DAQ Racks, Bins and Modules Internal Design Review

Slides:



Advertisements
Similar presentations
Wireless Deployment : Site Survey Access Network SID ETP – Groupement Télécoms - 25 Mai 2005.
Advertisements

Oregon Joint Use Equipment Code Descriptions Standards Subcommittee.
Install L2 Switch Head End CATV
Easy Set-Up Instructions
Veilux Fiber Optic Transceiver
NEMO Fase1 OPTICAL DATA TRANSPORT F. Ameli, M. Bonori, I.N.F.N. Sez. Roma1. VLVυT - Amsterdam 5-8 October Architecture Working Group NEMO Phase 1.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
ESE – Andrew Rusek Applications of Computer Modeling in Electromagnetic Compatibility (EMC) Tests (Part1) P8. Field Pattern of Three Radiating.
Industrial Solutions and Services Your Success is Our Goal EMC Testing for Emission and Immunity Diethard E. C. Moehr, I&S CTF EMC.
Lecture Exam Monday 5:30 – 6:30 bring a blue bubble sheet lab sections 10, 11, 12 take test in Classroom Building 302 lab sections 13, 14, 15 take test.
AtacamaLargeMillimeterArray Back End Preliminary Design Review, 2002 April 24-25, Granada, Spain Fibre Optic Links for IF DTS Roshene McCool Jodrell Bank.
1 RPC HV cable pick-up noise issue C. Lu, Princeton University (10/26/2008) I pulled out some slides from my old DocDB files (DocDB#2209 and #406), and.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
Duties of a system administrator. A system administrator's responsibilities typically include:
RFI measurements at the WSRT Hans van der Marel ASTRON RFI Mitigation workshop, Groningen, March 2010.
SJD / TAB1 Fiber Tasks Preliminary Design Review December 5, 2001.
System Elements HighPoint Broadband Delivery System Sector 1 Sector 3
Racks, Bins & Modules PDR Paul Harden 17 June 2002 EVLA Vertex Room ( and other mechanical considerations) This file has been modified from the original.
James Robnett EVLA M&C Hardware PDR March EVLA Monitor and Control M&C Network.
7/26/01 Online MeetingStu Fuess Online Hardware News  d0olc u Recent hardware problems s Low level of errors in 1 of 4 CPUs, so wanted to get it replaced.
May Fiber Optic Technology Basics May 2008 WHY USE FIBER OPTICS?  Superior Signal Quality  Long Distance Signal Transmission  Protection from.
Control Building Fiber Preliminary Design Review December 5, 2001.
Electromagnetic shielding of the SQUID in the nEDM Experiment: Bolts and Nuts Andrei Matlashov, Michelle Espy, LANL, P What happens when SQUID is.
NCGS: Positioning NC today and for the future! North Carolina Geodetic Survey Maintenance of a CORS/RTN infrastructure.
Noise studies: hardware tests and preliminary results Anna, Anton, Giovanni, Pigi, Silvia, A. Boiano, A. Vanzanella.
Physical Transmission
1 W. Owen – ISECON 2003 – San Diego Designing Labs for Network Courses William Owen Michael Black School of Computer & Information Sciences University.
Thomas Berenz, MPIfR Bonn1 RF fiber optics 4 th SKADS Workshop, Lisbon, 2-3 October 2008 RF fiber optics Analog RF transmission with mechanically stressed.
Site Construction & Installation Services
Mr C Johnston ICT Teacher BTEC IT Unit 05 - Lesson 02 Network Devices.
ANCIT WORKSHOP Torino, March ANCIT WORKSHOP Torino, March 1998.
Dan MertelyEVLA Feeds CDR 17 February RFI Concerns Relating to EVLA Feeds Dan Mertely.
Free Space Optics Equipment Last Update Copyright 2011 Kenneth M. Chipps Ph.D. 1.
Communications & Computer Networks Resource Notes - Network Hardware
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
RF over Fiber - Application Riedel solutions for broadcast applications 1 Application Examples – RF over Fiber.
PUBLIC UTILITIES COMMISSION OF LATVIA Broadband wholesale: first steps in Latvia Laura Juhansone - Daugule Expert of Authorisation Division, Electronic.
ELENA installation progress F. Butin / ELENA collaboration.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Example of a LAN Last Update Copyright 2009 Kenneth M. Chipps Ph.D.
Fermilab 21cm Morocco Site Evaluation Status Kermit Carlson John Marriner Dave McGinnis Ralph Pasquinelli December 22, 2008.
Future LBO Developments
RFI Protection Activities in IAA RAS
RFI Protection Activities in IAA RAS
The Elimed Control System approch
Redundancy Switching Components
Fiber Installation Preliminary Design Review
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
LO/IF System Requirements
Hardware Needs (Near Term)
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
EVLA LO/IF Racks/Bin/Modules
EVLA System PDR System Overview
EVLA M/C Software PDR, 14 May 2002
HCAL HV splice box.
How Computers Work.
EVLA MONITOR & CONTROL CDR
Communications & Computer Networks Resource Notes - Network Hardware
Open Rack Specification 2.1 Update
EVLA Racks Bins and Modules PDR
EVLA Advisory Committee Meeting System Status
Oregon Joint Use Equipment Code Descriptions
EVLA Advisory Panel Mtg. System Overview
Tunnel hardware installation
Akraino Lab IT Requirements for 2019 Budget
Presentation transcript:

DAQ Racks, Bins and Modules Internal Design Review June 17, 2002 S.Durand / T.Baldwin

Next Topic S.Durand / T.Baldwin

Vertex Splice Enclosure S.Durand / T.Baldwin

MCB Network Hardware 1 Gbit/s Transceivers Typical Equipment used to determine RFI Will be installed in shielded enclosure in the Antennas S.Durand / T.Baldwin

Preliminary RFI Testing of the MCB Hardware Chamber test with 2 of 5 Switches Large # of strong discrete signals near 1GHz -66 dBW EIRP @1 GHz This is 89 dB stronger than –155 dBW limit The RFI Cabinet Provided 25dB of shielding from 1-4 GHz S.Durand / T.Baldwin

Fiber Cable Lab S.Durand / T.Baldwin

Areas of Investigation Power supply filtering Grounding of Enclosures Grounding of metal parts of Switches Move the MCB cabinet to Ped Room Cable Wrap Location S.Durand / T.Baldwin