MECHANICSBURG AREA SCHOOL DISTRICT WILDCAT ACTIVITY CENTER MARCH 27, 2018
AGENDA 01 02 03 04 PROJECT OVERVIEW SITE PLAN FLOOR PLAN- ACTIVITY CENTER FLOOR PLAN- TEAM ROOM
PROJECT OVERVIEW 01 WILDCAT ACTIVITY CENTER 15,000 SQUARE FEET ALL EXTRACURRICULAR CENTER 2 PRIMARY GYMS UNDER ONE ACRE OF COVERAGE REDUCES APPROVAL SITE SCHEDULE TEAM ROOM CONVERSION 1,200 SQUARE FEET BUDGET ACTIVITY CENTER $3.8-$4.2 MILLION TEAM ROOM $250,000 TOTA PROJECT COST $4.5-$4.9 MILLION SCHEDULE Schematic Design- Complete Full Design- May-July 2018 Bidding- July/August 2018 Board Approval- August 2018 Notice to Proceed- August 2018 Substantial Completion- July 2019 PROJECT LOCATION S. BROAD STREET WILLIAMS GROVE ROAD PROJECT OVERVIEW 01
SITE PLAN 02 EXISTING HIGH SCHOOL LOOP ROAD BIO-RETENTION POND SHED AREA OF DISTURBANCE LOOP ROAD EXISTING HIGH SCHOOL BIO-RETENTION POND SHED AUXILIARY GYMNASIUM GYMNASIUM TEAM ROOM RENOVATION LINE OF EXISTING COURTS ENTRY EXISTING TRACK SITE PLAN 02
FLOOR PLAN – ACTIVITY CENTER 03 EXTERIOR Swing Gate To Control Vehicular Traffic Access Roads Drinking Fountains Clear Pedestrian Paths INTERIOR Gymnasium Court Size 50’ X 84’ 6,800 Square Feet Auxiliary Gymnasium 4,400 Square Feet (2) Full Mat Capacity Men's & Women's Restrooms Off Main Lobby Concession Storage For Band Athletics Outdoor Maintenance Activity Center BAND STORAGE MECH. STORAGE ATHLETIC STORAGE OUTDOOR STORAGE SWING GATE GYMNASIUM 50’ X 84’ AUXILIARY GYMNASIUM CONCESSION/STOR. LOBBY BAG DROP FLOOR PLAN – ACTIVITY CENTER 03
EXISTING TRAINING ROOM EXTERIOR No work INTERIOR Reconfigure Laundry Room to include Vestibule into new Team Room Team Room with (65) 15” x 15” lockers Unisex Toilets and Showers Plumbing chase on existing storage wall for ease of future Team Room if ever needed LAUNDRY EXISTING TRAINING ROOM (NOT IN SCOPE) DRINKING FOUNTAINS TEAM ROOM (65) 15” X 15” LOCKERS SHOWERS EXISTING OUTDOOR STORAGE TOILETS FLOOR PLAN – TEAM ROOM 04
QUESTIONS? Thank You