Project Name – ID # 7/1/2009 Current Project Status Project Issues

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

PARKVIEW APARTMENTS 20 Unit Rehabilitation & Site Work ISLA VISTA, CA. Joint Cities-County Affordable Housing Task Group October 23, 2008.
Hogan Residence Valued Repeat Customer Kitchen Remodel Kitchen Remodel See other presentations: See other presentations: Basement Bath Addition Basement.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
DG Inyorkern Weekly Project Summary 1/17/14. DG Inyokern 1/17/14: Percentage Overview Demolition: Pad Prep: 100% Finished and ceriified Footing & Foundation:
Assignment 3 Unit 21Kyle Barrass Presentation of a Construction Project.
Additions Concrete, Tile, etc Docks and Decks Foundations Kitchen and Bath Outdoor Features Timber Frame
Hogan Residence Bathroom Remodel Valued Repeat Customer Kitchen Remodel (see other presentation) Basement Bathroom Addition (see other presentation) Upstairs.
Facilities Modernization Program Funded by Measure B Project Report April 16, 2012.
Presented by: Jane Briggs and Karen Mitchell October 11, 2007 The New LEED Building at Shady Grove.
Material Management. Materials should be ordered early –Minimize risk of price inflation, lack of materials –Just in time delivery minimizes space required.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Unit 1 Types of Construction
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
Project 3 DS 413: Design Studio 413 May 9, 2010.
Project 6 DS 413: Design Studio 413 May 9, 2012.
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Renovating a Foreclosed Property versus Buying Prime Real-estate Jonathan Lee,Jimmy Luong,Vincent Rodriguez, Bryan Vine Team #5.
Graphic Communication
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
Sustainable Construction Methods
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
Who we are Orrix Homes Jeremy Laviolette Dylan Kugler Board of Directors John Giesbrecht Rick Kugler.
WHAT I WANT TO BE WHEN IM OLDER! CAPENTER AND JOINER.
Pool Project SWIMMING POOL 3500sq ft. DECK AREA 7000sq ft. SHELTER400sq ft. EQUIPMENT ROOM/STORAGE SHELTER 1400sq ft.
1 Presentation 10: FLOOR SYSTEM COMPONENTS. 2 Framing Methods Platform Framing: –Each floor is constructed and then walls are placed on top.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District January 23, 2012 EDUCATE  ENGAGE  EMPOWER 1.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
Vicinity Map Gillis W Long Center, Carville, LA Bldg 15 Stairwell Painting (1 st and 2 nd Floor) September 30, 2015.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
TRIGON, INC ARDMORE CITY SCHOOLS 2013 BOND ISSUE PROJECTS.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
LINDBERGH Chesterfield Mall Chesterfield, MO Prepared by: Rick Zavala Week 10 of 10.
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Major Steps In Building a SFR
Procurement Status Miao Yu 11/19/2013.
Bond Oversight Committee
Gantt Chart Presentation Name Course Name
Universitas Komputer Indonesia
Passive Solar Home Design Project
Initiative Name Initiative Leader Target Go Live Date: Reporting Date
“Building Better for the People of the World”
Objective 6.02 part 1: Recognize components of construction
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT February 2017 Fast Facts
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
Eagle Trace Condo Association
Minuteman Vocational Technical Regional High School Progress
What would improve the RAG status when red or amber
Progress Report 11/10/11.
Insert subhead here Project Status.
Name____________________________ Tutor Group _____
Gantt Chart.
Lincoln Common Redevelopment Construction Update.
New White Lake Township Library
What would improve the RAG status when amber or red
Minuteman Vocational Technical Regional High School Progress
What would improve the RAG status when amber or red
Minuteman Vocational Technical Regional High School Progress
Minuteman Vocational Technical Regional High School Progress
Keystone Library Deliverables
Minuteman Vocational Technical Regional High School Progress
Project Time Management
Minuteman Vocational Technical Regional High School Progress
Presentation transcript:

Project Name – ID # 7/1/2009 Current Project Status Project Issues 3 open; 0 blocking; 29 closed 72% 6/29 Drywall in baths green not grey board; Carlos working with vendor. New board on-site 7/3 6/29 Tile for top floor is not premium as ordered. Joe will have proper tile delivered by 7/4. 6/29 Light fixture delivery delayed 3 days. Project had allowed for this delay in slack. No impact. Delivery scheduled for 7/7. Installation needs 1 day. Target 68% 2 days ahead of schedule Milestones Schedule Complete Designs approved Groundbreaking Foundation Build Framing Roof Walls Interior Landscaping Delivery Complete In Progress (55%) 7/14/08 7/21/08