WCSSG Spent Fuel Management & Nuclear Materials Working Group

Slides:



Advertisements
Similar presentations
STÒRAS UIBHIST LOCH CARNAN COMMUNITY WIND FARM. Loch Carnan Community Wind Farm Iochdar Hill was deemed to be most promising due to: Strong low cost grid.
Advertisements

Introduction. What is ISO14001? A documented system of all impacts a company are having on the environment. A detailed strategy to reduce these impacts.
Environmental Impact Assessment for Waste Treatment Options
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
TM/WSP 5-9 Nov Group D3- Nuclear fuel cycle, nuclear waste - Site and supporting facilities - Environmental protection - Emergency planning QUESTIONS.
TM/WSP 5-9 Nov Group D1- Nuclear fuel cycle, nuclear waste QUESTIONS / DIFFICULTIES  Why is the NPP decommissioning required / necessarily?  How.
Environmental Management EES and PCP Port Capacity Project PLG Meeting No. 2.
Conrad Wilson RPS Consulting Engineers LANDFILL IN THE DUBLIN REGION.
Geology Matters 2013 Presenter: Robert Federico, Principal November 14, 2013 Donkin Coal Mine Environmental Assessment Case Study.
Key Environmental Issues for Round Two Sue Sljivic Director – RSK ENSR Environment Ltd
Draft Policy Overview Utilities & Renewable Energy Planning Study Presentation By: Tim Cane, The Jones Consulting Group Ltd. November 12, 2008 Township.
Planning Permission Process and Procedures
Environmental Aesthetics. Natural Environment Add a New Component to the Environment A Building! Can we make this addition a POSITIVE one ?
Consultation, Communication & Change 77 th Annual EPLGA Conference Waves of Change: Oceans of Opportunity 24 February 2014 Presenter - Sally Richardson.
Discussion of Climate Action Team Subgroup Activities California Integrated Waste Management Board Board Meeting December 11, 2007.
Institute of Environmental Protection Maciej Sadowski Grazyna Porebska.
Energy National Policy Statements Nick Cooper DECC.
Clear Thinking on Nuclear: New Plant Construction Nuclear energy is dependable, affordable, and environmentally sound. Nuclear energy is needed to meet.
1 Proposed Waste to Energy Plant Planning Approval and Licensing Requirements Procedural Aspects Planning Procedure: Maria Lombard, Planning Consultant.
Centrica – An Energy Utility Perspective Gearόid Lane Director, British Gas New Energy 29 th April 2009.
Nuclear Energy in the 21 st Century BEIJING 2009 International Ministerial Conference April 2009.
Implementing NDA’s Strategy - a year on Update to NuLeaf September 2012 Bill Hamilton, NDA Head of Stakeholder Relations.
Establishing SEA Guideline for Environment friendly Water Resource Development Young-Il Song.
Objecting to Development
Cold Blow Wind Turbine Clyro Community Council - 7pm, 27 th November 2013.
Minsk, October 8 th, 2014 Martin Smutný Integra Consulting Ltd.
Action Plan Resources. Intersections of geoscience and sustainability.
Thriving Communities planning the places we need Adam Beck Manager Sustainable Communities Green Building Council of Australia.
Environmental Report – Are they Creating Transparency on Environmental impacts/costs? By Dr Chris Anastasi Member of EURELECTRIC Working Group Environmental.
0 Tadas Matulionis Lietuvos Energija AB Strategic planning manager Minsk, December 07, 2007 Environmental Impact Assessment of a New Nuclear Power Plant.
Synopsis EIA Purpose of EIA Origin Key Elements NGO Participation Content Analysis 1.
Design Solutions. Mandatory Question 1. Environmental Impact – How does the production and transmission of electricity affect the environment, such as.
NDA PhD Bursary Spent Fuel Theme Carwyn Jones, Nuclear Technologies (representing NDA) 25 th August 2015.
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
Social Benefits Improve public health of work force and community. Create more walkable, accessible, and livable neighborhoods by incorporating Smart Growth.
Case study: SEA for land-use plan amendments of Krasna Hora municipality.
 The SNC’s mission is to initiate, encourage and support efforts that improve the environmental, economic and social well- being of the Sierra Nevada.
ERT 319 Industrial Waste Treatment Semester /2013 Huzairy Hassan School of Bioprocess Engineering UniMAP.
SEA - National plan Electricity Supply Arend Kolhoff Netherlands Commission for EIA Jordan - September 2003.
Federal Aviation Administration NextGen Environmental Management System (EMS)
Nuclear Energy and 21st Century Environmentalism June 4, 2014.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
PAKISTAN SUSTAINABLE TRANSPORT PROJECT
Environmental regulation and management At I/S Vestforbrænding Annette Hou Olsen.
Building Capacity: Responding to SEA Consultation Lucia Susani Environmental Assessment Policy and Process Manager Environment Agency of England and Wales.
11/02/10 The Value of Scoping Opinions: the Tower Hamlets approach Peter Cole September 23 rd 2010.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
NUCLEAR TRANSPARENCY WATCH Prevent and anticipate through transparency and participation Nuclear energy related planning – obstacles and challenges in.
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
Spent Fuel Management and Nuclear Materials (SFM&NM) July 2016 Update
Allington Waste Management Facility
ENVIRONMENTAL IMPACT ASSESSMENT
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Nuclear Energy Debate Questions
Company overview – Environmental and Social Consultants
IGOS Cryosphere Theme The cryosphere is an integral part of the global climate system, modulating surface energy and moisture fluxes, clouds, precipitation,
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Questions on Environment/Sustainability Chapters 57-63
WHY IS PHYSICAL DIVERSITY IMPORTANT?
Waste Planning Case Studies Exeter Energy from Waste Facility
L.O: explain the usefulness of recycling and sustainability of metals
Overview What is the CEQA environmental review process?
Archaeology Environmental Science Human Geography Physical Geography
نام: عنوان طرح / شرکت.
WCSSG draft response to NDA Strategy III consultation
WCSSG – NDA Strategy III Engagement
Social Studies Starter
5 Urban Problems The growth of urban centres Problems Heritage issues
Environmental Priorities Environmental Impact Assessment
Camarillo Springs Project Draft EIR Scoping Meeting
Presentation transcript:

WCSSG Spent Fuel Management & Nuclear Materials Working Group AGR Interim Storage Project – Change of Use Planning Application Jim Field Nicola Savage Date: 21st July 2015

AGR Interim Storage Project NDA Strategy I (April 2011) Complete Thorp reprocessing contracts and interim storage of fuel 07/12/2018

AGR Interim Storage Project – current operations onsite 07 December 2018

AGR Interim Storage Project – future operations onsite 07 December 2018

AGR Interim Storage Project – Scope of the EIA Landscape and visual amenity Gaseous and Aqueous Emissions Socio-economics Geology and hydrology Noise and vibration Environmental Impact Assessment Energy management and sustainability Traffic Air quality and dust Waste Archaeology and cultural heritage Climate change Land use and recreational access 07 December 2018

AGR Interim Storage Project – What’s next… ES submitted with Planning Application to LPA Scoping Report submitted to LPA Scoping Opinion received from LPA Produce Environmental Statement WCSSG Working Group EIA 07 December 2018