LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017

Slides:



Advertisements
Similar presentations
Design Project Management Final Presentation Zachary Kirsch 15 November 2012.
Advertisements

Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
> >
Status report GRSP IWG ECRS 53rd GRSP Geneva May 2013 Informal document GRSP (53 nd GRSP, May 2013, agenda item 19)
WORK ZONE SAFETY & MOBILITY Meeting the Federal Rule Jim Allen Safety Implementation Engineer ATSSA Illinois Chapter Meeting.
Continuous Deployment JEFFREY KNAPP 8/6/14. Introduction Why is it valuable How to achieve What to consider.
NETE Computer Network Analysis and DesignSlide 1 Documenting Network Design NETE-4635 Computer Network Analysis and Design.
INTRODUCTION “Big Red” Torin Aluminum Jack “Big Red” Torin Aluminum Jack 3000 lb capacity 3000 lb capacity Gross weight 48 lbs Gross weight 48 lbs High.
3. 4. EOC Practice:. 5. Combining Like Terms & Distributive Property.
Potential Control Strategies for Mobile Sources Dave Shaw, NY DEC 2004 OTC Annual Meeting Red Bank, NJ.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Insert Your Name Insert Your Title Insert Date Client Registration Examples Alan Frindell Denis Pochuev 4/27/2011.
CAS NOTIFY  Number of leads you received from Lead Distribution.
Rail Road Vehicles. Rail / Road: Introduction RAIL / ROAD Currently in use: 3 units 4x2 15 units 6x4.
HMA-T Progress Meeting 26 November 2008 Slide 1 IMAA-CNR activity report HMA-T Progress Meeting 26 November 2008 S. Nativi, E. Boldrini, F. Papeschi IMAA-CNR.
Welcome to the 13 th Annual TSA Conference, 2016.
Single Module Vertical Outlet Tube Change
2017 Single Module Beta to LP Changes
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
Top-Down Network Design Chapter Fourteen Documenting Your Network Design Copyright 2010 Cisco Press & Priscilla Oppenheimer.
TDRS Rubber Injection – [vehicle] [Sumitomo p/n]
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
CEAF Type: Change Approval Request
Simulated fuel economy benefit
Natural Gas Project Plan
L9 E6 OBD Phase C Product Update
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Implementation of bolt spacers to the oil cooler hardware
Affected Options: BR Option; EB Option; PH Option;
2017 X15 EH Bracket Machining Change
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
ctclink Steering Committee
Plant issue list A108: Need WR for missing C/S on high mount FA options Chuck Crowder.
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Compressor Cabinet Design & Interface Diane Hascall Integration Engineer Joint Technical Meeting 2017 March 6, 2017.
Oil Pans with Full Circumference Clamping Plates for ISB6
Sticker Label Location Change on UL2 Supply Module
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Exit Capacity Substitution and Revision
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Click Summary Value Button to Show Source of Integral or Time
Modified at -
Thing / Person:____________________ Dates:_________________
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
Complete Vehicle Systems.
Presentation transcript:

LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017

Project Scope Change Summary: Implementation Strategy and Date: The LP fuel plumbing on ISX 15 is redesigned to match the change in LP fuel pump- existing plumbing p/n 5440474 The design is modified as the inlet/outlet locations on the fuel pump have changed The LP fuel lines have new routing with respect to the new LP pump mounted on engine AFFECTED OPTIONS : FF1380/FF1396/FF1397/FF1402 No changes to the options except the fuel line to the LP pump and related connections Implementation Strategy and Date: Take a new option & obsolete the existing option Implement by: End of next year: 31-Dec-2018

Feedback Requested- Is the new routing compatible at vehicle level?? New FF1380/FF1396/FF1397/FF1402 Existing FF1380/FF1396/FF1397/FF1402

Integration on Engine: Routing from Engine Front New FF1380/FF1396/FF1397/FF1402 Existing FF1380/FF1396/FF1397/FF1402