus Duct Requirements (1) Current Rating for MQX1 –4 each 7500 A busses –24 each 600 A busses Current Rating for MBX1 –2 each 7500 A busses Voltage Rating –7500 A busses 1500 Vdc in STP helium, 5 kV in air –600 A busses 600 Vdc in STP helium, 2.5 kV in air –Voltage is applied to single bus with all others at ground –Leakage current less than 20 x A after 1 min at voltage

24 Oct 2002 RFP Review5 Bus Duct Requirements (2) Leak Rate across Lambda Plug –Less than 0.1 atm cc/sec (helium) at room temperature –measured at a pressure differential of 0.7 atm or more 20 bar pressure rating on magnet side 3.5 bar pressure rating on DFBX side Operational Requirements –Leak Rate satisfied after 50 thermal cycles (verified in R&D) –Leak Rate satisfied after 25 pressure pulses to 20 bar (verified in R&D) –Bus bars must be stable and safe against quenching Use FNAL-developed main quadrupole busses Use CERN corrector bus wire, also used by FNAL in the inner triplets

24 Oct 2002 RFP Review6 MQX1 Bus Duct Assembly Configuration delivered to Vendor is shown –Protective Pipe (yellow) over DFBX Conductors O-ring seal to lambda flange Pumping/Test Port –Orange Piping Connects to Q3 –Helicoflex seal on Stub –Endcap on bellows Bellows restraint Pumping/Test Port Tooling Ball Feature

24 Oct 2002 RFP Review7 Bus Assembly Fabrication Readiness Lambda Plug R&D (with short conductors) is complete –R&D Plugs meet requirements –Design is finalized and verified –Plug potting process is finalized and gives stable results –Closeout and installation welding was simulated –Approved in 4 Sept 2002 review at LBNL Preliminary fabrication plan is outlined Development of fixtures to handle long conductors will start in November Final detail design is underway Fabrication start is dependent on insulated corrector bus

24 Oct 2002 RFP Review8 Lambda Plug R&D Results Notes: a. An excessive amount (1000 g) of epoxy was mixed and the exothermic heat generated caused the epoxy to harden before the plug was filled. b. No change in leak rate due to welding. c. We have evidence that the leak rate increased upon welding. We will check this carefully in PG-6d. d.Thermal cycling is done by plunging the assembly into a bath of LN 2, held for 1 hr, then pulled out and warmed in air for 1 hour, etc. e. Breakdown is not between nearest neighbors, so it may be due to the test setup. We are checking this.

24 Oct 2002 RFP Review9 Bus Duct Fabrication Plan (1) Outline is presented in the reviews URL Potting of long conductors into the stainless steel flange will be done by Supercon techs –They developed the process details –They demonstrated that the process was stable in the R&D program

24 Oct 2002 RFP Review10 Bus Duct Fabrication Plan (2) The Bus Duct will be completed by Techs in the B 77 area –They have performed all welding in the successful R&D program –They have performed all leak and pressure testing in the R&D program –Performed hipot testing for other programs Detailed procedures and fixtures to be worked out in Nov/Dec –We anticipate that only orbital welds will be needed

24 Oct 2002 RFP Review11 Bus Duct Acceptance Testing Thermally cycle bus duct 2 to 5 times to LN temp Pressure Test magnet side to 370 psig ( warm & cold) leak rate through lambda plug less than 0.1 atm cc/sec (helium) –(both directions) Leak check magnet piping, –leak rate to be less than 1 x std cc/sec (helium) Hipot test –5 kV dc (air), with less than 20 microamps leakage after 1 minute –2 kV dc (helium on magnet side), with less than 20 microamps leakage Dimensions are within tolerance Conductors are properly labeled

24 Oct 2002 RFP Review12 Bus Duct Production Schedule Supply of Corrector Bus is on Critical Path Other parts are readily available –Cable conductors are at FNAL –Bellows on hand at FNAL –G-10CR Insulator Blocks are machined –Weldneck flanges are on hand, 2 more need to be ordered –Elbows are standard, some on hand –Pipe sections readily available –Helicoflex seals and clamps need to be ordered LBNL Manpower is available to do the job

24 Oct 2002 RFP Review13 Beam Tube Requirements Bore to be cleaned per LBNL UHV Cleaning Spec Cooling jacket around the bore to keep the temp less than 3 K Bore tube inner diameter greater than 74 mm Design Pressure of Cooling Jacket 20 bar Design Pressure of Bore Tube 5 bar Leak rate of Jacket to Insulation Vacuum < 1 x std cc/sec Leak rate to Bore Tube < 1 x std cc/sec with the Jacket at 25 bar Helium Pressure

24 Oct 2002 RFP Review14 Beam Tube Fabrication Readiness No R&D needed Final Design is Complete Preliminary Fabrication Plan Outlined (see Review URL) Acceptance Tests Outlined 316LN Bore tubes to be delivered by CERN via BNL

24 Oct 2002 RFP Review15 Beam Tube Fabrication/Acceptance Plan All operations to be done in B 77 Area Fabrication Steps outlined in Review URL No show stoppers seen Acceptance Testing –2 to 5 thermal cycles of weld regions –Pressure test Jacket to 370 psig –Pressure test Bore to 75 psig –Jacket Leak Rate < 1 x std cc/sec (helium) –Bore Tube Leak Rate < 1 x std cc/sec (helium) with Jacket at 370 psig –Dimensions within tolerance Shipped to DFBX Vendor under 3 psig N 2 Pressure

24 Oct 2002 RFP Review16 Instrumentation Duct Requirements Provide wires for magnet cold mass instrumentation –MQX2 requires 100 good wires 32 each 30 AWG for low voltage sensors, 600 V dc rating 36 each 26 AWG for voltage taps, 5 kV dc rating 32 each 18 AWG for heaters, 5 kV dc rating –MBX2 requires 22 good wires 8 each 30 AWG for low voltage sensors, 600 V dc rating 6 each 26 AWG for voltage taps, 5 kV dc rating 8 each 18 AWG for heaters, 5 kV dc rating Low heat leak to Superfluid bath Pressure rating of 20 bar Leak rate to insulation vacuum < 1 x std cc/sec Provide for thermal contraction of about 30 mm

24 Oct 2002 RFP Review17 Instrumentation Duct Fabrication Readiness Final Design is complete Development work is being done by FNAL Strawman fabrication steps are outlined in Review URL Work to be done in the B 77 area

24 Oct 2002 RFP Review18 Instrumentation Duct Acceptance Dimensions within tolerance Welds thermal shocked to LN 2 to 5 times Pressure tested to 370 psig Leak tight to < 1 x stc cc/sec Suitable number of wires are installed –Give proper void fraction inside the conduit –For MQX2, the Hypertronics connector on the magnet side is loaded –Stripped ends on the magnet side of MBX2 –Continuity check passed –Hipot test passed –Wires on DFBX side are labeled per wiring diagrams

24 Oct 2002 RFP Review19 Conclusions We have completed the R&D on the Lambda Plug and are ready to commence work on incorporating this in Bus Duct Assemblies for the DFBX Schedule may be impacted by delivery of insulated corrector bus - we can use assistance from the USLHC-PMO in getting the bus delivered in Dec 2002 Beam Tube Fabrication is ready to begin Instrumentation Bus can commence after FNAL has completed the necessary development work We expect to deliver the LBNL Items to the DFBX Vendor 2 months before they are needed