Enhanced Direct Link Setup in nDLS

Slides:



Advertisements
Similar presentations
LB84 General AdHoc Group Sept. Closing TGn Motions
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
IEEE White Space Radio Contribution Title
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
3GPP liaison report May 2006 May 2006 Date: Authors:
Motion to accept Draft p 2.0
Protected SSIDs Date: Authors: March 2005 March 2005
3GPP liaison report July 2006
[place presentation subject title text here]
(Presentation name) For (Name of group) (Presenter’s name,title)
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
Contribution on Location Privacy
November Opening Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2012 Opening Report Date: Authors: July 2012
TGu Closing Report Date: Authors: September 2005
ADS Study Group Mid-week Report
DLS Link Timeout Date: Eunkyo Kim
Selection Procedure Recommendation
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
November Opening Report
TGr Proposed Draft Revision Notice
Off-channel selection
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
3GPP2 Liaison Report Date: Authors: May 2006 May 2006
May 2005 CAPWAP AHC Closing Report
Liaison Report From Date: Authors: Month Year
Beamforming and Link Adaptation Motions
Path Selection and Path Switch Mechanism
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
Transition Nowhere Date: Authors: Sept 2005 Sept 2005
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
WNG SC Closing Report Date: Authors: November 2005
PSMP Adhoc Oct TGn Adhoc
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Use of KCK for TGr Management Frame Protection
Use of KCK for TGr Management Frame Protection
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

Enhanced Direct Link Setup in nDLS September 2007 Enhanced Direct Link Setup in nDLS Date: 2007-09-18 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Yongho SEOK, LG Electronics

QAP-initiated Operation is Possible ! September 2007 DLS in QBSS QSTA1 QAP QSTA2 1a 1b 2a 2b QAP-initiated Operation is Possible ! 1b Transmission failure - Retransmission or - QAP-initiated DLS teardown 2a Transmission failure - QAP-initiated DLS teardown 2b Transmission failure - Retransmission Yongho SEOK, LG Electronics

nDLS in BSS (1/2) Two-way handshake September 2007 AP Encapsulated DATA frame (nDLS Request) 1a 2a Encapsulated DATA frame (nDLS Response) QSTA2 QSTA1 AP-initiated Operation is Impossible ! 1a or 2a Transmission failure - Nothing Yongho SEOK, LG Electronics

nDLS in BSS (2/2) Problem of two-way handshake Inconsistent September 2007 nDLS in BSS (2/2) Problem of two-way handshake Inconsistent Drop !! . . Encapsulated DATA frame (nDLS Response) Encapsulated DATA frame (nDLS Response) AP 1a 2a What happens if encapsulated DATA frame (nDLS Response) drops at AP ? QSTA1: not completing nDLS QSTA2: completing nDLS QSTA2 QSTA1 Yongho SEOK, LG Electronics

Enhanced Direct Link Setup in nDLS (1/2) September 2007 Enhanced Direct Link Setup in nDLS (1/2) Three-way handshake QSTA1’s Capability Info. AP Encapsulated DATA frame (nDLS Request) QSTA2’s Capability Info. 1a 2a Encapsulated DATA frame (nDLS Response) 3a New Control Message Encapsulated DATA frame (nDLS Confirmation) QSTA2 QSTA1 EDCA Parameter Set Yongho SEOK, LG Electronics

Enhanced Direct Link Setup in nDLS (2/2) September 2007 Enhanced Direct Link Setup in nDLS (2/2) Timing Diagram QSTA1 AP QSTA2 DATA (nDLS Request) DATA (nDLS Request) DATA (nDLS Response) DATA (nDLS Response) . . . TIMEOUT Drop DATA (nDLS Response) DATA (nDLS Response) DATA (nDLS Confirm) DATA (nDLS Confirm) Yongho SEOK, LG Electronics