24 th Street Improvements Project CEQA Public Hearing for Certification of Final Environmental Impact Report January 16, 2014.

Slides:



Advertisements
Similar presentations
Fairfax County Board of Supervisors Transportation Sub-Committee Briefing Federal Highway Administration Eastern Federal Lands Highway Division Robert.
Advertisements

Welcome Interstate I-66 / Route 28 Preliminary Study Stakeholder Workshop May 29, 2012.
Resource Team/TEER Meeting October 19, CBRT Meeting October 19, 2006 Agenda 10:00 AM 10:05 AM 10:30 AM 11:30 AM Noon Introductions and Housekeeping.
April 25, 2012 ODOT Planners Meeting. 2 Purpose of Project Improve mobility and safety for people and freight for local, regional, and through travel.
Update on the Congestion Management Process (CMP) Freight Subcommittee March 11, 2010 Wenjing Pu and Andrew Meese National Capital Region Transportation.
Neighborhood Meeting No.2 Golden Gate Bridge, Highway and Transportation Districts San Francisco Mid-Day Bus Parking Facility Contract No BT-1 March.
WARD LAKE MASTER PLAN Public Input Workshop #1 July 14, 2011.
Mead Valley Municipal Advisory Council October 17, 2012
VOORBLAD.
Southside Flood Protection Red River Channel Extension Clay County Courthouse September 8, 2008.
Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
City Council Hearing March 3, 2008 SIERRA POINT BIOTECH PROJECT.
CR 46A Realignment (Section 5)
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
R Street Improvement Project (30% Review Meeting) February 28, 2007 PUBLIC MEETING WELCOME Feel Free to View the Exhibits The Presentation will Begin at.
Public Scoping Meetings September 26, 2011 and September 29, 2011 Cajalco Road Widening and Safety Enhancement Project.
City of St Helena Upper York Creek Ecosystem Restoration Project April 28, 2015 St. Helena City Council Meeting.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Public Location/Design Hearings November 17, 2010 Laughlin, Nevada November 18, 2010 Bullhead City, Arizona.
Division of Local Assistance Office of Special & Discretionary Programs December 2, 2010.
EEM Established in 1989 Section of the Streets and Highways Code provides the Legislature with the authority to allocate $10 million annually. Fiscal.
Jason Hade, Regional Planner Kern COG Workshop – November 21, 2002 High-Speed Rail for the Kern Region Kern Council of Governments.
S.R. 144 Intersection Improvement and Road Reconstruction Project Tuesday, October 11, :30pm Presentation Neil A. Armstrong Elementary School 1000.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Department of Transportation Final Recommendation of SR-710 Pasadena Working Group Regarding Proposed Alternatives for SR-710 North Project Council Meeting.
Anacostia Streetcar Phase 2 Environmental Assessment & Section 106 Evaluation: Community Workshop January 12, 2011.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
STATE ROUTE 1 ALAMITOS BAY BRIDGE IMPROVEMENT PROJECT SCOPING MEETING AUGUST 5, :00 p.m.Open House 6:30 p.m.Presentation 7:00 p.m.Public Comment.
Dallas County Area Transportation Projects Update Dallas County Commissioner John Wiley Price.
Department of Transportation Consideration of Potential City of Pasadena Position Related to SR710 Extension Alternatives Being Considered By Metro City.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
Project Location Map Contents of Presentation Welcome Project Location Map Contents of Presentation Agency Involvement & Responsibilities Project Purpose.
STA Safety Project PID #76439 December 12, 2006.
Texas Department of Transportation Corpus Christi District Harbor Bridge Project U.S. 181 (Harbor Bridge)/SH 286 (Crosstown Expressway) Citizens Advisory.
Winery Ordinance Update Scoping Meeting for the Environmental Impact Report County of Santa Barbara July 16, 2014.
Planning & Community Development Department Conditional Use Permit #5029 and Other Land Use Entitlements: Final Environmental Impact Report and Statement.
Department of Transportation Submittal of Comments to Caltrans Regarding the Draft Environmental Impact Report/Environmental Impact Statement and Proposed.
TEAM Presentation January 21, Overview Top MoDOT Priority Top MoDOT Priority A Funding challenge A Funding challenge Desperately needed Desperately.
Public Involvement Meeting December 10,  Introduce the project  Explain the benefits of the project  Discuss tasks completed since last public.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
I-66 Corridor Improvements Morteza Farajian Interstate 66 Corridor Improvements From US Route 15 in Prince William County To Interstate 495 in Fairfax.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Freeway Planning Process Michelle Bitner Project Manager Kern Council of Governments.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, January 21, 2016.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
City and County of San Francisco Scoping Meeting Environmental Impact Report (EIR) PURPOSE To solicit participation in determining the scope.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Planning & Community Development Department Contract to provide Environmental Consulting Services for the Rehabilitation and Reuse of the Pasadena YWCA.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Alternative Alignments Public Meeting
Secor Road Reconstruction Project Public Meeting #2
Scoping Meeting April 20th 6:00 pm
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Willow Meadows Civic Club Meeting September 13, 2011
Project Status & Right-of-Way Acquisition
Public Workshop #1 August 18, 2010.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
I Street Bridge Replacement Project
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

24 th Street Improvements Project CEQA Public Hearing for Certification of Final Environmental Impact Report January 16, 2014

Notice of Preparation Circulated April 11, 2008 to May 12, 2008 Public Scoping Meeting held April 30, 2008 Draft Environmental Document Circulated from May 23, 2012 to July 16, 2012 Caltrans Public Hearing (NEPA) held June 26, 2012 Planning Commission Public Hearing (CEQA) held July 5, Whats Happened So Far:

Notification/Mailing Area

24 th Street Improvements Project State Freeway System in Metropolitan Bakersfield

24 th Street Improvements Project Projects to improve the SR 58/SR 178 Corridor SR-178 (WIDEN) ROSEDALE HIGHWAY SR-178 AT FAIRFAX RD SR-178 at Morning Drive

24 th Street Improvements Project TRIP projects on SR 58/SR 178 Corridor SR-178 (WIDEN) ROSEDALE HIGHWAY SR-178 AT FAIRFAX RD 24 TH STREET IMPROVEMENT PROJECT SR-178 at Morning Drive

From 1971 Caltrans Study of Freeway Alignments

ROUTE 178 CORRIDOR STUDY Prepared For: KERN COG, CALTRANS, CITY OF BAKERSFIELD Prepared By: Barton-Aschman Associates, Inc. December 1986 Additional Studies:

10

11

Enhanced Landscaping for Median and Parkway Areas Eliminated B Street access to 24 th, install cul-de-sac Installed raised/striped median for NB Oak Right-Turn Eliminated two proposed bus turnouts between Cedar and A Streets Eliminated WB Left-turns at Beech, Spruce and Cedar Streets Eliminated EB Left-turns at Spruce and Cedar Streets Shifted Elm Street cul-de-sac north 24 th Street Improvements Project Changes from Draft Environmental Document:

Based on: Public Comments and Concerns Received (over 1700) Results of Engineering and Environmental Technical Studies Superior Engineering Design (Less Driveways) More efficient Traffic Movement Smaller relative impact to Potential Historic Districts Fewer Full Parcel Acquisitions from the two Districts Larger District to North, so less percentage impact to District Smaller lots on north result in smaller residual property remainders after project Cost is slightly less 24 th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

24 th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

24 th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

24 th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

24 th Street Improvements Project Alternative No. 1 – Widen to the North Selected as Preferred Alternative

24 th Street Improvements Project Two Potential Historic Districts For This Project Only

Thank You Landscaping Concept Roland Genick