MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER

Slides:



Advertisements
Similar presentations
1 Zero Tax Increase Referendum: Community Information Session.
Advertisements

Fullerton College Bond Fund Projects Update Fullerton College Athletics Project Scope Overview Schedule Parking.
Bronze Award: Library/Media Center
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
STATE HIGH RENEWAL PROJECT “KICK-OFF” MEETING July 14, 2014 Crabtree, Rohrbaugh & Associates, Architects Agenda Opening Remarks Overview/Purpose Design.
May 6, 2010 Irvine Unified School District HMC Architects.
Facilities Design Principles Chapter 28. Planning Pitfalls Failure to provide accommodations for handicapped Failure to provide adequate storage Failure.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Glenvar High School Renovations School Board Presentation
2014 Bond Issue Projects September 22, On August 5, 2014 the voters of South Lake Schools passed a $25 million bond proposal This PowerPoint will.
WJJ Middle School Facility Study Tri Board Meeting February 5, 2015.
1 Purpose  Summarize Monday’s workshop  Update on the Radio System – confirm staff’s recommendation  Jail Expansion – discussion/direction  Discussion.
Prop W Independent Citizens’ Oversight Committee Lemon Grove School District Slideshow of Projects Board Presentation May 2013.
© Baltimore County Public Schools Schematic Design Presentation Catonsville Elementary School at Bloomsbury 1104 Kenilworth Dr. Suite 500 Towson,
Tackle Engineering We Tackle the Tough Jobs Proposed Developments for New Park and Recreation Center in Alpha, NJ Presented to the Alpha Borough Council.
Fullerton College Physical Education Project Community Meeting March 11, 2009.
UNC Charlotte Health & Wellness Center Pre-Submittal Conference June 9, 2015, 2:00 PM Cone Center - Room 210.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Department of Communal Hygiene and Hygiene of labor Theme: "Hygiene requirements sports and recreation facilities" (Methodical development for teachers.
Evans High School Board of County Commissioners October 28, 2008 Case No. RZ Replacement Evans High School on the Existing 9 th Grade Center.
A presentation of The New Georgian Heights Alternative Elementary School for Columbus City Schools Board of Education 2 February 2010.
Eden Central School District Board of Education Meeting Eden CSD 2020 Project Update September 16, 2015.
Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, Phase IA, II, III, and IV. August 2007 Prepared by:
Bond Construction Update Facilities Advisory Committee Long Beach Community College District November 17, 2010 EDUCATE  ENGAGE  EMPOWER 1.
presents 5080 Meridian Street Pre-Construction Appraisal performed March 2009 $1,650,
March 12, 2015 Ss. John & Paul Catholic Church Feasibility Study.
FACILITIES MASTER PLAN FMP Review October TIME LINE 2014November 2015 February March April May October / November December Education / Facility.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
Learning, Health, and Safety Capital Project Alternates and Change Order
MIDDLE TOWNSHIP PUBLIC SCHOOLS BOND REFERENDUM March 8, 2016 Bond Referendum BUILDING FOR OUR FUTURE.
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
HVAC Installation Projects Administration and Multi-purpose Buildings Elementary Schools|1 Dolland 2 Edmondson 3 Moffitt 4 Sanchez Middle School| 5 Waite.
Shilshole Bay Marina Customer Service Buildings
White Pigeon Community Schools
Ventura Community College District
Bond 2017 Capital Projects Linda Degman | January 19, 2017.
Mornington Park Enhancements
UPDATE: 8/8/2011 Batavia City School District
FLCC GENEVA CAMPUS CENTER PROJECT
Salk Neighborhood Park & Joint Use Development
Woodbrook ES Addition & Modernization
ELYRIA MULTI-SPORT ATHLETIC COMPLEX
Multistory Office Building
Raytown Quality Schools Bond Project Update
Facilities Update November 17, 2017
21st Century School Buildings Plan
Shilshole Bay Marina Customer Service Facilities
UNC Charlotte INTERCOLLEGIATE SWIM TEAM PROJECT
Albemarle County Public Schools
2013 RTS Campus Improvement Project
Extra-Curricular Program Design Athletics/Music/Recreation
Athletic Alternate Opportunity
DOVER ELEMENTARY Existing MPB (2/14/12).
Troy School District Bond Program – Series 1 Construction Update
PROPOSED FACILITIES REFERENDUM
CONVENTIONAL FACILITIES LCLS Office Space
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Citizens’ Oversight Committee Meeting February 22, 2018
Chimacum District Facility & Program Plan
Troy School District Bond Program – Series 1 Construction Update
Student Center and Fitness Center Catholic High School
Where do you go from here?
EAST PENNSBORO AREA SCHOOL DISTRICT
Project Update – High School Additions & Remodeling
Presentation transcript:

MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER MARCH 27, 2018

AGENDA 01 02 03 04 PROJECT OVERVIEW SITE PLAN FLOOR PLAN- ACTIVITY CENTER FLOOR PLAN- TEAM ROOM

PROJECT OVERVIEW 01 WILDCAT ACTIVITY CENTER 15,000 SQUARE FEET ALL EXTRACURRICULAR CENTER 2 PRIMARY GYMS UNDER ONE ACRE OF COVERAGE REDUCES APPROVAL SITE SCHEDULE TEAM ROOM CONVERSION 1,200 SQUARE FEET BUDGET ACTIVITY CENTER $3.8-$4.2 MILLION TEAM ROOM $250,000 TOTA PROJECT COST $4.5-$4.9 MILLION SCHEDULE Schematic Design- Complete Full Design- May-July 2018 Bidding- July/August 2018 Board Approval- August 2018 Notice to Proceed- August 2018 Substantial Completion- July 2019 PROJECT LOCATION S. BROAD STREET WILLIAMS GROVE ROAD PROJECT OVERVIEW 01

SITE PLAN 02 EXISTING HIGH SCHOOL LOOP ROAD BIO-RETENTION POND SHED AREA OF DISTURBANCE LOOP ROAD EXISTING HIGH SCHOOL BIO-RETENTION POND SHED AUXILIARY GYMNASIUM GYMNASIUM TEAM ROOM RENOVATION LINE OF EXISTING COURTS ENTRY EXISTING TRACK SITE PLAN 02

FLOOR PLAN – ACTIVITY CENTER 03 EXTERIOR Swing Gate To Control Vehicular Traffic Access Roads Drinking Fountains Clear Pedestrian Paths INTERIOR Gymnasium Court Size 50’ X 84’ 6,800 Square Feet Auxiliary Gymnasium 4,400 Square Feet (2) Full Mat Capacity Men's & Women's Restrooms Off Main Lobby Concession Storage For Band Athletics Outdoor Maintenance Activity Center BAND STORAGE MECH. STORAGE ATHLETIC STORAGE OUTDOOR STORAGE SWING GATE GYMNASIUM 50’ X 84’ AUXILIARY GYMNASIUM CONCESSION/STOR. LOBBY BAG DROP FLOOR PLAN – ACTIVITY CENTER 03

EXISTING TRAINING ROOM EXTERIOR No work INTERIOR Reconfigure Laundry Room to include Vestibule into new Team Room Team Room with (65) 15” x 15” lockers Unisex Toilets and Showers Plumbing chase on existing storage wall for ease of future Team Room if ever needed LAUNDRY EXISTING TRAINING ROOM (NOT IN SCOPE) DRINKING FOUNTAINS TEAM ROOM (65) 15” X 15” LOCKERS SHOWERS EXISTING OUTDOOR STORAGE TOILETS FLOOR PLAN – TEAM ROOM 04

QUESTIONS? Thank You