Smitty’s Two Minute Drill Photovoltaic Systems

Slides:



Advertisements
Similar presentations
Denver Fire Alarm Test Preparation Speed Drill © Ted Smitty Smith 2013.
Advertisements

FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE PV APPLICATIONS CODES AND STANDARDS EMERGENCY RESPONSE.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
2014 CHANGES TWO MINUTE DRILL COPYRIGHT TED “SMITTY” SMITH ©2014.
©Ted “Smitty” Smith This speed drill focuses on calculations that will be required for the journeyman and masters examination. The question slide.
Copyright 2005 Ted "Smitty" Smith Two Minute Drill Number Three Improving your skill in code Look Up Increasing Speed Drill.
Two Minute Drill Number 32- Journeyman Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 25- Residential Improving your skill in code Look Up Increasing Speed Drill.
©Ted “Smitty” Smith  This speed drill is designed to help you practice calculations. The slides will transition in three and one half minutes instead.
Two Minute Drill #8 Copyright 2005 Ted "Smitty" Smith Practice Code Look Up.
Two Minute Drill Number 26- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill #9 Copyright 2005 Ted "Smitty" Smith.
Equipment Use In Occupancies  A receptacle shall not be grouped or ganged in enclosures with other receptacles unless they are so arranged so that voltage.
Two Minute Drill #10 Copyright 2005 Ted "Smitty" Smith.
Two Minute Drill Number 27- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Calculation Speed Drill # NEC
Smitty’s Speed Drills 2008 Code Drills Health Care Facilities (C) Copyright 2008 Ted "Smitty" Smith1.
Copyright 2005 Ted "Smitty" Smith Practice Code Look Up Two Minute Drill #6.
Copyright 2008 Ted "Smitty" Smith.  Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide. 
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Two Minute Drill Number 23- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill Number 31- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Two Minute Drill Number 22- Residential Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith.
Improving your skill in code Look Up Increasing Speed Drill Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 24- Residential.
Balance of Systems (BOS)
2008 Code Drills (C) Copyright 2008 Ted "Smitty" Smith 1 Smitty’s Speed Drills.
Copyright 2008 Ted "Smitty" Smith Two Minute Drill Number 21- Residential Improving your skill in code Look Up Increasing Speed Drill.
Smitty’s Two Minute Drill Grounding
Smitty’s Two Minute Drill Grounding
Advanced Calculations Drill 1 for the 2011 NEC
License Examination Practice Drill
2011 Changes Two Minute Drill
Smitty’s Two Minute Drills
NICET Fire Alarm Tech Level 1 Practice Test # 4
Smitty’s Two Minute Drill Overcurrent Protection
NICET Fire Alarm Tech Level 1 Practice Test # 6
Smitty’s Two Minute Drill Mixed Content -05
Smitty’s Two Minute Drill #9: Special Occupancies
Practice Code Look Up Two Minute Drill #7
Conductors and Cables 2017 NEC
Ampacity Calculations and Overcurrent Protection 1
Calculation Speed Drill #1
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Calculations: Transformers and Service Conductor Calculations
NICET Fire Alarm Tech Level 1 Practice Test # 10
Smitty’s Two Minute Drill #1: Feeders and Branch Circuits
Two Minute Drill: Raceways and Boxes 2017
2014 Changes Two Minute Drill
EET 323 – Electrical System Design Lecture 9: Grounding
Two Minute Drill Number 29- Conductors and Raceways
Fire Alarm Tech Practice Test # 16 NICET
AGENDA INTRODUCTION CELLS AND COMPONENTS PV PERFORMANCE
Smitty’s Two Minute Drill Grounding and Bonding
Transformer Calculations: Word Problems
2008 Code Drills Health Care Facilities
Two Minute Drill – Residential 3
Fire Alarm Practice Drill # 11 Denver Fire Department Journeyman Installer License Test © Ted Smith 2017.
Smitty’s Two Minute Drill Services, Feeders, and Branch Circuits 1
Load Calculation Speed Drill
Two Minute Drill – Residential 3
Smitty’s Two Minute Drill Varied Number 7
FIRE ALARM DRILL 26 © Ted Smith 2017.
Smitty’s Two Minute Drill The BIG 5 Drill 1
Two Minute Drill – Residential 2
Smitty’s Two Minute Drill General Knowledge 2
Varied Calculations Drill 2
Presentation transcript:

Smitty’s Two Minute Drill Photovoltaic Systems 2017-7 A drill to help you improve your code skills and your ability to find answers in the code book. © Ted “Smitty” Smith 2016, 2017

Directions Left click on the presentation ICON located at the bottom of the slide directory to the left of the this slide or in the top menu under SlideShow. Each slide will transition to the correct answer automatically in 2:00 minutes. The correct answer will transition in 5 seconds. Do not worry about writing down the correct answer for now. You will have the opportunity to do that at the end of the two minute drill Good luck. REMEMBER: To have the best effectiveness, put this presentation in slide show mode and use the timers. This will help you get to 2 minutes per question. Do no worry about the answers until you get through the timed section. Following the timed section, the slides are repeated without time so you can look them up.

NOTICE BECAUSE OF THE LIMITED CONTENT OF THIS DRILL, THE TIME FRAME HAS BEEN REDUCED FROM 2 minutes FOR EACH QUESTION TO 1 MINUTE FOR EACH QUESTION.

Question 1 Circuit conductors between dc-to-dc converters and from dc-to-dc convertors to the common connection point of the dc system is the definition of: A. Diversion Charge Controller B. DC-to-DC Converter Source Circuit C. DC-to-DC Converter Output Circuit D. None of the above Copyright 2017 Ted "Smitty" Smith

Question 1 Answer 690.2 Definitions B. Copyright 2005 Ted "Smitty" Smith

Question 2 Which of the following is not something that is required to be isolated from conductors that are not solidly grounded on a photovoltaic system? A. Universal Power Monitor B. PV Modules C. dc-to-dc converters D. inverters Copyright 2016 Ted "Smitty" Smith

Question 2 Answer A 690.15 Copyright 2005 Ted "Smitty" Smith

Question 3 The isolating device for the equipment on a large scale photovoltaic electric power distribution production facility shall be permitted to be located more than ________ meters from the equipment where written safety procedures and conditions of maintenance that only qualified persons service the equipment. A. 3.1 B. 6.7 C. 1.8 D. 2.9 Copyright 2005 Ted "Smitty" Smith

Question 3 answer C 691.9 Copyright 2005 Ted "Smitty" Smith

Question 4 Isolating devices or equipment disconnecting means shall be installed in circuits connected to equipment at a location within the equipment, or within line of sight and within _______ feet of the equipment. A. 10 B. 8 C. 25 D. 50 Copyright 2017 Ted "Smitty" Smith

Question 4 Answer A 690.15(A) Copyright 2017 Ted "Smitty" Smith

Question 5 Which of the following can NOT be used to contain DC circuits of a PV system that are run inside of a building? Metal enclosures from the point of penetration of the surface of the building to the first readily accessible disconnecting means Metal raceway Encasement in 1” of concrete Type MC metal clad cable that complies with 250.118(10) Copyright 2005 Ted "Smitty" Smith

Question 5 C 690.31(G) Copyright 2005 Ted "Smitty" Smith

Question 6 Stand alone Photovoltaic systems operating at ________volts dc or greater between any two conductors shall be protected by a listed PV arc-fault circuit interrupter or other system components listed to provide equivalent protection. A. 50 volts B. 80 volts C. 120 volts D. 240 volts Copyright 2005 Ted "Smitty" Smith

Question 6 answer B 690.11 Copyright 2005 Ted "Smitty" Smith

Question 7 An adjustable electronic overcurrent protective device rated or set in with 240.6 is acceptable for providing overcurrent protection for PV system DC circuits? A. Yes B. No Copyright 2005 Ted "Smitty" Smith

Question 7 answer A. Yes 690.9(B)(3) Copyright 2005 Ted "Smitty" Smith

Question 8 According to the NEC a large scale photovoltaic electric power production facility has a generating capacity of at least ______________ megawatts and it is not under exclusive utility control. A. 1 MW B. 3 MW C. 5 MW D. 10 MW Copyright 2005 Ted "Smitty" Smith

Question 8 answer C 691.1 Scope Copyright 2005 Ted "Smitty" Smith

Question 9 Jacketed multiconductor cable assemblies installed outdoors for a PV system shall be secured a minimum of every _______ feet. A. 10 B. 3 C. 6 D. 4 Copyright 2005 Ted "Smitty" Smith

Question 9 answer C. 6 690.31(D) Copyright 2005 Ted "Smitty" Smith

Question 10 What is the minimum sized copper equipment grounding conductor that can be used for the PV output circuits on a PV system if they have a maximum output of 100 amperes and they are protected by a 125 ampere overcurrent protective device? A. 8 B. 6 C. 4 D. 2 Copyright 2005 Ted "Smitty" Smith

Question 10 Answer B 690.45 and T250.122 Copyright 2005 Ted "Smitty" Smith

End of Drill Click on this slide to continue to the repeat of the questions. The timer will not operate in this section. Click on each slide to advance. Review the questions and look up the answers. Copyright 2005 Ted "Smitty" Smith

Question 1 Circuit conductors between dc-to-dc converters and from dc-to-dc convertors to the common connection point of the dc system is the definition of: A. Diversion Charge Controller B. DC-to-DC Converter Source Circuit C. DC-to-DC Converter Output Circuit D. None of the above Copyright 2017 Ted "Smitty" Smith

Question 1 Answer 690.2 Definitions B. Copyright 2005 Ted "Smitty" Smith

Question 2 Which of the following is not something that is required to be isolated from conductors that are not solidly grounded on a photovoltaic system? A. Universal Power Monitor B. PV Modules C. dc-to-dc converters D. inverters Copyright 2016 Ted "Smitty" Smith

Question 2 Answer A 690.15 Copyright 2005 Ted "Smitty" Smith

Question 3 The isolating device for the equipment on a large scale photovoltaic electric power distribution production facility shall be permitted to be located more than ________ meters from the equipment where written safety procedures and conditions of maintenance that only qualified persons service the equipment. A. 3.1 B. 6.7 C. 1.8 D. 2.9 Copyright 2005 Ted "Smitty" Smith

Question 3 answer C 691.9 Copyright 2005 Ted "Smitty" Smith

Question 4 Isolating devices or equipment disconnecting means shall be installed in circuits connected to equipment at a location within the equipment, or within line of sight and within _______ feet of the equipment. A. 10 B. 8 C. 25 D. 50 Copyright 2017 Ted "Smitty" Smith

Question 4 Answer A 690.15(A) Copyright 2017 Ted "Smitty" Smith

Question 5 Which of the following can NOT be used to contain DC circuits of a PV system that are run inside of a building? Metal enclosures from the point of penetration of the surface of the building to the first readily accessible disconnecting means Metal raceway Encasement in 1” of concrete Type MC metal clad cable that complies with 250.118(10) Copyright 2005 Ted "Smitty" Smith

Question 5 C 690.31(G) Copyright 2005 Ted "Smitty" Smith

Question 6 Stand alone Photovoltaic systems operating at ________volts dc or greater between any two conductors shall be protected by a listed PV arc-fault circuit interrupter or other system components listed to provide equivalent protection. A. 50 volts B. 80 volts C. 120 volts D. 240 volts Copyright 2005 Ted "Smitty" Smith

Question 6 answer B 690.11 Copyright 2005 Ted "Smitty" Smith

Question 7 An adjustable electronic overcurrent protective device rated or set in with 240.6 is acceptable for providing overcurrent protection for PV system DC circuits? A. Yes B. No Copyright 2005 Ted "Smitty" Smith

Question 7 answer A. Yes 690.9(B)(3) Copyright 2005 Ted "Smitty" Smith

Question 8 According to the NEC a large scale photovoltaic electric power production facility has a generating capacity of at least ______________ megawatts and it is not under exclusive utility control. A. 1 MW B. 3 MW C. 5 MW D. 10 MW Copyright 2005 Ted "Smitty" Smith

Question 8 answer C 691.1 Scope Copyright 2005 Ted "Smitty" Smith

Question 9 Jacketed multiconductor cable assemblies installed outdoors for a PV system shall be secured a minimum of every _______ feet. A. 10 B. 3 C. 6 D. 4 Copyright 2005 Ted "Smitty" Smith

Question 9 answer C. 6 690.31(D) Copyright 2005 Ted "Smitty" Smith

Question 10 What is the minimum sized copper equipment grounding conductor that can be used for the PV output circuits on a PV system if they have a maximum output of 100 amperes and they are protected by a 125 ampere overcurrent protective device? A. 8 B. 6 C. 4 D. 2 Copyright 2005 Ted "Smitty" Smith

Question 10 Answer B 690.45 and T250.122 Copyright 2005 Ted "Smitty" Smith

End of Drill Click on this slide to continue to the repeat of the questions. The timer will not operate in this section. Click on each slide to advance. Review the questions and look up the answers. Copyright 2005 Ted "Smitty" Smith