Wed :40 Lost S78 - QPS controller.

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Week 13: R. Assmann, J. Wenninger
Floating MD week 28 summary
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday September 14th
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Thursday morning – optics correction
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
LHC commissioning Week 38
Thursday morning 09:30 Dump of pPb fill.
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Tuesday 9th November 10:02 Fill beams dumped
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Yesterday morning Held 1647 for a while – SPS kicker problem
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday 26th July 13:21 Fill 2880 beam dumped
Wednesday 13th 9:30 Stable Beams… with 1 pilot and 2 nominals
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
MD Planning Fri – Sat (1. – 2.7.)
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wed 28.03.12 05:40 Lost S78 - QPS controller. Access for QPS and RB.A78. Rainer: “Caused by a loss of 230 V mains power on rack DYPB. A27R7. Closer inspection by the stand-by service revealed that a 230V mains plug was not properly connected (connector not locked). Most likely the fault has been introduced during the winter shutdown but unfortunately not seen until now.” 09:30 Precycle. RQ6.L7 tripped during precycle. QPS experts to reset RQ6.L7B. The trip was due to a zero-crossing voltage spike of PC. Spike was exceeding the filter capacity of the detection system, which in consequence tripped the circuit. 11:08 OFSU problems (connection problems for clients)… FBCT ... both crates rebooted by the experts. OFC down. Fixed ramp functions for TCT's in IR8. Wrong sign of crossing angle. 29-03-2012 LHC morning report

Wed 28.03.12 13:06 Start ramp with 2 nominal bunches per beam. RF blow-up on. Transverse emittance very large, as requested (4.5 micron norm. at injection, 5 – 6 micron at top energy). Smooth scraping of 15% of beam intensity. Primary collimators moving in from 5.7 to 4.3 nominal beam sigma. In real sigma: 5.0 s  3.4 s (measured emittance). In addition: not aligned. 13:43 Start of 4 TeV collimation alignment. 15:53 Beams dumped. due to beam loss in Q7 of IR3 induced by longitudinal beam instability (phase loop with zero gain) and a small orbit correction. 29-03-2012 LHC morning report

Lifetime with Tight Coll. + Large Emittance ramp 29-03-2012 LHC morning report

Beam loss during ramp ramp Collimator cut in real sigma: 5.0 s  3.4 s (measured emittance) Transverse emittance very large, as requested (4.5 micron norm. at injection, 5 – 6 micron at top energy). 29-03-2012 LHC morning report

Collimator gaps at 4 TeV 29-03-2012 LHC morning report

…nice and stable within 50 – 100 micron Orbit during ramp …nice and stable within 50 – 100 micron 29-03-2012 LHC morning report

Collimator Setup Example 29-03-2012 LHC morning report

Summary Collimation Setup (~2h) Collimator alignment started at 13:45. The horizontal B1 and B2 TCPs were aligned, followed by the B1 and B2 TCPs in IR3. The horizontal B1 and B2 were aligned coarsely in parallel. The maximum number of steps taken by each collimator in sequential alignment after crosstalk during parallel movement needs to be increased from 100um to > 150um. On occasions, the BLM spike recognition classified a VALID spike as INVALID, moving in the jaw further than was necessary (20um) until a VALID spike was classified. To be checked. 8 collimators in B1 and 1 collimator in B2 were aligned in 2 hours. However, ~30 minutes was spent re-aligning one of the IR3 collimators, as a large measured-to-nominal beam size ratio was noted for the 5 IR3 collimators (> 140% up to ~175%). Collimator setup will resume tomorrow. RA, BS, GV, RB, SR, LL 29-03-2012 LHC morning report

RF problems with longitudinal blow-up In the first ramp with two nominal bunches per beam, the phase noise excitation did not have constant power around the ring. This situation was used to achieve intentional different bunch lengths in an RF MD in 2011, but in normal operation, the excitation power must be identical for all bunches. The result was a correct bunch length average (around 1.1 ns), thanks to the feedback adjusting the excitation amplitude from a measurement of bunch length mean, but different lengths for the two bunches. Ring 1: Bunch 1 length 1.6 ns, bunch 2 length 0.6 ns Ring 2: Bunch 1 length 1.4 ns, bunch 2 length 0.9 ns With 0.6 ns length, the second bunch of Beam 1 became unstable in the last part of the ramp (instability driven by the longitudinal broadband impedance). We observed quadrupole oscillations (bunch lenght modulation) of growing amplitude, resulting in debunching and finally beam dump caused by excess loss on momentum collimator. John, Themis, Andy and Philippe 29-03-2012 LHC morning report

RF Stability Issue Giulia P. 29-03-2012 LHC morning report

RF problems with longitudinal blow-up The FESA class was corrected and we tried a new ramp around 18:30. This resulted in very similar behaviour for both bunches, each ring. For Beam 2, the undershoot in bunch length is understood and should not happen in future ramps. For beam 1, the second bunch still showed a 150 ps pk-pk lenght fluctuations during the last quarter of the ramp, stopping at flat top. That will be followed in later ramps. The strength of the excitation has been doubled to, hopefully, track the target 1.2 ns more closely. We will monitor later ramps. John, Themis, Andy and Philippe 29-03-2012 LHC morning report

Wed 28.03.12 16:23 Cavity 3B1 tripped. Calling expert. Dry ramp for the RF with the blow-up 16:57 Injection. 18:32 Ramp of two nominal bunches for checking RF. 19:00 Some BI studies at flat top: tune tracking tests, switched on radial modulation and trimmed Q' in steps between -15 (not so good, see lifetime) and +15 (much better). Actually, Q'=-10 seems to be also OK. 19:49 Programmed dump. Without beam: Test unsqueeze to 90m: no interlock! 21:50 Injection and dump. 29-03-2012 LHC morning report

Lifetime with Tight Coll. + Normal Emittance flat top injection ramp Both beam 1 and beam 2 lifetimes are fine at flat top. Improvement for beam 2 due to RF changes? Lifetime reduction during ramp is unavoidable and not surprising at all: Collimators go down in normalized “real” sigma (8.2s  6.2s) and tails are cut. Note: Tails do not contribute to luminosity! 29-03-2012 LHC morning report

Summary of injection protection studies Validation of TCDI settings in both lines: put TCDIs to +/-5 sigma of measured centre from last setup create open oscillations in the TLs from 0 to 360 deg in steps of 30 deg in hor and vert plane record losses at the BLMs close to the collimators with the highest loss level for the respective plane measure maximum transmitted amplitudes per phase FEI unmasked and checked if OK Results: measurements for vertical planes look better, probably due to better trajectory stability transmitted amplitudes between 5 and 6.5 sigma --> below 7.5 sigma protection limit TCDI validation OK 29-03-2012 LHC morning report

29-03-2012 LHC morning report

Thu 29.03.12 05:39 Injection for collimation setup at 4 TeV (2 nominal bunches, increased emittance) 06:19 Ramp 06:49 Start collimation setup at 4 TeV Started on vertical plane: 13 coll done in 1.5 hour Still RF blowup issues: to be followed Might prevent full collimation setup at 4 TeV 29-03-2012 LHC morning report

Bunch Length Beam 1 29-03-2012 LHC morning report

Bunch Length Beam 2 29-03-2012 LHC morning report

Ahead Thu 06:00 Continuation collimation setup, RF tuning? 18:00 Inject and dump work Fri 02:00 Optics, K modulation (or loss maps 4 TeV) 10:00 Take 1 nominal bunch 4 TeV through full cycle into collision 18:00 Aperture checks (or optics, k modulation) Sat 03:00 Loss maps at 4 TeV 11:00 Take 1 nominal bunch 4 TeV through full cycle into collision, with TCT setup through squeeze and collision processes 19:00 BI setup 4 TeV without squeeze (12 nom b) nominal bunches) Sun 04:00 Loss maps at 4 TeV (or injection) 12:00 Inject and dump work Qualification ramp with final processes (ramp, squeeze, collide) Next week: Set-up for 50ns 29-03-2012 LHC morning report