LEGISLATIVE BRIEFING SERIES presented to Alamo Area Legislative Delegation presented by Diane Rath Executive Director May 14, 2018
ALAMO REGION
CONNECTIVITY CORRIDORS March, 2017
SAN ANTONIO DISTRICT RURAL FUNDING
2018 UTP TxDOT/AAMPO Mobility Funding Categories Congestion and Connectivity Funding Program Areas 10-Year Statewide Funding ($ Million)* 10-Year Allocation (SAT) ($ Million)(1) Un-programmed Amount ($ Million) (1) Category 2 – Metro & Urban Corridor Funding (MPO) $ 12,152 $1,192 $ 93 Category 4 Urban - Connectivity Corridor Congestion (3C) (TxDOT) $ 5,082 $485 $ 229 Category 12 – Texas Clear Lanes (TxDOT) $ 4,898 $629 $ 142 (2) Category 4 Rural - Rural Connectivity Corridors (TxDOT) $6,399 $5 $2,430 (Statewide Unallocated) (2) Category 12 – Strategic Priority (TxDOT) $5,100 $178 $3,086 Total $ 33,631 M $2,500 M $635 M (SAT) $5,516 M (Statewide) (1) Allocations per the TxDOT 2018 UTP (December 2017) – For Planning Purposes and Subject to Change (2) Project Specific Statewide Allocations by Texas Transportation Commission (3) Category 7 (STP-MM) Funds are not included in this summary as this funding includes off-system projects and are traditionally selected by a Project Call CAT 4 Rural Connectivity was increased to by $5.0 million CAT 12 Strategic Priority was increase to $171. M
Frontage road connection, HWY County Limits Description LEN EST SH 16 Atascosa SH 16 @ Atascosa River Widen Bridge 0.134 $ 1.6 Bandera Old San Antonio Road to Robindale East Expand to 5 lane 1 $ 10.0 I 35 Frio IH 35 SH 85 and B -35 ( Dilley) Frontage road connection, 2.3 $7.0 US 181 Karnes County line to County Line Expand to 4 lane divided highway 16 $40.0 I10 Kendall at US 87 N Operational Improvements 0.99 $ 5.0 SH 27 Kerr Kerrville to Centerpoint Expand to 5 Lane 8 $ 56.0 US 290 Gillespie Johnson City to Fredericksburg operational improvements 29 $29.0 FM 1957 Medina * SH 211 to FM 471 w Expand to 4 lanes 6.52 $ 45.6 McMullen* SH 72 to Atascosa county line Expand 4 lane divided 12.83 $ 89.6 US 87 Wilson La Vernia to Bexar County/Wilson County Line 4 lane divided highway 4.2 $ 29.4 US 90 Uvalde SH 481 to Uvalde/Kenny County Line Super 2 17 $ 42.5 Texas Department of Transportation
Why I JOINED AACOG Thank You!